Operation and Maintenance Supervisor
SAWACO Water Desalination
Total years of experience :14 years, 8 Months
Maintaining several desalination plants of different capacities from 1000-25000 M3/D in Jeddah City
5000 M3/D SWRO and 1000 M3/D BWRO facility Plant Installation, Commissioning, Start Up and Operation of plant in Jeddah Stores City, Operation and Maintenance of SWRO and BWRO,
•Ministry of Water, Environment and Agriculture, AlKharj BWRO
, Commissioning and Shut down Major Maintenance of BWRO, SWRO Water, Wastewater MBR and Conventional Sewage Treatment Plants.
•Pre-Commissioning and Commissioning, Initial startup after Installation of machines e.g. Air Blowers, High Pressure Pumps, Feed Pumps, Air Compressors, PX systems for SWRO and all mechanical equipment and instruments as per manufactures check list and after setting of parameters as per design.
•Vibration analysis, Sound Levels monitoring of Pumps and reducing them by Alignment and as per standard procedures.
•Supervision of Controls by SCADA and DCS system for Flows, Setting of Recoveries for RO membranes, Set points of chemical Dosing pumps, Calibration of Flow Meters, Pressure Switches, ORP, PH, TDS, Conductivity, Turbidity and SDI Meters.
•Shaft Alignment of High Pressure and Low Pressure pumps for RO feed and RO discharge Flows.
•Setting of VFDs as per required Flow for desired operation.
•Calibration of Chemical Dosing Pumps and metering pumps.
•Maintaining day to day activity of preventive and corrective maintenance.
Completed Projects under Suido Kiko Middle East.
•SAWACO Water Desalination, Stores City Jeddah
50000 M3/D BWRO Plant Installation, Commissioning (Dry and Wet) Start Up and Operation of whole plant in AlKharj city Riyadh Province. Operation and Maintenance of BWRO maintaining all mechanical equipment’s
•CHIYODA Corporation Tokyo Japan in Dammam-1 Saudi Arabia.
5000 M3/D Industrial Water Reclamation Plant Installation in Dammam Industrial City-1(
Najran Province
Riyadh
8000 m3/day UF MBR Water Treatment Plant by Pentair (Ex-Norit) Netherlands X-Flow t Installation, Commissioning and Operation of membranes skids, interfering DCS system, installation of Suction pumps, installation of Aerzen Blowers
M/Day Combined MBR and CSTP Shut down Maintenance of 30000 m3/D MBR WWT Plant and 30000 m3/D Conventional WWTP, Maintenance of all Mechanical Equipment used in Water treatments e.g. Blowers, Pumps, Dewatering Machines, Maintenance of Diesel Generators, Control Systems, Power sharing systems, and new Installations of MBR systems for Waste Water Treatment Plants. Making new designs for better performance of treatment of WW and SW.
•NWC AL-KHUMRA 6 Waste Water Treatment Plant
Maintenance of the 50000 m3/d WWTP for the National Water Company (Ministry of Electricity and Power KSA). Maintenance of all mechanical related equipment’s like Power Generators, Air Blowers, PT machines, Dewatering machines, all type of pumps. Making improvements in SCADA systems for better results and control.
(2 years 6 months)
(13 months) LAHORE-ISLAMABAD ON M2
•NT INDUSTRIES KOT ABDUL MALIK LAHORE.
,Bachelor of Technology Honors