ROLE AND RESPONSIBILITY Major Project: ➢ Testing and Commissioning of MDB, MCC, PLC, SCADA PANEL & Security systems. ➢ Timely execution of Preventive and Corrective Maintenance activities assigned ➢ Testing and Commissioning of motor starter panels. ➢ Testing and Commissioning of streetlight. ➢ DWC Airport, ➢ Empower, Distric cooling plants. ➢ DM, Irrigation and Sewage Pump Station
ROLE AND RESPONSIBILITY Major Project: ➢ Testing and Commissioning of MDB, MCC, PLC, SCADA PANEL & Security systems. ➢ Timely execution of Preventive and Corrective Maintenance activities assigned ➢ Testing and Commissioning of motor starter panels. ➢ Testing and Commissioning of streetlight. ➢ DWC Airport, ➢ Empower, Distric cooling plants. ➢ DM, Irrigation and Sewage Pump Station
Company: SIEMENS L.L.C
Division: IC, LMV, MV (Abu Dhabi)
Designation: Electrical Technician
Duration: From 22-January 2012 to till date
ROLE AND RESPONSIBILITY
➢ Supervision of all types of panels (MV, MDB, MCC, SMDB, FDB, PFC, VSD/VFD, ESB & DB) on the shop floor in electrical assembly and wiring section.
➢ To carry out installation & Preventive maintenance in 132KV, 33KV, 22KV & 11KV Substations.
➢ Complete all documents of inspection, maintenance and repair works, failures and recommendations
➢ To make sure that panel board Assembly and wiring completed on targeted time.
➢ Co- ordination with Engineering and other concerned departments during the manufacturing, regarding the control components and others panel assembly parts.
➢ Complete Switchgear Assembly, mainly Control Wiring with BMS and SCADA Signaling Facility as per client requirement and Engineering Drawing.
➢ Attending Site for complaints and Modification work at the time of installation panel boards at site standard and customized panel.
➢ To handle all types of assembly and wiring tools including air pressure, manual and electrical tools to carry out the tasks successfully.
➢ To make the panels ready for Testing and assist during the FAT.
➢ To carry out all stores and warehousing activities and maintain the inventory project wise.
Company: TAMCO Middle East
Jebel Ali Free Zone Authority, P.O. Box-17085 U.A.E. (Dubai)
Division: Testing and Inspection
Designation: Quality controller
Duration: From June 2003 to January 2011
ROLE AND RESPONSIBILITY
➢ Testing and Commissioning of M.V, L.V, Power, Telephone, Lighting & Fire & Security systems.
➢ Timely execution of Preventive and Corrective Maintenance activities assigned
➢ Testing and Commissioning of Generator change over panels.
➢ Testing and Commissioning of motor starter panels.
➢ Testing and Commissioning of streetlight.
➢ Testing and Commissioning of grounding network system.
➢ Carry out installation and wiring of CCTV equipments.
➢ Supervisor of cable lying of MV (XLPE), Power, Telephone, Lighting and Control Cable.
➢ Installation of MV, LV Switchgears.
➢ Installation of motor control panels.
➢ Installation of D.C. banks and battery charges panels.
➢ Installation of cable trays and conduct works.
➢ Installation of earthing system for transformer, motors, HT, MV &LV.
Division: IC, LMV, MV (Abu Dhabi)
Designation: Supervisor Electrical
Duration: From 22-January 2012 to till date
ROLE AND RESPONSIBILITY
➢ Supervision of all types of panels (MV, MDB, MCC, SMDB, FDB, PFC, VSD/VFD, ESB & DB) on the shop floor in electrical assembly and wiring section.
➢ To carry out installation & Preventive maintenance in 132KV, 33KV, 22KV & 11KV Substations.
➢ Complete all documents of inspection, maintenance and repair works, failures and recommendations
➢ To make sure that panel board Assembly and wiring completed on targeted time.
➢ Co- ordination with Engineering and other concerned departments during the manufacturing, regarding the control components and others panel assembly parts.
➢ Complete Switchgear Assembly, mainly Control Wiring with BMS and SCADA Signaling Facility as per client requirement and Engineering Drawing.
➢ Attending Site for complaints and Modification work at the time of installation panel boards at site standard and customized panel.
➢ To handle all types of assembly and wiring tools including air pressure, manual and electrical tools to carry out the tasks successfully.
➢ To make the panels ready for Testing and assist during the FAT.
➢ To carry out all stores and warehousing activities and maintain the inventory project wise
➢ Testing and Commissioning of M.V, L.V, Power, Telephone, Lighting & Fire & Security systems.
➢ Timely execution of Preventive and Corrective Maintenance activities assigned
➢ Testing and Commissioning of Generator change over panels.
➢ Testing and Commissioning of motor starter panels.
➢ Carry out installation and wiring of CCTV equipments.
➢ Supervisor of cable lying of MV (XLPE), Power, Telephone, Lighting and Control Cable.
➢ Installation of MV, LV Switchgears.
➢ Installation of motor control panels.
➢ Installation of earthing system for transformer, motors, HT, MV
Company: M/S. E&I Engineering Karachi Pakistan
Designation: "Electrical Technician"
Duration: Feb 2001 to May 2003
PROJECT WORKED FOR IN UAE
Installation, Commissioning and testing projects
No. Project Name Substation rating From To Sector
SUMMARY: 13 Years of experience in the field of Electrical and Power Control Systems.
Company: SIEMENS L.L.C
Company: M/S. Diversified Equipment Co. Karachi Pakistan.
Division: Electrical
Designation: Assistant Electrical Engineer
Duration: July 1997 to July 1998
❖ "Diploma" of Associates Engineering (In Electrical) From Sindh Board of Technical Education Karachi