Total Years of Experience: 10 Years, 9 Months
January 2019
To November 2019
Sr. QA/QC Engineer
at TAMIMI INDUSTRIAL SERVICES
Location :
Saudi Arabia - Jubail
Worked as Aramco Approved QC Welding Supervisor for Rastanura Refinery Project.
May 2014
To July 2018
Sr. QA/QC Engineer
at SENDAN INTERNATIONAL CO. LTD
Location :
Saudi Arabia - Jubail
Quality Management:
• Team Management
• Documentation
• Auditing
• Reporting
Inspection:
• Piping/Welding
• NDE
• EQUPMENT (Rotary/Stationary)
• Structure
• Storage Tanks
Job Responsibilities:
•Leading the team of inspectors their deployment on jobs, mobilization plan, performance monitoring.
•Pre shutdown activities, study of scope work, preparation of PQP/ITP.
•Develop WPS/PQR for both Plate & Pipes and conduct Welders Performance Test & Qualification as per ASME Section IX.
•Attend coordination meetings, review of QA/QC documents / procedures and final documentation as per client’s dossier requirements.
•Issue, keep records of Non Conformance Report (NCR) as appropriate when there is a deviation to project specification.
•Reviewing & approving technical queries raised by planning department.
•Maintaining equipment calibration and log.
•Preparation of Weld Rejection Rate Report on weekly & monthly basis in terms of joints & linear basis. Arrange tool box talks to control Repair percentage of welders.
•Review of RT Films.
•Review weld summary with NDT, RT, DPT/MPI, PWHT, PMI & Hardness test.
•Witness of the Hydro, Pneumatic testing for piping and valves.
•Stage and final of Inspection of complete equipment i.e. Pressure Vessels, Storage Tanks with client & ASME inspector.
•Provide third party inspection of all the repair and internal modification work, nozzles replacement with ASME Inspector on Pressure Vessels, Drums and “R” stamp marking on name plates.
•Inspection and surveillance on installation and alignment of various static and rotating equipment’s, heat exchangers, pressure vessels, pumps.
•Inspection for Storage Tanks Bottom replacement.
•Co-ordinate with PSSR team for Final Walk Through and issuance of Mechanical Completion Certificate (MCC).
•Preparation of Final dossier.
• Team Management
• Documentation
• Auditing
• Reporting
Inspection:
• Piping/Welding
• NDE
• EQUPMENT (Rotary/Stationary)
• Structure
• Storage Tanks
Job Responsibilities:
•Leading the team of inspectors their deployment on jobs, mobilization plan, performance monitoring.
•Pre shutdown activities, study of scope work, preparation of PQP/ITP.
•Develop WPS/PQR for both Plate & Pipes and conduct Welders Performance Test & Qualification as per ASME Section IX.
•Attend coordination meetings, review of QA/QC documents / procedures and final documentation as per client’s dossier requirements.
•Issue, keep records of Non Conformance Report (NCR) as appropriate when there is a deviation to project specification.
•Reviewing & approving technical queries raised by planning department.
•Maintaining equipment calibration and log.
•Preparation of Weld Rejection Rate Report on weekly & monthly basis in terms of joints & linear basis. Arrange tool box talks to control Repair percentage of welders.
•Review of RT Films.
•Review weld summary with NDT, RT, DPT/MPI, PWHT, PMI & Hardness test.
•Witness of the Hydro, Pneumatic testing for piping and valves.
•Stage and final of Inspection of complete equipment i.e. Pressure Vessels, Storage Tanks with client & ASME inspector.
•Provide third party inspection of all the repair and internal modification work, nozzles replacement with ASME Inspector on Pressure Vessels, Drums and “R” stamp marking on name plates.
•Inspection and surveillance on installation and alignment of various static and rotating equipment’s, heat exchangers, pressure vessels, pumps.
•Inspection for Storage Tanks Bottom replacement.
•Co-ordinate with PSSR team for Final Walk Through and issuance of Mechanical Completion Certificate (MCC).
•Preparation of Final dossier.
January 2018
To June 2018
Sr.QA/QC ENGINEER
at SENDAN INTERNATIONAL
Location :
Saudi Arabia - Jubail
REPLACEMENT OF EXIXTING HEATER AND RELATED PIPING AT IBN-ZAHR
May 2017
To December 2017
Sr. QA/QC Engineer
at SENDAN INTERNATIONAL
Location :
Saudi Arabia - Jubail
MOC's SERVICES AT SAUDI KAYAN TA-17
March 2017
To May 2017
Sr. QA/QC Engineer
at SENDAN INTERNATIONAL CO. LTD
Location :
Saudi Arabia - Jubail
2EG/2UTL PIPING & VALVES JOB TAM 2017, SHARQ, JUBAIL
January 2017
To February 2017
Sr. QA/QC ENGINEER
at SENDAN INTERNATIONAL CO. LTD
Location :
Saudi Arabia - Jubail
IMPLEMENTATION OF MOC’S AT UNITED EG2, CO2 & LAO, UNITED, JUBAIL
October 2016
To December 2016
Sr. QA/QC ENGINEER
at SENDAN INTERNATIONAL CO. LTD
Location :
Saudi Arabia - Jubail
IMPLEMENTATION OF MOC’S AT YASREF (YANBU ARAMCO REFINERY), YANBU
August 2016
To September 2016
Sr. QA/QC ENGINEER
at SENDAN INTERNATIONAL CO. LTD
Location :
Saudi Arabia - Jubail
i) UPGRADING BENZENE
INFRASTRUCUTRE (BOTTOM PLATE
REPLACEMENT FOR TANK 53TK13 &
71TK8)
ii) UPGRADE OF PO4 & ELIMINOX
PUMPS
iii) NATURAL GAS BLACK POWDER
FILTER
iv) SALT PLANT STRUCTURAL STEEL
REPLACEMENT
INFRASTRUCUTRE (BOTTOM PLATE
REPLACEMENT FOR TANK 53TK13 &
71TK8)
ii) UPGRADE OF PO4 & ELIMINOX
PUMPS
iii) NATURAL GAS BLACK POWDER
FILTER
iv) SALT PLANT STRUCTURAL STEEL
REPLACEMENT
April 2016
To July 2016
QA/QC ENGINEER
at SENDAN INTERNATIONAL CO. LTD
Location :
Saudi Arabia - Jubail
i) IMPLEMENTATION OF MOC’S AT
UNITED
ii) UPGRADATION OF DEG‐ALDEHYDE
SYSTEM AT UNITED
UNITED
ii) UPGRADATION OF DEG‐ALDEHYDE
SYSTEM AT UNITED
February 2016
To March 2016
QA/QC ENGINEER
at SENDAN INTERNATIONAL CO. LTD
Location :
Saudi Arabia - Jubail
i) INSTALLATION OF EXPANSION
VESSEL AT EO SUPPLY LINE TO THE
ETHOXYLATE
ii) INSTALLATION OF OMS WITH
NITROGEN SURGE DRUM, SABIC/SAUDI KAYAN
VESSEL AT EO SUPPLY LINE TO THE
ETHOXYLATE
ii) INSTALLATION OF OMS WITH
NITROGEN SURGE DRUM, SABIC/SAUDI KAYAN
June 2015
To January 2016
QA/QC ENGINEER
at SENDAN INTERNATIONAL CO. LTD
Location :
Saudi Arabia - Jubail
i) UPGRADATION OF MATERIAL
HANDLING SYSTEM
ii) REVAMPING OF DE‐DUSTING
SYSTEM
iii) REPLACEMENT OF ROUGHING MILL
STAND FOR ROD MILL‐I, SIEMENS VAI /SABIC/HADEED
HANDLING SYSTEM
ii) REVAMPING OF DE‐DUSTING
SYSTEM
iii) REPLACEMENT OF ROUGHING MILL
STAND FOR ROD MILL‐I, SIEMENS VAI /SABIC/HADEED
December 2014
To May 2015
QA/QC ENGINEER
at SENDAN INTERNATIONAL CO. LTD
Location :
Saudi Arabia - Jubail
IMPORT CO2 FROM UNITED (ISBL), SABIC /AL-BAYRONI
October 2014
To November 2014
QA/QC ENGINEER
at SENDAN INTERNATIONAL CO. LTD
Location :
Saudi Arabia - Jubail
INSTALLATION OF WASTE HEAT
BOILER SCR BED, TASNEE
BOILER SCR BED, TASNEE
May 2014
To September 2014
QA/QC ENGINEER
at SENDAN INTERNATIONAL CO. LTD
Location :
Saudi Arabia - Jubail
i) INSTALLATION OF TOLUENE DRAIN
FROM V‐3460 TO C‐3610
ii) TIN‐INS FOR TEG ALDEHYDE
REMOVAL SYSTEM FOR EG1 AND EG2
PLANT
iii) 5TH EFFECT EVAPORATOR
OVERHEAD LINE (SHUT DOWN)
iv)TO PROVIDE ISOLATION VALVE ON
EACH EXCHANGER E‐2322 A/B/C
v)UPGRADE METALLURGY OF LINE
FROM CS TO SS (SHUT DOWN), SABIC/UNITED
FROM V‐3460 TO C‐3610
ii) TIN‐INS FOR TEG ALDEHYDE
REMOVAL SYSTEM FOR EG1 AND EG2
PLANT
iii) 5TH EFFECT EVAPORATOR
OVERHEAD LINE (SHUT DOWN)
iv)TO PROVIDE ISOLATION VALVE ON
EACH EXCHANGER E‐2322 A/B/C
v)UPGRADE METALLURGY OF LINE
FROM CS TO SS (SHUT DOWN), SABIC/UNITED
February 2012
To April 2014
Welding Inspection Engineer
at CERTILAS NETHERLANDS B.V
Location :
Pakistan - Lahore
Welding and thermal spraying coating professional providing innovative solutions in maintenance, repair and wear protection for petrochemical & process industry.
Major Achievements:
• Played key role in designing and development of automated system for Flux cored arc welding.
• Innovative welding solutions for special materials.
• Introduced advanced thermal spray coating system for anti-abrasion and anti-corrosion applications.
Job Responsibilities:
• Responsible for all the activities regarding office, workshop and site, directly reporting to General Manager.
• Preparation of quotations against inquires of clients.
• Inspection & documentation of all welding activities at site and works.
• Assigning duties to welding staff during shut-down at sites and responsible for distribution of work to assistant engineers.
• Maintaining and scheduling all the record regarding workshop activities.
• Ensuring timely completion of jobs both at site and workshop.
• Technical negotiation with our clients regarding product and services of company.
• Providing solution for any kind of technical problems during site work.
• Providing innovative welding solutions to our clients.
• Progress Monitoring, Daily Progress Report (DPR) and Invoice making.
• Review, discuss & get approval of WPS, QIP’s, Procedures and other Inspection and testing requirements with client and implementation at sites.
• Review of all the client’s requirements and post inspection reporting of findings and observations.
• Responsible to make WPS & arrangement of PQR through previously qualified or by new qualification for different materials
• Maintaining all clients’ record.
• Preparation of working procedures for Thermal spray Coatings at works.
• Responsible for Maintaining all office records regarding import documents, Sales tax etc
Major Achievements:
• Played key role in designing and development of automated system for Flux cored arc welding.
• Innovative welding solutions for special materials.
• Introduced advanced thermal spray coating system for anti-abrasion and anti-corrosion applications.
Job Responsibilities:
• Responsible for all the activities regarding office, workshop and site, directly reporting to General Manager.
• Preparation of quotations against inquires of clients.
• Inspection & documentation of all welding activities at site and works.
• Assigning duties to welding staff during shut-down at sites and responsible for distribution of work to assistant engineers.
• Maintaining and scheduling all the record regarding workshop activities.
• Ensuring timely completion of jobs both at site and workshop.
• Technical negotiation with our clients regarding product and services of company.
• Providing solution for any kind of technical problems during site work.
• Providing innovative welding solutions to our clients.
• Progress Monitoring, Daily Progress Report (DPR) and Invoice making.
• Review, discuss & get approval of WPS, QIP’s, Procedures and other Inspection and testing requirements with client and implementation at sites.
• Review of all the client’s requirements and post inspection reporting of findings and observations.
• Responsible to make WPS & arrangement of PQR through previously qualified or by new qualification for different materials
• Maintaining all clients’ record.
• Preparation of working procedures for Thermal spray Coatings at works.
• Responsible for Maintaining all office records regarding import documents, Sales tax etc
November 2008
To April 2010
QA/QC ENGINEER
at DESCON ENGINEERING PVT LTD.
Location :
Pakistan - Lahore
Nov’ 2008 - Apr’ 2010: DESCON Engineering Pakistan as Inspection Engineer
Project : EnVen 1.3 ENGRO (World Largest) Expansion Project
Client : ENGRO Fertilizer Pakistan.
Major Achievements:
• Played key role for timely completion of all test packs of Utility area above ground piping, follow-up with third party inspection.
• Timely follow-up of all NDT activities and as-built to concerned FEDC department in order to meet pre-commissioning dates.
Job Responsibilities:
• Inspection and Testing of Mechanical Construction Activities like, Fabrication & Erection of Piping, Steel Structure. Monitor all-critical activities like, welding, NDT and Hydro-testing according to the Procedure, Quality Inspection Plan and Project Specifications.
• Involved in implementation of QIPS and PQPS for the project.
• Inspection of Piping and Structural Supports.
• Issuing internal NCR’s also ensuring NCR's are cleared by target dates.
• Maintaining quality records for NDE (DPT, RT, PMI), Inspection and testing activities.
• Inspection of above & underground piping like fit-up, welding inspection, coat-wrapping, holiday testing, sand blasting and painting etc.
• Test packs review, punch listing, punch killing till final hydro-testing of lines.
Project : EnVen 1.3 ENGRO (World Largest) Expansion Project
Client : ENGRO Fertilizer Pakistan.
Major Achievements:
• Played key role for timely completion of all test packs of Utility area above ground piping, follow-up with third party inspection.
• Timely follow-up of all NDT activities and as-built to concerned FEDC department in order to meet pre-commissioning dates.
Job Responsibilities:
• Inspection and Testing of Mechanical Construction Activities like, Fabrication & Erection of Piping, Steel Structure. Monitor all-critical activities like, welding, NDT and Hydro-testing according to the Procedure, Quality Inspection Plan and Project Specifications.
• Involved in implementation of QIPS and PQPS for the project.
• Inspection of Piping and Structural Supports.
• Issuing internal NCR’s also ensuring NCR's are cleared by target dates.
• Maintaining quality records for NDE (DPT, RT, PMI), Inspection and testing activities.
• Inspection of above & underground piping like fit-up, welding inspection, coat-wrapping, holiday testing, sand blasting and painting etc.
• Test packs review, punch listing, punch killing till final hydro-testing of lines.
February 2007
To November 2008
QC Engineer
at PRIME ENGINEERING WORKS (PVT) LTD
Location :
Pakistan - Lahore
Prime Engineering Works provides highly quality services in major Mechanical works for Power, Petro chemical and Telecommunication Sectors. Projects include Procurement, Erection and Fabrication of equipment's for the industries.
Major Achievements:
• Played key role in documentation and implementation of ISO 9001:2000.
Job Responsibilities:
• To streamline the production line as per requirements of the customers and in the development and execution of fabrication process, following DIN standards.
• Supervise and manage all activities regarding welding & NDT to make sure that all parameters are met in accordance with the approved procedures and specifications.
• Preparation of BOQs for job, arrangement and verification of material as per drawing.
• Designing and development of parts and assemblies for different projects using AutoCAD & Solid Works.
• Dimensional verification of all machining activities done on lath, shaper, milling machine are in accordance with drawings.
• Maintaining daily progress report & co-ordination with client inspector.
• Involved in preparation of Quality manual as per requirements of ISO: 9001-2000 and maintaining quality management system following the standards. Analyze and review documentation on department procedures and work instructions in the designated teams and ensure all current versions are available to ensure compliance with the requirements of the standard.
• Conducting Internal Audit to find out Non Conformities. Coordinate quality problem solving activities through corrective/preventive action (CAPA) process.
Major Achievements:
• Played key role in documentation and implementation of ISO 9001:2000.
Job Responsibilities:
• To streamline the production line as per requirements of the customers and in the development and execution of fabrication process, following DIN standards.
• Supervise and manage all activities regarding welding & NDT to make sure that all parameters are met in accordance with the approved procedures and specifications.
• Preparation of BOQs for job, arrangement and verification of material as per drawing.
• Designing and development of parts and assemblies for different projects using AutoCAD & Solid Works.
• Dimensional verification of all machining activities done on lath, shaper, milling machine are in accordance with drawings.
• Maintaining daily progress report & co-ordination with client inspector.
• Involved in preparation of Quality manual as per requirements of ISO: 9001-2000 and maintaining quality management system following the standards. Analyze and review documentation on department procedures and work instructions in the designated teams and ensure all current versions are available to ensure compliance with the requirements of the standard.
• Conducting Internal Audit to find out Non Conformities. Coordinate quality problem solving activities through corrective/preventive action (CAPA) process.
July 2006
To July 2006
Trainee Engineer
at INDUSTRIAL ENGINEERING & TRADING (PVT) LTD
Location :
Pakistan - Lahore
Trainee Engineer for Fabrication and Erection of equipment's for the process industries.
Share on Facebook
Share on Twitter
Share Via Email