محمد جاويد, Maintenance Manager

محمد جاويد

Maintenance Manager

Golden Line Factory

البلد
المملكة العربية السعودية - جدة
التعليم
بكالوريوس, Electronics Engineering
الخبرات
10 years, 10 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :10 years, 10 أشهر

Maintenance Manager في Golden Line Factory
  • المملكة العربية السعودية - جدة
  • أشغل هذه الوظيفة منذ مارس 2022

Developed and implemented an effective preventive maintenance program for electronic equipment, resulting in a 20% reduction in unplanned downtime.
Oversaw a team of technicians and engineers, providing guidance and support in troubleshooting and repairing complex electronic systems. - Prepared and managed the maintenance budget, optimizing resource allocation and reducing operational costs.
Implemented continuous improvement initiatives, resulting in improved equipment reliability and increased operational efficiency.
Conducted regular safety audits and ensured compliance with safety regulations and company policies.
Manage the documents using EPMS and Microsoft Ticketing system for employees performance, preventive, corrective and purchase of spare parts.

Electronics Engineer في Golden Line Factory
  • المملكة العربية السعودية - جدة
  • سبتمبر 2019 إلى مارس 2022

Conducted troubleshooting, diagnosis, and repair of electronic systems, including circuit boards, power supplies, and control panels.
Assisted in the development and implementation of preventive maintenance procedures to minimize equipment failures.
Collaborated with cross-functional teams to identify and resolve technical issues, ensuring minimal impact on production schedules.
Maintained accurate documentation of maintenance activities, including work orders, equipment history, and inventory management.

Maintenance Engineer في Ehtesham Packages
  • باكستان - كراتشي
  • أغسطس 2015 إلى سبتمبر 2019

1. Equipment maintenance: Responsible for the overall maintenance and repair of the printing and packaging equipment. This includes troubleshooting and resolving mechanical, electrical, and other technical issues to ensure smooth operations.

2. Preventive maintenance: Develop and implement preventive maintenance plans to minimize breakdowns and maximize equipment uptime. This involves conducting regular inspections, lubrication, and replacement of worn-out parts to avoid unexpected failures.

3. Spare parts management: To maintain an inventory of essential spare parts to facilitate quick repairs and minimize downtime. They should coordinate with suppliers, order the required parts, and ensure their availability when needed.

4. Documentation and reporting :To maintain accurate documentation of maintenance schedules, repairs, and replacements. They should also prepare reports on equipment performance, maintenance costs, and downtime for management review.

5. Training and support: Responsible for providing training and technical support to operators and other employees.

6. Continuous improvement: To evaluate the performance of the printing and packaging equipment and identify opportunities for improvement.

7. Cost control: To identify cost-saving opportunities, conduct regular cost analyses, and suggest measures to optimize maintenance activities without compromising equipment performance or quality standards.

Site Engineer في Albario Engineering Pvt Ltd.
  • باكستان
  • نوفمبر 2012 إلى مايو 2014

747 MW Combined Cycle
Power Plant Frame 9FA of GE USA erection at WAPDA Thermal Power Station Guddu Kashmore
Working Areas: Mark vi e, PEECC, Gas Turbine, Steam Turbine, GT ST Auxiliaries, HRSG, Generator, Power Transformer, 500 KV Switch yard, Cooling Tower, Cw pipeline.DCS.
Generation, Erection, Transmission, Project Development.

Trainee Engineer in My Son (Mobilink) في MySon
  • باكستان
  • سبتمبر 2012 إلى نوفمبر 2012

Field work at sites to update the sites.

Internee في Pakista Steel Mills Bin Qasim Karachi
  • باكستان - كراتشي
  • ديسمبر 2010 إلى يناير 2011

Working Areas: Engineering Laboratories, Electronics development cell, Iron making Deptt. Steel making Deptt. Sintering Plant.

Internee في PTCL
  • باكستان - كراتشي
  • يونيو 2010 إلى يوليو 2010

Field work and management with Churn Manager.

الخلفية التعليمية

بكالوريوس, Electronics Engineering
  • في Sir Syed University of Engineering & Technology
  • مارس 2012

Final Year project: web Server based on Ethernet Controller.Remotely placed or installed equipments can be controlled and monitor by this web serwer.

الثانوية العامة أو ما يعادلها, Engineering
  • في Pakistan Steel Cadet College Karachi
  • يناير 2006

➢ HSSC (Pre-Engineering) A Grade 2006. Pakistan Steel Cadet College Karachi

الثانوية العامة أو ما يعادلها, Computer Science
  • في Pakistan Steel Cadet College Karachi
  • يناير 2004

SSC (Science) A Grade 2004.

Specialties & Skills

Electronics Engineering
Procurement
Maintenance manager
PLC Programming
Fault Analysis
AUTOCAD
PLC PROGRAMMING
operation
Troubleshooting and fault analysis
maintenance planning
production management
Automation
Telecommunications
Engineering
Electrical/Electronics drawings reading
supply chain management and procurement
Maintenance manager
Electronics board repairing
Commissioning and instrumentation
Electronics Engineer
Good communication skills
Hardware
Programming
Troubleshooting
Supervising
Management
Installation

اللغات

الأوردو
متمرّس
الانجليزية
متمرّس
العربية
متوسط