MEP Manager
Best Construction Engg & Services
Total years of experience :32 years, 3 Months
Supervision of MEP works including Electrical, Fire Fighting, Drainage, Sewerage etc. of 12 x High rise residential Towers.
Fire Fighting Design Engineer for Islamabad IT park Project Islamabad Designed by SUNJIN Korean Consultants under Ministry Of IT and main Contractor NEC. Conducted Design Reviews of Fire Fighting 2+10 stories IT Building.
MEP Construction & Commissioning activities supervised as Construction Manager in REDCO Intl., with the contractors PSH (PORR, SBG & HAMAD) & Project Client QATAR Rail.
•Planning and scheduling before execution of site work.
•Lead the team to manage day to day construction activities.
•Ensure the work is according to approved method of statement.
•Control of work quality, safety standards, and construction methods.
•Close coordination with design team to resolve technical problems related to electrical and mech.
•Energy rooms (SPS, UPS Batteries, TPS), Tel/IT rooms, TVS rooms, Station front of house, Station back of house, underpass entrances, Cross over, street levels.
•Supervision of MSI containment and coordination with design team to resolve technical problems.
• Supervision of Installation of MEP works of Cable Trays/Trunks, FF, CDP & Chilled water Pipe Installation Under Ground Rail Tunnels having different Tunnel Track length of Total 34 KM.
•Supervision of Installation of MEP works of Cable Trays, FF, CDP & Chilled water Pipe Installation, AHU, FCU’s, CRAC Units, etc. at Rail Stations.
•Supervision of laying / pulling of MV/LV cables & Termination from MDB to MCC & SMDB.
•Supervision of pulling &Termination of LV Cables/Wires to DB for lighting & Controls etc.
•Supervision of Installation of Fire Alarm system like FM200, Sprinklers, Aspiration system.
•Supervision of Test Run & Commissioning of AHU, FCU, Fire Pumps, Submersible pumps, CRAC Units etc.
•Design reviews MEP Drawings of Qatar Rail Project.
•Preparation of Method of Statement of MEP Works.
•Close Coordination with Quality Department for initiation of IR for the inspection of Completed MEP Jobs.
•To avoid & ensure that no NCR will be issued for MEP Jobs.
•Handled the 800 Nos. Team of Manpower of Engineers, Supervisors, Foreman & Technicians for the execution of 34 KM Longest under Ground Train Tunnels & Rail Stations.
HVAC Cx Engineer (Detail mentioned in attached CV)
Detail Mentioned in attached CV
Electrical Complex Pak.
Installation, Commissioning, Operation and Maintenance work of Mechanical Machines includes
• Lathes & Milling Machines of Different Capacities.
•Air Compressors
•Autoclaves for Transformer Drying.
• Hydraulic Presses up to 2000 Tons Capacity.
•Vapor Phase Drying Plant (VPD) Make Switzerland for Transformer Drying & Cleaning.
•Core Cut to length Machine Make Germany for Transformer Core Cutting.
•Piping Network of Steam/Condensate, Hot Water and Transformer Oil etc.
1991 to 1991Assistant Manager HUBCO Power Plant Karachi
•Supervised the Installation of 1200MW (4x 323MW) Oil Fired Steam Boilers from