Lead PMC Engineer (Piping, Mechanical, Procurement & Construction)
PROEPCC
Total years of experience :18 years, 4 Months
Serve these clients CPECC, GPS, Oil-Serve, Drill Tech, Enter Engineering Uzbekistan, HOTECC Kuwait, AirLiquide, Oilserv, Sonangol, Berg Industries (ADNOC Qualified), Lead Pre - Qualification Engineer for Drydocks & ADNOC, etc.
Roles and Responsibility: Engineering, Procurement, Supply & Logistic, Supervision & Surveying, 2d & 3d Drafting, As-built, Bidding & Proposal, Cost Estimation, RFQ/MPR Preparation, Construction Monitoring, etc
• Review of Navisworks 3D-Model, Plot plan, Layout and Isometric, As Built For FPSO.
• Review of Piping Design Basis.
• Review of Work Pack, Test Pack, Revision review for Critical & Non-Critical Physical Modification with (CS).
• Review of P&ID, PFD For different module of FPSO such as Export gas compression, Oil Separation & Stabilization, well steam processing, Turret & mooring, Flare Stack Module.
• Review of 3D - model against P&ID, PMS & Isometric.
• Co-ordinate with Interdisciplinary Department (DCC, Planning, Manufacturing Shop, On Board Team).
Client Exxon Mobil West Qurna I Project Major Tie-ins DS8 Facilities Basra Iraq.
Engineering Consultant: KENTZ Engineers & Constructions - Member of the SNC-Lavalin Group (PMC Agreement)
Roles and Responsibility: SOW Review, Tie-ins, Line List, Pipe Routing Review, plot plans, piping layouts, MTO for (Mech, Piping, Steel Structure), Isometrics, MR/MPR, Scope Comparison, TBE with Complete Vendor Evaluation, Aconex, etc.
Serve these clients Polish Oil & Gas, MOL, CPECC-UAE, BP-Australia, PARCO, OGDCL, Petronas-IRAQ, WOOD-UAE, SNC-Lavalin-UAE, Sonangol-UAE, etc.
Roles and Responsibilities: Engineering, Trading, Supply & Logistics, Expediting, Supervision & Surveying, 2d & 3d Drafting, Bidding & Proposal, Cost Estimation, RFQ/MPR Preparation.
Work on these projects DA Plant 84 KTPA, RSB Plant 14 KTPA, 3, 15, 18 Mw (CFB) Coal Fire Boiler Power Plant Project, Ro-System Modification/Up-Gradation & Integration With CFB, HTM Heaters and Coal Fired Boiler Project for ICI Polyester Business, Polymer Filters for ICI Polyester Business.
Roles and Responsibility: FEED, SOW, Basic Design, Liaison with (national & international vendors), Project Planning, Estimation / QS (Piping & Steel Structure), 2D - 3D Detail & Design Engineering Review (P&Ds, E&I, GAs, Equipment & Piping Layout Plans, Fabrication Drawings, Isometric drawings, Specifications and BOQ/MTO etc.), 30%, 60%, 90%, etc.
Work For these Clients / Projects PPL Adhi EPF Oil & Gas Field, Mol Oil & Gas CO. B.V. (MOL) Makori field development surface facilities, OGDCL, UCH Power generation, etc.
Roles and Responsibility: Project Site Visit, SOW/Battery Limit Review, Tie-ins, Pipe Routing Review, plot plans, equipment layouts and piping layouts, material take-offs for (Mech, Piping, Steel Structure), Isometrics, Material Requisition, etc.
As an Asst. Piping & Mechanical Engineer My duties were involving complete Engineering, Procurement, Construction, and Commissioning activities, till the Final handover of the Plant and Final As-Built Documents.
Roles and Responsibility: Engineering, Fabrication Works, Workshop Management, Plate Development Works, Site Visit & Scope Assessment.