ICT & ELV & DATA CENTER:
Implemented projects with wide ranging of ICT & Telecom Systems
•Core and distribution Networking
•IP Telephony and PABX systems
•Structured Cabling Networks. Complex Multi-hierarchical Passive Networks. Up to 30, 000 Fiber Nodes 75, 000 copper nodes.
•FTTH for communities, buildings, commercial developments. Deployment of Etisalat, Du, & TAAWUN guidelines.
•Long Haul Fiber Optic networks. Oil pipelines, water pipelines, Railway networks, Airports, Perimeter security fencing fiber, City and homeland security surveillance network Fiber systems.
•Oil & Water Pipeline Monitoring systems
•Closed Circuit Tele Vision system ( CCTV)
•Analog Cameras
•IP Cameras
•Number Plate recognition
•Compliance with SIRA, MCC
•Access Control System
•Fail safe and Fail secure system designs
•Gate Barrier System
•Secure Gate barrier systems using Bollards
•Access cards based Gate barrier system
•Integration with CCTV and VMS
•People Counting system.
•GRMS systems
ITS Systems:
Implemented system specification and design of ATMS / ITS solution based on following.
•Information collection system using RVDs, BT, CCTV, ESS ( Environmental Monitoring System)
•Road user Information delivery system using DMS ( Dynamic Messaging Screens System).
•Field Communication Network using highly dense and intricate network of field Switches ( layer 2 & layer 3) interconnected by Ultra low Loss Fiber optic network.
•Layer 2 and layer 3 switching network
•Layer 2 resiliency, convergence.
•Layer 3 routing and convergence
•Multicast & Vdcs implementation at the Core switch.
•ATMS integrating VMS, CCTV, DVMS, Dynamic Messaging Signs, Barriers, RVD, BT, Field ICT Network, Developed ITMS strategy for incident management & TMC control operation.
•Video Wall system with total collaborative environment. Used cases for TMC operations in normal, emergency and shut down situations.
•Preparation of system design document as built.
•Compliance to NTCIP protocols for ESS, DMS, CCTV, TSS.
•Tier- III Data center design and implementation, hardware, power, vesda, cooling, cabling, cold aisle containment systems.
•Firewalls, DMZs, Server infrastructures, SAN Storage.
•Control Room design, ergonomics and usability.
•FAT Testing for the system, Test used cases.
Data Center:
•Data Center implementation and supervision following BICSI & TIA-942B Standards.
•Implementation of Tier-III architecture for Power, Cooling and System components.
•Provision of power using over-head system deploying bus-bars and tap-off boxes.
•Redundancy implementation by deploying UPS, Generator and Utility power management.
•Grounding and Bonding of the Data Center including Raised Floors, Power infrastructure, Racks and devices.
•End of Row, Middle of Row implementation for Inter-Rack cabling.
•Cooling system implementation, CFD analysis, CRACK Units placement, Cold & Hot Aisle Containment.
•Raised Floor design and implementation.
•Containment for Fiber & Copper cables, Under the raised floor and over-head. Use of Cable basket, fiber runners, runway & ladder systems.
•Design review of System Architecture: TOR Switches, Blade Servers, SAN Storage, Rack Servers, DCIM, Establishment of separate Racks for Production and Computation requirements.
- Company industry:
- Metro & Rail Passenger Transport
- Job role:
-
Information Technology