Client : Royal Commission Jubail saudi arabia
Study Telecom duct bank drawings find conflicts.
Prepare Telecom shop drawings, Submit Technical Queries & Field Change Drawings for telecom duct bank & manholes.
Material & Quantity take - off as per IFC drawings.
Construction and execution of equipment for excavation and backfilling.
Generally responsible for prepare shop drawings, Quantity & implementation of all Civil Work such as (Steel, Concrete pouring, Form-works for duct bank & Back-filling of sub base and base course for Road).
Prepare daily report to measure project performance.
Organize the workers and ensure that they are performing as required.
Implement SAFETY, QUALITY RULES & REGULATION of the Project.
Client : SATORP (Saudi Aramco Total Refinery petrochemical Jubail Saudi arabia)
Material & Quantity take - off as per IFC drawings.
Construction and execution of Pipe supports, Footings and Water Pipe erection.
Preparation of fabrication drawings and its shop drawings for platform to access the valve.
Generally responsible for implementation of all Civil Work such as (Steel structure I & H Beams, Concrete pouring & Form works for Footing) & Shop drawings.
Maintain a record of planned and actual work accomplished to measure project performance.
Organize the workers and ensure that they are performing as required.
Implement SAFETY, QUALITY RULES & REGULATION of the Project.
Client : Petro Rabigh
Detail study of drawings, standards, specifications of client.
Preparation of shop drawings& As-build drawings.
Material & Quantity take - off as per IFC drawings.
Construction and execution of Dike wall, channels & Floor works.
Generally responsible for implementation of all Civil Work such as (Steel, Concrete pouring & Form works) .
Maintain a record of planned and actual work accomplished to measure project performance.
Organize the workers and ensure that they are performing as required.
Implement SAFETY, QUALITY RULES & REGULATION of the Project.
Client : Royal Commission Jubail Saudi arabia.
Construction and execution of Lavatory, Boundary walls, Running tracks & Roads.
Preparation of shop drawings (Civil, Electrical, Mechanical)
Material & Quantity take - off as per IFC drawings.
Maintain a record of planned and actual work accomplished to measure project performance.
Supervise and implement construction project based schematic drawing and specifications.
Implement SAFETY, QUALITY RULES & REGULATION of the Project.
Working & Help to make design for Architectural students
Handel plotter printing machine
Assist Architects in Architectural Design
Assistant Architec
Submission drawing of Residential
& Commercial buildings
Revised drawing of above
Completion drawing of above
3d View with Rendering of above
2d plans & working drawing’s etc
AutoCad Engineer & Site Engineer
Site supervision
3d View with Rendering.
2d plans & working drawing’s etc.
Assisting in Architectural design
Prepare 2d plans, shop drawings &layout Drawings.
Site Supervision
Calculate Quantities as per approved drawings.
Prepare As built drawing’s after completion of site works