Implementation Engineer
LCC Pakistan Pvt Limited
Total years of experience :4 years, 5 Months
Installation, Commissioning and Troubleshooting of ZTE’s BTS, Radio Remote Unit, fibber, Power Cables.
Ensure the Quality of work done as per WARID’s Pakistan Network.
Ensure that all approved and inspected material are used.
Coordination with teams to implement the Project to achieve the target within time line.
To check and ensure that the work done is as per Etisalat UAE Network Modernization Phase-2 Project Specification, Method Statement and as per approved site drawings.
Ensure that all approved and inspected materials are used.
Develop and determine all tests on all procedures and oversee all testing methods on 2G, 3G, 4G and maintain high standards of quality for all processes.
Organize, implement, conduct and manage the QA/QC Programs as per the Etisalat and Ericsson Quality Policy.
Test all External Alarms of RBS 6102, 6301, 6201, 6601 and internal Alarms i.e. VSWR, E1, imbalance path, regarding external nodes on 2G, 3G & 4G.
Alarms testing on OMT for 2G, Moshell for 3G & 4G.
Integration of 2G/DUG, 3G/DUW, 4G/DUS, TCU by using Moshell, Putty, Hyper Terminal, File Zila, Element Manager.
1) Installations, Commissioning and Trouble Shooting of Ericson P2, P6, P20 and C-Nod MW Links including 1+0, 1+1 HSB, SD.
2) Configuration of MW links at Mini-Link Software.
3) Software up and down-gradation, DCN Creation.
4) Installations, Commissioning and Trouble Shooting of Ericson RRU (B3, B8), RUS (B3, B8), Rectifier, RBS (6101, 6201, 6301and 6102), Complete SDR Set up of site.
5) Alarms Patching, Define and Commissioning at OMT.
6) IDB creation at OMT.
7) Installation, commissioning and Trouble Shooting of Single and Double Band Antenna’s.
8) Worked at cutoff (hard and cold swap) Activity.
1) Installations, Commissioning and Trouble Shooting of Ericson P2, P6, P20 and C-Nod MW Links including 1+0, 1+1 HSB, SD.
2) Configuration of MW links at Mini-Link Software.
3) Installations, Commissioning and Trouble Shooting of Ericson RRU (B3, B8), RUS (B3, B8), Rectifier, RBS (6101, 6201, 6301and 6102), Complete SDR Set up of site.
4) Alarms Patching, Define and Commissioning at OMT.
5) Installation, commissioning and Trouble Shooting of Single and Double Band Antenna’s.
6) Worked at cutoff (hard and cold swap) Activity.
Supervision with teams.
*Supervising Installations, commissioning and Trouble Shooting of NEC iPasolink 200, iPasolink400 and iPasolink1000 MW Links including 1+0, 1+1 HSB, SD.
Completing all documentation including, weekly reports, Track Sheet, BOQ updates etc.
IP setting on Ipaso link.
To understand the complete Design of Plant with respect to Power generation, distribution and deal with Faults which are occure at plant.