Electrical Engineer at MEGA E&M Trading and Contracting LLC
  • Qatar - Doha
  • May 2014 to May 2017

•Review the project documents and drawings and assist the team for correct execution of the works
220/132/22kV GIS substation construction
High mast lighting, Indoor and outdoor lighting installation
• MV/HV/LV cable lying and termination for GIS switch gears
• Installation of indoor and outdoor earth system
• Cable tray installation
• Lighting installation (emergency, normal, DC light and exit light)
• Small power installation
• DB installation both lighting and small power
• Cable trunking system installation
• Lightning protection
• Transformer installation including 315 mva, 60 mva, 250 kva.
• Panel installation
• High mast pole design, installation, Commissioning
• KHARAMA shut down works for OHL
• MV/LV cable protection
• MV/LV cable lying and termination
• Testing And Commissioning
Planning and execution of works
• Planning and coordinating material required the site
• Arranging field inspection and coordinating with consultant
• Attending weakly meeting, project report submission
• Lighting installation including Normal fluorescent , High bay light, Flood Light, Exit light and Emergency light with photo sensor
• HV/LV cable lying and termination
• Street light installation with high mast
• Small power installation including industrial socket and normal sockets
• Installation and complete wiring of SMDB, BSDB, LCB, VFDB, 110 & 24V DB and 110V dc DB

• Installation and complete wiring of feeder panels in substation and motor control room feeding for various pumps and sections
• Cable lying, Glanding and termination of 1CX600 SQ MM, 4CX400 SQ MM, 4CX240 SQ MM, 4CX70 SQ MM, 4CX95 SQMM, 4CX16 SQ MM, 4CX4 SQMM etc.
• Cable Tray installation for power cables and control cables, including perforated and ladder (GI and GRP) cable tray
• Installation, wiring and termination of isolators (4 pole, 3 pole, 2 pole)and push button for light, pumps (suction, discharge, sulphuric acid, sodium hydroxide, etc) and valves (actuator valve, NRV ), AC unit
• Lying, Glanding and termination of MICC cable for lighting and small power
• Lighting pole installation for yard light with flood light
• Coordination and planning of material requirement at site in advance to ensure proper execution as per site execution plan
• Project planning, supervising and inspection
• Attending weakly meetings and arranging man power to attain the goal.
• Preparation of as built red mark drawing and obtaining approval from consultant .
Evaluates electrical systems, products, components, and applications by designing and conducting research programs; applying knowledge of electricity and materials.
Confirms system's and components' capabilities by designing testing methods; testing properties.
Develops electrical products by studying customer requirements; researching and testing manufacturing and assembly methods and materials.
Develops manufacturing processes by designing and modifying equipment for building and assembling electrical components; soliciting observations from operators.
Assures product quality by designing electrical testing methods; testing finished products and system capabilities.
Prepares product reports by collecting, analyzing, and summarizing information and trends.
Provides engineering information by answering questions and requests.
Maintains product and company reputation by complying with federal and state regulations.
Keeps equipment operational by following manufacturer's instructions and established procedures; requesting repair service.

Completes projects by training and guiding technicians.
Maintains professional and technical knowledge by attending educational workshops; reviewing professional publications; establishing personal networks; participating in professional societies.


Electronic Systems, Electronics Troubleshooting, Electronic Testing Design, Project Management, .

Electrical Engineer at Trey Trading and Contracting LLC
  • Qatar - Doha
  • July 2013 to April 2014

• Responsible for check out pre functional and functional testing of various electrical systems.
• Coordinating a team (20-30 people) for:
• Electrical system installation (lighting and power) for New Doha International airport (Gold launch and silver launch)
Insulation resistance test of cables up to 11 kv, continuity, loop test of circuits, loop impedance , contact resistance test, temperature testing of electrical contacts .
• Pre functional and functional testing of power socket, disconnect switches, panels, circuit breakers, bus bar, various light fittings and power, torque of electrical connections.
• Testing of proper voltage ratio disconnect switches, checking and inspection of LV breakers, panels, disconnect switches.
• Checking of general condition, grounding
• All tests have been done according to Company Drawings and Technical Requirements
Data sheets have been recorded and submitted to superiors and Client
stallation Of Cu Bus Bar trunking in 7 floor building Including Four Substations,
• Preparation of measurement sheet for billing
• Checking Alignment And Tightness Of Connections, Measurement Of Hold Elements
• Conduct Pre Functional Testing Insulation Resistance And Continuity Of Installed Bus Bar
• Installation Of Riser, Termination To Switch gear And Substations
• Test Sheet Have Been Recorded And Submitted To Superior And Client
Manage Electrical configuration in zone controlled by temporary operation organization,
- Elaborate of the electrical isolation (LOTO procedure) planning following Work Permit authorized
- Implement rules to ensure a good control of site,
- Ensure safe activities as per the Work Permit process and electrical isolation certificate (33 kV, 750 Vdc, 415/240 Vdc)
- Handle any Incident, Accident and Recovery measures on zone controlled by Temporary Operation Organization,
- Take Charge of overall Radio Communications and OCC Traffic Controller Records/Reports and Memos
- Perform any other duties assigned by the Manager of Temporary Operation- Maintain and develop his own level of expertise
In-charge for overseeing all MEP QA/QC work
- Ensure the electrical/mechanical work carried out is as per approved shop drawing and within the time frame and progress of
the approved construction program.
- Ensure that the installation, inspection and testing of all the electrical/mechanical equipment, fittings and work implemented
meets the specification and the consultant requirements
- Verify the accuracy of shop drawings and their compliance to the specification, consultant’s design and existing local authority
standard.- Coordinate with other project personnel to ensure that deadlines, procedures, and other project requirements are met
• Implements and maintains the Planning/Scheduling & cost control on the project.
Develops and maintains the cost controls system and provides the necessary tools for cost cost control to the Project manager and the PMO.
Understands and applies engineering, procurement, and construction terminology, concepts, and
relationships. Develops and maintains critical path logic networks and bar charts utilizing this information.

Assistant Engineer-Electrical at KSEB-Kerala State Electricity Board
  • India - Delhi
  • July 2012 to June 2013

• Load Monitoring, Load Calculation Of Different Feeders, Monitoring Of Transformers And Breakers Up To 40 KVA
• Operation And Maintenance Of Transformers, Breakers Including Sf6, Vacume (VCB), Air Blast (ABCB) Circuit Breakers .
• Arrange Load Shedding Of Various Feeders In Peak Time And Power Shortage Conditions
• Responsible For Shutdown Works and Give Permit To Wok In Various Feeders And Substations.
• Updating the log book hourly basis and calculating the electrical parameters
• Operation and maintenance of DC system and Relay,
• All activities done as per the instruction from superiors
• MRO ( maintenance, repair and overhaul for power generation units built in by
different OEM)
R&M (renovation and Modernization of power generation units built in by different
OEM)
O&M ( operation and Maintenance of power generation units built in by different OEM)
• Perform engineering supervision and tasks as directed by the OMT/ site manager/
senior engineers.
Supervise and perform repair activities according to solid engineering principles
while following precise written instructions
Maintain project and task files and reports.
Schedule and coordinate inspection, repair, and maintenance schedule.
Coordinate activities when manager is out of the office.
Maintain and organize equipment inspection and repair files.
Coordinate with the OMT engineer’s network regarding repair procedure and
problem solving.
• On occasions be deputed to project sites and serve as a project or site manager.

Education

Bachelor's degree, Electrical & Electronic Engineering
  • at Cochin University of Science and Technology
  • July 2012
High school or equivalent, plus two science
  • at Kerala State Board
  • January 2007
High school or equivalent, matriculation
  • at Kerala State Board
  • January 2005

Specialties & Skills

Utility Computing
Power Transmission
Power Distribution
Light Commercial
CIRCUITS
DOCUMENTATION
DRAWING
HIGH VOLTAGE
LIGHTING
MAINTENANCE
POWER SYSTEM
TESTING
street light
Primavera P6
Revit MEP
Electrical Design

Languages

Hindi
Intermediate
Malayalam
Native Speaker
Urdu
Intermediate
Arabic
Beginner
English
Expert
Tamil
Beginner

Training and Certifications

Revit MEP (Training)
Training Institute:
INTACT MEP ACADEMY
Date Attended:
May 2017
Duration:
240 hours
Diploma In Electrical System Design (Training)
Training Institute:
INTACT MEP ACADEMY
Date Attended:
May 2017
Duration:
240 hours
AutoCAD 2016 (Certificate)
Date Attended:
May 2017
Primavera P6 (Certificate)
Date Attended:
April 2017
Industrial Training For Power transformers (Training)
Training Institute:
Transformers and Electricals Kerala LTD
Date Attended:
July 2010
Duration:
24 hours

Hobbies