Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Muhammed Shafi Parammal Chappayil, Process Engineer

Muhammed Shafi Parammal Chappayil

Process Engineer·abc55

India

High school or equivalent, Oil And Gas

Work experience

Total years of experience: 20 years, 8 months

Process Engineer

May 2025 - Present

abc55

Talipparamba, India

May 2025 - Present

Company industry:
Oil & Gas

Senior Process Engineer

January 2025 - Present

freelancer

Kerala, India

January 2025 - Present

• 1. Review of scope of work
• 2 .Review of vendor datasheet
• 5. Aspen Hysys

Company industry:
Oil & Gas

Process Engineer (Design)

March 2011 - Present

Indus Integrated Solutions, A wing of Indus-USA Inc.

Bengaluru, India

March 2011 - Present

IITS offers wide range of Design, Engineering & Consulting solutions to industries like Oil & Gas, Sugar, Food and other Chemical Industries.

Currently working on FEED (front end engineering design) for Gas Facility being developed in Rajasthan field for Cairn India Pvt. Ltd. This facility includes production of gas from gas wells, gas-condensate separation, dew point depression, condensate stabilization, gas and condensate transfer etc. Involved in
 Preparation of Heat and Mass Balance
 Preparation of Design Basis
 Steady state process simulation and optimization in HYSYS.
 Preparation of PFD, UFD and P&I diagram.
 Equipment sizing - Tanks, Phase separators
 Pump and Control Valve Sizing.
 Line sizing and Hydraulics Calculations.
 Preparation of Process Datasheet, Process Instrument Datasheet
 Preparation of Line list, Equipment List
 PSV Sizing.
 HAZOP participation
 Exposure to International standards and codes- API RP14E, API 12J, API RP14C, API RP520, API RP521, API 526, API 12GDU

Company industry:
General Engineering Consultancy
Job role:
Engineering

Process Engineer

February 2025 - April 2025

Sami Nutraceuticals Private Limited,

Talipparamba, India

February 2025 - April 2025

basic engineering, detailed engineering, construction
both complexes within a 36-month period.
Client: Hindustan Urvarak and Rasayan Ltd (HURL), Sindri, Jharkhand Softwares used: AutodeskNavisworks Freedom 2019, Microsoft Excel®) 15.2 Acre project - A The first phase of the plant square metres world
class Active Ingredients (ANI) manufacturing an annual capacity of
300 tons and was functioned by 2021. The new facility a planned investment of Rs. 200
crore is part of the Sami- Sabinsa Groups growth strategy.(Client: In-house project)

Company industry:
Oil & Gas

(Process Engineer

February 2025 - March 2025

abc5

Talipparamba, India

February 2025 - March 2025

Company industry:
Oil & Gas

(Senior Process Engineer

January 2025 - February 2025

abc

Kannur, India

January 2025 - February 2025

Company industry:
Oil & Gas

Engineer

January 2025 - February 2025

abc

Kannur, India

January 2025 - February 2025

1. Process Engineering design criteria related to Equipment sizing, Control valve sizing,
Preparation of Design Basis.
2. Hydraulic calculations, such as Pipe hydraulics and Pump hydraulics
3. Preparing technical documents such as Process data sheets. Process design philosophies.
4. Preparation of PFDs and P&IDs
5. Pipeline simulators such as Pipenet, Aspen Hysys, KYPipe (Pipe2024) for performing
steady state analysis.
6. Handled software such Autodesk Navisworks Freedom 2019, Smart Plant Intools, AutoCAD Piping
&Instrumentation Diagram (AutoCAD P&ID 2017)
7. Participated in Hazard Operability Studies (HAZOP)
8. API standards such as API 520, API 521, API 526, API 14E, API 12J, SAUDI ARAMCO
SAES-L-132, etc., Prepare line list. with experience in developing P&IDs, review of Process documents.
Preparing the Equipment and Instrument process data sheets..

Company industry:
Oil & Gas

(Sensor Process Engmeer

May 2024 - May 2024

Reva Process Technologies,

Pune, India

May 2024 - May 2024

• Removal of Hydrogen Sulfide (H2S) from sour Fuel gas. Sour fuel is washed with scrubbing
solution
(a mixture of 33% Sod. Carbonate, approximately 50% EDTA, 14% Ferric chlonde,
and rest Sod. Citrate and water) and then passed through water washing column. Purified ful
gas has ZERO perc. Sulphur where as scrubbing liquid(or chelated ferme chlonde solution)
goes through regeneration column, regeneration tank, cooling tower, cooling tower tank,
press filter. The filtrate recycled back to the scrubber). Operating conditions are 4barg and
450C
Pune, Maharashtra)
+ ZULF demolition and construction project It include incorporating comments on demolition
and construction P&IDs of the ZULF field of Saudi ARAMCO. It includes
well facilities of
the range 370-379, 480-489. 500, 570.620, Tie-1n platforms TP-07, TP-04, GOSP.it cludes to etc.,
Client

Company industry:
General Engineering Consultancy

Process Engineer

January 2024 - January 2024

Sagaciter, A unit of Technomek Process Systems FZE Kochi,

Kerala, India

January 2024 - January 2024

• 1.PFD
• 2 .P&ID
• 3 .Line Sizing
• 4 .Equipment
• 5. Aspen Hysys
• 6. Pipenet

Company industry:
Oil & Gas

Process Engineer

January 2024 - January 2024

Sagaciter, A unit of Technomek Process Systems FZE

Kerala, India

January 2024 - January 2024

Project : FACILITY 1 -
Chilling Unit.
MDEA Unit (Gas Sweetening).
TEG Unit (Gas Dehydration Unit).
Substation.
FACILITY 2 - Nitrogen Generation System, Hold-Up Compressors, Hold-Up Vessels, and associated
Tie-ins to existing network
Air Compressor.
Nitrogen Generation Package.
Nitrogen Holdup Compressor Package.
FACILITY 3 - Raw Gas Compression and Dehydration Facilities
Gas Compression (4 Stage) with Air Coolers.
Gas Dehydration.
Gas Metering.
Substation & SIH.
• 1.PFD
• 2 .P&ID
• 3 .Line Sizing
• 4 .Equipment
• 5. Aspen Hysys
• 6. Pipenet
• 7. Involved in client meetings (reference shall be provided on request)

Company industry:
Oil & Gas

(Process 'Engineer

January 2024 - January 2024

Sagaciter Process Technologies LLP,

Abu Dhabi, United Arab Emirates

January 2024 - January 2024

Company industry:
Oil & Gas

Process Engineer

November 2023 - January 2024

Saudi Consulting Services Co. (SAUDCONSULT)

Khobar, Saudi Arabia

November 2023 - January 2024

• 1.PFD
• 2 .P&ID
• 3 .Line Sizing
• 4 .Equipment
• 5. Aspen Hysys
• 6. Pipenet

Company industry:
Business Consultancy Services

Senior Process Engineer.

January 2022 - October 2023

L & T Hydrocarbon Engineering

Powai, India

January 2022 - October 2023

Projects :
Responsibilities
• 1.PFD
• 2 .P&ID
• 3 .Line Sizing
• 4 .Equipment
• 5. Aspen Hysys
• 6. Pipenet

Company industry:
Oil & Gas

Senior Process Engineer.

February 2023 - February 2023

L & T Hydrocarbon Engineering

Powai, India

February 2023 - February 2023

• 1.PFD
• 2 .P&ID
• 3 .Line Sizing
• 4 .Equipment
• 5. Aspen Hysys
• 6. Pipenet

Company industry:
Oil & Gas

Process Engineer

January 2023 - February 2023

Valdel Engineers & Constructors,

Bengaluru, India

January 2023 - February 2023

Aspen HYSYS
V12. 1
• Very Large Crude Carrier (VLCC) project-
& instrumentation diagram updating etc.,
Client: Adani, Port Liited, Mundra Gujarat Aspen HYSYS
V12.1 Microsoft Excel®)
• Numaligarh Refinery Limited (NRL) project- It involved brownfield expansion of the Indian
Oil Limited, Paradip, Odisha
Client: NRL, IOCL,
Used: Microsoft Excel®)

Company industry:
Oil & Gas

Senior Process Engineer.

January 2023 - January 2023

Reva Process Technologies

Pune, India

January 2023 - January 2023

• 1.PFD
• 2 .P&ID
• 3 .Line Sizing
• 4 .Equipment
• 5. Aspen Hysys
• 6. Pipenet

Company industry:
General Engineering Consultancy
Job role:
Engineering

Sr. Process Engineer

January 2023 - January 2023

Petrocon Engineers & Consultants

Hyderabad, India

January 2023 - January 2023

Client :
Project

Company industry:
Oil & Gas

Process Engineer

January 2023 - January 2023

Nissa Solutions Pvt Limited,

Bengaluru, India

January 2023 - January 2023

Numaligarh Refinery Limited (NRL) Excel)

Company industry:
Oil & Gas

Process Engineer.

February 2022 - March 2022

Technip Energies

Chennai, India

February 2022 - March 2022

• 1.PFD
• 2 .P&ID
• 3 .Line Sizing
• 4 .Equipment
• 5. Aspen Hysys
• 6. Pipenet
• 7. Ammonia Urea Plant

Company industry:
Oil & Gas
Job role:
Engineering

(Process Engineer

January 2022 - February 2022

freelancer

Kannur, India

January 2022 - February 2022

Company industry:
Oil & Gas

(Senior Process Engineer

January 2022 - January 2022

Petrocon Engineers & Consultants,

Hyderabad, India

January 2022 - January 2022

Installation of Sulfonation Purification Unit (OMPL Block-02 unit, aromatics components
are being extracted from Light reformate and A7 feed using Shell Sulfolane unit (SSU). In
this process sulfolane solvent is being used. Unit was commissioned in 2014. From 2015
onwards, it was observed that pH of sulfolane solvent was found to be gradually reducing
along with the increase of Chloride content. Potential of Upgradation of sulfolane is
ingress of oxygen in to system along with accumulation of chloride material under system
operating conditions. Hence it is decided to the solvent by using sulfolane cleaning
technology Sulfolane clean technology licensed by Limited. sulfolane purification technology

Company industry:
Oil & Gas

(Semior Process Engineer

January 2022 - January 2022

Petrocon Engineers & Consultants,

Hyderabad, India

January 2022 - January 2022

in to existing going to the Distillation Column
with limit conditions cmg and 112°C
Feed 15 then spent filter to remove
any solid. This filter to remove any solid. Ths filter
15 having one operating ~ one stand by configuration to ensure available of the all the time. Filtered
sulfolane then passed through control valve FV-136 to mamta 4000Kghr spent sulfolane (normal
flow rate) towards spent sulfolane. These treaters having two treaters configuration as mentioned in the
1° paragraph. Treaters help for removal of contaminates from spent sulfolane.
Treated sulfolane from this units tapped in to existing line going to the extractive distillation column
with battery
lumit condition 6 5Kg/cmg pressure and 112°C

Company industry:
Oil & Gas

(Process Engineer

January 2022 - January 2022

Aarvi Encon Pvt Limited, Technip Energies TEN

Chennai, India

January 2022 - January 2022

Company industry:
Oil & Gas

Process Engineer

November 2021 - January 2022

VALDEL ENGINEERS & CONSTRUCTORS

Bengaluru, India

November 2021 - January 2022

• 1.PFD
• 2 .P&ID
• 3 .Line Sizing
• 4 .Equipment
• 5. Aspen Hysys
• 6. Pipenet

Company industry:
Oil & Gas

Process Engineer.

December 2018 - January 2022

Sami Labs Limited, A member of Sami-Sabinsa Group

Bengaluru, India

December 2018 - January 2022

• 1.PFD
• 2 .P&ID
• 3 .Line Sizing
• 4 .Equipment
• 5. Aspen Hysys
• 6. Pipenet

Company industry:
Pharmaceutical Manufacturing

Process Engineer

January 2021 - January 2021

Sami Nuwacewticals Private Limited,

Bengaluru, India

January 2021 - January 2021

Company industry:
Pharmaceutical Manufacturing

Technical Professional-Process

June 2018 - September 2018

KBR Engineering& Construction Pvt Limited

Chennai, India

June 2018 - September 2018

• 1.PFD
• 2 .P&ID
• 3. Equipment datasheet
• 4. Instrument datasheet
• 5. Aspen Hysys
6. Smart Plant Intools

Company industry:
Oil & Gas

Process Engineer

January 2015 - January 2018

Meccicad Engineering Solutions Pvt Limited, KBR Engineering & Construction Pvt Ltd (KBR)

Chennai, India

January 2015 - January 2018

+ Dupont Tyvek® Line
• Expansion ~ It involved Front End Engineering Design of the uat of
High Density Poly Ethylene(HDPE), Tyvek® nonwoven material. $400 million 1s the total
cost of the project
Client: Luxemberg used: Poseidon Hydraulic circuit, Microsoft Excel 8)
+ Chlorine gas line sizing for TPL Cheanai- It involved in chlorine gas line sizing
Client: Chennai used:
+ Adsorption Tower Design intends to study the adsorption of water from Acetone-Water
mixture 2nd to find the amount of N2 required for regeneration of bed. For an accurate
estimation
of the heat and mass balance

Company industry:
Oil & Gas

Senior Process Engineer.

June 2017 - December 2017

Chemsys Process Engineering Pvt Limited

Chennai, India

June 2017 - December 2017

• 1.PFD
• 2 .P&ID
• 3 .Line Sizing
• 4 .Equipment
• 5. Aspen Hysys
• 6. Pipe net

Company industry:
Oil & Gas

Semior Process Engineer

January 2017 - December 2017

Chemsys Process Engineering Private Limited,

Bengaluru, India

January 2017 - December 2017

Company industry:
Oil & Gas

Senior Process Engineer.

April 2014 - October 2016

Sungov Engineering Pvt Limited

Chennai, India

April 2014 - October 2016

Responsibilities
Sizing of basket filters. types; conventional and multi layered elements
Sizing of the coalesce filter
Sizing of the cartridge filter
Sizing of automatic
back wash filter.
Sizing of restriction orifice.
Calculation of pressure drop mn strainers and filters
Preparation
of sizing dossier
Preparation
of pressure drop dossier.
Development
of sizing tools in MS Office.
Customer services (Redesign of three phase separator for NAPESCO, Chennai,
Filter Separator discussion with Saspem, Chennar)
+ Project the 10 its in to the
demand Borealis, Sweden
+

Company industry:
Oil & Gas

(Process Engineer

September 2012 - November 2013

abc1

Abu Dhabi, United Arab Emirates

September 2012 - November 2013

Company industry:
Oil & Gas

Process Engineer

January 2012 - November 2013

COWI

Doha, Qatar

January 2012 - November 2013

Company industry:
Oil & Gas

Process Engineer

March 2012 - April 2013

COWI A/S Branch office Qatar

Doha, Qatar

March 2012 - April 2013

• 1.PFD
• 2 .P&ID
• 3 .Line Sizing
• 4 .Equipment
• 5. Aspen Hysys
• 6. Pipenet

Company industry:
Oil & Gas

Process Design Engineer.

December 2009 - December 2011

Indus Integrated Technology Services Private Limited

Bengaluru, India

December 2009 - December 2011

Client : Bengaluru
Project :
Responsibilities
• 1.PFD
• 2 .P&ID
• 3 .Line Sizing
• 4 .Equipment
• 5. Aspen Hysys
• 6. Pipenet

Company industry:
Oil & Gas

Process Engineer

January 2011 - June 2011

Indus Integrated Technology Solutions,

Talipparamba, India

January 2011 - June 2011

• Crude Oil Stabilization Unit-It involved scheme development, finding number stages,
preparation of deliverables-PFD, P&ID, Process equipment datasheet, pump hydraulics, line
sizing, line list, equipment list etc.,
Client: In-house project

Company industry:
General Engineering Consultancy

Process Design Engmeer

January 2011 - January 2011

Indus Integrated Technology Solutions,

Bengaluru, India

January 2011 - January 2011

Abu Dhabi
+
mechanical completion, handing over and maintenance of the air compressor package
fire water system.
Client:
+ project-
Client:
+ Crude Unit-It involved scheme development, finding number stages,
preparation of deliverables-PFD, P&ID, Process equipment pump line
sizing, line list, equipment etc,
Client: In-house project

Company industry:
General Engineering Consultancy

Role: Process consultant

March 2008 - January 2009

Accenture Services Pvt Ltd

Bengaluru, India

March 2008 - January 2009

Accenture plc (NYSE: ACN) is a global management consulting, technology services and outsourcing company headquartered in Dublin, Republic of Ireland. It is the largest consulting firm in the world and is a Fortune Global 500 company.
Project: Chemical & Natural Resources -High Performance Process Excellence.
 Responsible for development of process improvement solutions in the form of Process Flows, Key Performance Indicators, Integration Maps, Operating Architecture and Application Architecture.
 Perform analysis on end-to-end value chain processes and identify scope of improvement.
 Develop knowledge assets to drive sales opportunities at multiple current/potential clients.
 Identify gaps in the client’s existing capabilities and opportunities for process harmonization and improvements through capability assessment model or diagnostics framework.
 Designing and implementation of ARIS business process management tool.

Company industry:
Business Consultancy Services
Job role:
Engineering

Engineer

January 2008 - January 2009

Indus Integrated Technology Services Private Limited

Bengaluru, India

January 2008 - January 2009

• 1.PFD
• 2 .P&ID
• 3 .Line Sizing
• 4 .Equipment
• 5. Aspen Hysys
• 6. Pipenet
• 7. etc.,
• Site engineering coordination and residue engineering.
• Leading the project execution team to implement E&I activities as per project specifications and
Operation requirements.
• Leading the loop-checking team and closing the punch list to complete all Pre-comm activities.
• Supporting plant start-up and performance checks with the operation team.

Company industry:
Oil & Gas

Engineer

January 2008 - January 2009

Accenture Services + Infosys BPO Limited

Bengaluru, India

January 2008 - January 2009

• Site engineering coordination and residue engineering.
• Leading the project execution team to implement E&I activities as per project specifications and
Operation requirements.
• Leading the loop-checking team and closing the punch list to complete all Pre-comm activities.
• Supporting plant start-up and performance checks with the operation team. محا
مد
شافي
پارممال
جپيال
up and performance checks with the operation team.

Company industry:
Oil & Gas

Production Engineer

January 2006 - January 2008

BOC India Limited,

Mumbai, India

January 2006 - January 2008

• 1. Production operations
• 2 .Preventive maintenance
• 3 .P&ID review
• 4 .Hydrogen plant etc.

Company industry:
Oil & Gas

Graduate Engineer Trainee

June 2005 - October 2007

BOC India Limited,A memer of The Linde Group

Kolkata, India

June 2005 - October 2007

na

Company industry:
Industrial Production
Job role:
Engineering

B Tech Trainee)(January/2004-June/2004

January 2004 - June 2004

Indian Institute of Petroleum,

Kannur, India

January 2004 - June 2004

compounds present in HDS
diesel was also

Company industry:
Accounting

B Tech Tramee

January 2004 - January 2004

Indian Institute of Petroleum.

Dehra Dun, India

January 2004 - January 2004

Company industry:
Scientific Research & Development

Education

Kellogg's Brown and Root (KBR) Engineering and Construction Private Limited

January 2018

January 2018

High school or equivalent, Oil And Gas

India

and Root (KBR) Engineering and Construction Private Limited

January 2018

January 2018

High school or equivalent, Safety

India

Indus Global Academy.

December 2010

December 2010

Bachelor's degree, Process Design Engineering

India

GPA (point): 5 out of 5

GPA (point): 5 out of 5

Indus Global Academy

January 2010

January 2010

Bachelor's degree, Process Design

India

Indus Global Academy

January 2010

January 2010

Bachelor's degree, Process

India

Accenture Services Private Limited

January 2008

January 2008

High school or equivalent, Art And Communication

India

IIT Bombay-Piping

May 2007

May 2007

High school or equivalent, piping engineering

India

Dr B R Ambedkar National Institute of Technology Jalandhar A premier institute at par with IIT in

May 2005

May 2005

Bachelor's degree, Chemical Engineering

India

National Institute of Technology (A Deemed University

May 2005

May 2005

Bachelor's degree, Chemical Engineering

India

National Institute of Technology (A Deemed University at Par with IITs in Indian Academic Scenario)

May 2005

May 2005

Bachelor's degree, Chemical Engineering

India

Dr B R Ambedkar National Institute of Technology Jalandhar Punjab

January 2005

January 2005

Bachelor's degree, Chemical Engineering

India

Dr B R Ambedkar National Institute of Technology Jalandhar Punjab

January 2005

January 2005

Bachelor's degree, Chemical Engineering

India

Syed Abdul Rahiman Bafaki Thangal

May 1998

May 1998

High school or equivalent, Biophysics And General Pathology

India

kerala board

January 1998

January 1998

High school or equivalent, general

India

Skills

oil gas
Expert
oil gas
Expert
Chemical Engineering
Expert
Chemical Engineering
Expert
Project Engineering
Expert
Project Engineering
Expert
Process Engineering
Expert
Process Engineering
Expert
Process Design Engineering
Expert
Process Design Engineering
Expert
SYNTHETIC POLYMERS
Intermediate
SYNTHETIC POLYMERS
Intermediate
PROCESS DESIGN
Intermediate
PROCESS DESIGN
Intermediate
NATURAL GAS
Intermediate
NATURAL GAS
Intermediate
COMPUTER HARDWARE
Intermediate
COMPUTER HARDWARE
Intermediate
ETHICAL STANDARDS AND CONDUCT
Intermediate
ETHICAL STANDARDS AND CONDUCT
Intermediate
pipenet
Intermediate
pipenet
Intermediate
MICROSOFT ACCESS
Intermediate
MICROSOFT ACCESS
Intermediate
MICROSOFT OFFICE
Intermediate
MICROSOFT OFFICE
Intermediate
MANUFACTURING PROCESSES
Intermediate
MANUFACTURING PROCESSES
Intermediate
HYDROCARBON
Intermediate
HYDROCARBON
Intermediate
ENDPOINT DETECTION AND RESPONSE
Intermediate
ENDPOINT DETECTION AND RESPONSE
Intermediate
ENGINEERING ANALYSIS
Intermediate
ENGINEERING ANALYSIS
Intermediate
oil gas
Expert
oil gas
Expert
Chemical Engineering
Expert
Chemical Engineering
Expert
Project Engineering
Expert
Project Engineering
Expert
Process Engineering
Expert
Process Engineering
Expert
Process Design Engineering
Expert
Process Design Engineering
Expert

Social profiles

Personal Website
Personal Website

URL removed due to policy violation. Please contact support for further information.

Training and Certifications

Certifications
Piping Engineering cell, Chemical Engineering department