Musharraf Irshad, Electrical Engineer

Musharraf Irshad

Electrical Engineer

Unimac

Location
Saudi Arabia - Jeddah - Mushrifah
Education
Bachelor's degree, Electrical Engineering
Experience
11 years, 3 Months

Share My Profile

Block User


Work Experience

Total years of experience :11 years, 3 Months

Electrical Engineer at Unimac
  • Saudi Arabia - Jeddah
  • My current job since November 2021

Planning and execution of all Electrical systems LV, LC and MV.
• Installation, termination, Testing, Commissioning and functional test of Track lights.
• Installation, termination, Testing, Commissioning and Functional test of ATS and MTS for PIT building, Team building, Premium Hospitality and Royal overlook.
• Continuity, Insulation resistance test and HI POT test of MV cables and preparing their reports.
• Earth resistance test of switch gear, all Transformers and RMUs and preparing their reports.
• Ensure the quality work and finish the work target on time.
• Prepare the work inspection report, material submittal and submitted to Saudi Motorsport Company for approval.
• During Event, arrangement of Generator power and Grid power stand by during the Race.
• Communicating with SMC Engr. during events to Control the Track lights.
• Installation and termination of Street lights in Service road and Royal road.
• Arrangements of Permanent power for Marshal Toilets in Marshal Area.
• Load calculation of Track lights and Buildings.
• Prepare the red line and as built and submit to Saudi motorsport company.

Electrical Engineer at Al Bawani Co. Ltd
  • Saudi Arabia - Riyadh
  • May 2016 to October 2021

Review of Design drawings developed by design consultants based on the scope of work, Review of Material submittals, Technical Queries, shop drawings.
• Site supervision during the installation of all electrical work. • Working on all systems of Low Voltage such as Lighting system, power system, mechanical power system, Lighting control system, Central Battery System and Cable Routing also DB, SMDB and MCC Panel installation and Termination.
• Working on all Low Current Systems such as Fire Alarm, Public Address, CCTV System, Access Control System, Voice & Data System and BMS system.
• White Rose Road Blocker System conducting, wiring and termination
• White Rose under Vehicle Surveillance System (UVSS) conducting, wiring and termination
• White Rose Motorized Gate Control System with Photocell installation and termination.
• Making plan for execution of work by coordination with Civil team and work accordingly.
• Cabling and installation of Fire alarm system, TV System, CCTV system, RTLS system, Access Control System, Nurse Call System, VAV System, BMS System, IPTV System, Lightning Protection System.
• Preparing Red line and as built of all low voltage systems.
• Commissioning and Functional Test of all Low Voltage systems, Medium voltage system and Low current Systems.
• Closing of Exception Item List.

• Prepare the Site Survey report for the remaining work and got approval from Consultant.
• Monitoring and updating of daily site activities and maintaining installation reports.
• Developing a management plan to execute the work in accordance with the strategic objective of the organization.
• Prepare the work inspection report and RFI.
• Prepare the Authority To Proceed (ATP) Certificate for Testing & Commissioning

Electrical Engineer at AL BAWANI CO LTD
  • Saudi Arabia - Jeddah
  • May 2016 to October 2021

Review of Design drawings developed by design consultants based on the scope of work, Review of Material submittals, Technical Queries, shop drawings.
• Site supervision during the installation of all electrical work. • Working on all systems of Low Voltage such as Lighting system, power system, mechanical power system, Lighting control system, Central Battery System and Cable Routing also DB, SMDB and MCC Panel installation and Termination.
• Working on all Low Current Systems such as Fire Alarm, Public Address, CCTV System, Access Control System, Voice & Data System and BMS system.
• White Rose Road Blocker System conducting, wiring and termination
• White Rose under Vehicle Surveillance System (UVSS) conducting, wiring and termination
• White Rose Motorized Gate Control System with Photocell installation and termination.
• Making plan for execution of work by coordination with Civil team and work accordingly.
• Cabling and installation of Fire alarm system, TV System, CCTV system, RTLS system, Access Control System, Nurse Call System, VAV System, BMS System, IPTV System, Lightning Protection System.
• Preparing Red line and as built of all low voltage systems.
• Commissioning and Functional Test of all Low Voltage systems, Medium voltage system and Low current Systems.
• Closing of Exception Item List.

• Prepare the Site Survey report for the remaining work and got approval from Consultant.
• Monitoring and updating of daily site activities and maintaining installation reports.
• Developing a management plan to execute the work in accordance with the strategic objective of the organization.
• Prepare the work inspection report and RFI.
• Prepare the Authority To Proceed (ATP) Certificate for Testing & Commissioning

Electrical Site Engineer at Atcon (pvt) Ltd
  • Pakistan - Lahore
  • July 2014 to April 2016

• Inspection of materials and finished Installation works, testing and commissioning works.
• Monitoring and updating of daily site activities and maintaining installation reports.
• Preparing closeout reports.
Project execution, engineering and management in high rise buildings for the following Projects.
(i) Teaching Hospital at University of Lahore.
(ii) Multan Airport Multan.
Basic electrical calculations like illumination level calculation, grounding calculation, transformer sizing calculation, cable sizing calculation also generate the basic engineering documents like data sheet, engineering calculations, SLD, cable schedule etc. under the guidance and supervision of senior or lead Engineer. Shop Drawing, As Built Drawing, Planning, Estimation, Costing & making Bill of Quantities of Overall Project. I have experience of Testing, Installing, commissioning of all electrical equipment used at the Site.

Electrical Site Engineer at The University of Lahore
  • Pakistan - Lahore
  • February 2013 to June 2014

• Monitoring and updating of daily site activities and maintaining installation reports.
• Preparing weekly closeout reports.
• Coordinating with the consultant and client for the works progress and acceptance.
Project execution, engineering and management in high rise buildings for the following Projects.

(i) Electrical Engineering Block University of Lahore.
(ii) Computer Science Block at University of Lahore.
• Coordinating with the consultant and client for the works progress and acceptance.
• Review the shop drawings and single line diagram and execution of work
• Making Bill of Quantity after two weeks for the above mentioned project

Education

Bachelor's degree, Electrical Engineering
  • at The University of Lahore
  • December 2013

Beacholar of Electrical Engineering in Specialization of Power.

Specialties & Skills

Public Address
Fire Alarm
Power Systems
Lighting
AUTOCAD
ENGINEERING
LIGHTING
MICROSOFT EXCEL
MICROSOFT POWERPOINT

Languages

Arabic
Intermediate
English
Expert
Punjabi
Native Speaker
Urdu
Native Speaker

Memberships

PAKISTAN ENGINEERING COUNCIL
  • REGISTERED ENGINEER
  • September 2014
SAUDI ENGINEERING COUNCIL
  • REGISTERED ELECTRICAL ENGINEER
  • July 2017

Training and Certifications

AUTOCAD (Training)
Training Institute:
PRECISION SYSTEM TRAINING CENTRE
Date Attended:
April 2014
Duration:
108 hours

Hobbies

  • CRICKET
    I have won many medals upto the college level.