Senior Engineer
Tawoos Power and Telecommunications
مجموع سنوات الخبرة :11 years, 7 أشهر
road work & utility for relocation of utilities of WADI KABIR to QURRAM extension road and done following jobs.
•Having experience to study the GIS DATA Power and transmission cable and making relocation plan as per road design and approval from concerned authorities, cross section drawings and utilized the drawing for the purpose of utilities to show the part of road construction limit affected in the main alignment.
•Marking of utilities
• Preparing drawing to mentioned utilities as per surveyed.
•Preparing the relocations drawings Fiber Optic Oman Tel, Nawras, Copper cable, final approval from Head offices.
•Preparing bill of quantities for with unit price description to add the item in a BOQ.
•Make arrangements of all utilities Permits with different concerned authorities, Municipalities, water depot, for power permit with Mazzon and MEDC.
•Preparing relocation drawing for 11KV & 33 KV line, BOQ items and makes approval from authorities.
•Make arrangement the work near Petroleum Development Oman ( PDO ) and Oman Gas Company (OGC ) lines for the issuance of the NOC and Permit to work (PTW).
•All documentation work for consultant verification, site inspection, and material preparing the relocation plan for water line relocation and final approval. From authorities, design part the coordination with Mott Macdonald’s to design the e relocation plan due to congested area of utilities corridor.
•Prepare the concerned authorities letters to send information for project.
with GENERAL DYNAMICS COMPANY in Oman SAF SIGNAL PROJECT HF-1KW.
MAIN RESPONSIBILITIES ARE:
Survey for land marking of antenna existence point and tower existence from specific degree from Ref. Magnetic North
•Tower foundation RCC structure work, including excavation, hard rock cutting as per foundation size.
•Execute the plan & installation to establish 24 new sites in close coordination with the Main Contractor, General Dynamics America in all over Oman.
•Installation, Integration & Commissioning of 3065-102-2K, 3065-104-2K, 3065-113-2K and 5065-102-1k, 3065-102-2k Transmitter, Receivers and transceiver antenna works.
•Review & organize the site drawing for excavation & conduit work. Implement the plan as per approved drawings & standards.
•Make material arrangements & inventory management.
•Installation for Fiber OPTIC, making trench line, conduit pipe installation for fiber optic termination end to end and record keeping procedure.
courses: S.C (1998) •S.S.C MATRIC (1996 )