Nader Ahmed, SCADA and ITS Senior Engineer

Nader Ahmed

SCADA and ITS Senior Engineer

Systra

Location
Egypt - Cairo
Education
Master's degree, Automation
Experience
23 years, 5 Months

Share My Profile

Block User


Work Experience

Total years of experience :23 years, 5 Months

SCADA and ITS Senior Engineer at Systra
  • Egypt - Port Said
  • My current job since October 2019

Submittals review
Shop drawings review implementation
SCADA Testing
Monitoring and supervision Ring Main Units
Collecting and control Lighting control System
Supervising generator operation and connection with switchgear via building management system
Traffic and barriers minoring and supervision
Access control system Implementation
Fire Alarm system integration SCADA.
UPS, Batteries and Emergency generators integration with SCADA

Consultant at Systra
  • Egypt - Cairo
  • My current job since September 2019

SCADA and ITS Senior Engineer
Submittals review
Shop drawings review implementation
SCADA Testing
Monitoring and supervision Ring Main Units
Collecting and control Lighting control System
Supervising generator operation and connection with switchgear via building management system
Traffic and barriers minoring and supervision
Access control system Implementation
Fire Alarm system integration SCADA.
UPS, Batteries and Emergency generators integration with SCADA

Assai. Construction Manager at Parsons
  • Qatar - Doha
  • February 2013 to January 2015

Assist Construction Manager (Parsons) for Lusail City project
The project cost around 5000, 000, 000 $, which contains about 10 million points of input/ output.
Review of I/O points, Review / Modify the programming philosophy and interacting with Sub Systems through RTUs
Substation network, communication criteria, PLC, stand alone controller…etc
Infrastructure technology for smart City topology and interaction with all subsystems

I am working with Gold-Mind Company at Bahrain for support with Human recourses.
I have good experiences as team Leader with Oil & Gas Projects at Gulf area as follows:
From Jan 2012 till Now
Shaybah NLG (Saudi Arabia) (Gold mind Bahraini Company)

Tasks: PDR, CDR, Clint meeting, I/O DB review and summarized, Report activates, Graphics review, interface, and PM supporting

Team Leader PKG#1 (Yokogawa System)
1. Review Yokogawa DCS design
2. Collect information's form other PKGs (compressor, moving machines)
3. PDR meetings and documentations for design inputs
4. I/O Database checks, spares
5. Advice Yokogawa for complex loops
6. FAT plan and strategy
7. IFAT schedule
8. CDR Meeting and documentations design inputs
9. Meetings for measure activates to get the projects status according to time plane
10. SAT
11. Commission and start-up

Team Leader for Yokogawa DCS at NRC North Refinery Company
  • Bahrain - Manama
  • April 2010 to December 2011

From Apr. 2010 till Dec. 2011
NRC North Refinery Company, IRAQ (Middle East Process Automation Bahraini Company)

Tasks: Team leading, Clint interface, Report activates, PM supporting, MOM, devices selection and I/O DB review

Team Leader for Yokogawa DCS
1. Old design input (conditional control)
2. Converted and segregated to different areas
3. Design Yokogawa DCS
4. Collect information's form all areas (Electrical, machines, Lab, ..etc)
5. PDR meetings and documentations for design inputs
6. I/O Database checks, spares
7. Lead Yokogawa for handling complex loops
8. FAT plan and strategy
9. IFAT schedule
10. CDR Meeting and documentations design inputs
11. Meetings for measure activates to get the projects status according to time plane
12. SAT
13. Commission and start-up

Team Leader for SIEMENS S7 at Texaco Oil & Gas Limited (UK) (PENSPEN UK Company)
  • United Kingdom
  • March 2009 to March 2010

From Mar 2009 till Mar 2010
Texaco Oil & Gas Limited (UK) (PENSPEN UK Company)

Tasks; Team coordination, Clint interface, Report Activates, Meetings with 3rd party and overview FAT and SAT producers

Team Leader for SIEMENS S7
1. Design Siemens S400 System
2. fail-safe controllers
3. FMR technology (Flexible Modular Redundancy)
4. Collect information's form other (compressor, Pumping area, machines)
5. PDR meetings and documentations for design inputs
6. I/O Database checks, spares
7. Advice Siemens for complex loops
8. FAT plan and strategy
9. IFAT schedule
10. CDR Meeting and documentations design inputs
11. Meetings for measure activates to get the projects status according to time plane
12. SAT
13. Commission and start-up

Team Leader, Monitors at Al Forat Petroleum Company at Syria) (SILVERTECH Company
  • United Arab Emirates - Dubai
  • February 2008 to February 2009

From Feb 2008 till Feb 2009
AFPC (Al Forat Petroleum Company at Syria) (SILVERTECH Company)

Tasks: Team Leader, Monitors activates, Clint and 3rd part meetings, Progress and activates reports, Graphics overview and complexes loops overview

Senior Project Engineer DCS, ESD and Fair and Gas systems analyzers (Field Bus, SCADA, Hard Communication, case and effect, project execution and documentation and on-site training for YOKOGAWA DCS): 1. Old design input (conditional control)
2. Converted and segregated to different areas
3. Design Yokogawa DCS
4. Collect information's form all areas (Electrical, machines, Lab, ..etc)
5. PDR meetings and documentations for design inputs
6. I/O Database checks, spares
7. Lead Yokogawa for handling complex loops
8. FAT plan and strategy
9. IFAT schedule
10. CDR Meeting and documentations design inputs
11. Meetings for measure activates to get the projects status according to time plane
12. SAT
13. Commission and start-up
14. On Site Training

Team Leader Engineer at SILVERTECH Co
  • United Arab Emirates
  • January 2007 to January 2008

From Jan 2007 till Jan 2008
SILVERTECH Co. at Dubai (ZADCO Plant)

Tasks: Meeting with Clint and 3rd part, Planning, Report (activates, Progress and needed actions), PDR and CDR meetings and support PM for needed activates

Team Leader Engineer for ZADCO DCS, EDS, Energy measurement & saving and Faire and Gas systems using Siemens Step-7 CPU 400H:
1. Review Design Siemens S400 System
2. fail-safe controllers
3. FMR technology (Flexible Modular Redundancy)
4. Collect information's form 3rd part and all PKGs
5. FDS (Functional Design specifications) meeting
6. PDR meetings and documentations for design inputs
7. I/O Database checks, spares
8. Advice Siemens for complex loops
9. FAT plan and strategy
10. IFAT schedule
11. CDR Meeting and documentations design inputs
12. Meetings for measure activates to get the projects status according to time plane
13. SAT
14. Commission and start-up

Team Lead SCADA Engineer at PM and Supervise FAT & SAT
  • United Arab Emirates
  • January 2006 to December 2006

From Jan 2006 till Dec 2006
YOKOGAWA UK, Zuetine SCADA Project

Tasks; FDS meeting, Clint and 3rd part meeting, Report activates, support PM and Supervise FAT & SAT tests

Team Lead SCADA Engineer (YOKOGAWA UK at Abu Dhabi SCADA system for Gas Transmitting Pipe Line with PENSPEN UK-Abu Dhabi:
1. (Functional Design specifications (FDS) for Zuetina project, SDCADA, Loops, Mimics, alarms, Tags, 3rd Party, compressor PKG, etc)
2. Design SCADA HW, SW, Structure, 3rd part,
3. PDR meetings and documentations for design inputs
4. I/O Database design, spares locations
5. Different communications topologies (Fibre optics, Ethernet, Wireless, ..etc)
6. FAT plan and strategy
7. IFAT schedule
8. CDR Meeting and documentations design inputs
9. Meetings for measure activates to get the projects status according to time plane
10. SAT
11. Commission and start-up

Senior Project Engineer for SASREF at Saudi Aramco Shell Refinery Co
  • Saudi Arabia
  • January 2005 to December 2005

From Jan 2005 till Dec 2005
SASREF (Saudi Aramco Shell Refinery Co.) (International System Est. Saudi Company)

Tasks; Meeting with Yokogawa, Report activates, PDR & CDR meetings, supervise FAT and SAT and cooperate with commissioning and start-up

Senior Project Engineer for SASREF (Saudi Aramco Shell Refinery Co.) rehabilitation Foxboro system to Yokogawa system CENTUM 3000, CPI Dep.
1. Old design input (conditional control)
2. Converted and segregated to different areas
3. Collect all plant narratives
4. Review Yokogawa DCS design
5. Collect information's form all areas (Electrical, machines, Lab, ..etc)
6. PDR meetings and documentations for design inputs
7. I/O Database checks, spares
8. Lead Yokogawa for handling complex loops
9. FAT plan and strategy
10. IFAT schedule
11. CDR Meeting and documentations design inputs
12. Meetings for measure activates to get the projects status according to time plane
13. Hot Cut off plan
14. SAT
15. Commission and start-up
16. On Site Training

Senior Maintenance Engineer at SASREF MTS Department at Saudi Aramco Shell Refinery Co
  • Saudi Arabia
  • December 2003 to December 2004

From Dec 2003 till Dec 2004
SASREF (Saudi Aramco Shell Refinery Co.) (International System Est. Saudi Company)

Tasks; Team Leading, Report activates, spare parts DB, Plane & Seclude checks and maintenances activates (F&G, DCS, ESD and others),
Senior Maintenance Engineer at SASREF MTS Department
1. Plant systems
2. Spare part plan
3. Stock spares.
4. Schedule checks
5. Built spear parts plan
6. Data Base for critical items (Date, area, etc)
7. Follow up all needs and quires
8. Hot cut off actions
9. Shut down areas
10. Maintenances period,
11. Regular check

Team Leader for LICS system in SEGAS Project at Giza System Company
  • Egypt - Cairo
  • January 2003 to November 2003

From Jan 2003 till Nov. 2003
Dommita NLG (SEGAS Project Egypt, UK vendor) (Giza System Company)

Tasks; Clint meetings, Report activates, Man/ Hour calculation, 3rd interface, management actions and support PM

Team Leader for LICS system in SEGAS Project (Schneider PLC, YOKOGAWA Fast tools and Metering Devices)

1. Communication protocols
2. Addressing Technique
3. Data Handling
4. Networking Configuration
5. Metering Devices
6. Interfacing
7. PLC & DCS Configuration
8. SCADA reading
9. Data storage

Team Leader for ESD at CONTCH Egyptian Company
  • Egypt - Cairo
  • January 2002 to December 2002

From Jan 2002 till Dec. 2002
Alexandria Refinery ESD (Egypt) (CONTCH Egyptian Company)

Tasks; meeting with Clint & ENPI, Report activates, PM supporting, Supervise SAT & FAT and review I/O DB

Team Leader for ESD (communication with DCS)
1. ESD Narrative
2. I/O hardwired
3. SFC
4. Communication like on DB
5. FAT,
6. SAT
7. Commissioning & Start-up

Team Leader for Systems at NLG Plant
  • Egypt - Alexandria
  • January 2000 to December 2001

From Jan2000 till Dec 2001
BURULUS plant (NLG Plant, Egypt) (CONTCH Egyptian Company)

Tasks; Clint meetings, Report activates, Man/ Hour calculation, 3rd interface, management actions and support PM

Team Leader for Systems
1. Schneider PLC (configuration)
2. Yokogawa DCS (I/O DB)
3. Communication Technique
4. SCADA programming
5. Database Configuration, Devices
6. Function Design Specifications for project
7. PDR
8. CDR
9. FAT
10. IFAT
11. SAT
12. Commissioning & Start-up

Team Leader for Systems at CONTCH Egyptian Company
  • Egypt - Cairo
  • December 1996 to December 1999

From Dec. 1996 till Dec. 1999
SCADA for Nobaria Water pumping station (Egyptian Ministry of Water) (CONTCH Egyptian Company) between Nobaria station and the Minister office to supervise the water performance


Team Leader for Systems
1. Function Design Specifications for project
2. Meeting with 3rd party packages
3. System Design
4. Database Configuration, Devices
5. PLC programming
6. Intelligent devices configuration
7. Communication Technique
8. SCADA programming
9. Database Configuration, Devices
10. PDR
11. PM supporting
12. CDR
13. FAT
14. IFAT
15. SAT
16. Commissioning & Start-up

Free Lance DCS at Rockwell PLC Control Training (Cairo)
  • Egypt
  • August 1998 to August 1998

Positions;
Team Leader Engineer
Professional Trainings
• Training in USA (Ohio state) for Freelance and ABB DCS (DCS Different Programming Language for it, Hw structure, Database handling, Communication Techniques, Networking, Diagnosis and Configuration Aug.1998)
• (Free Lance DCS) (DCS programming, configuration, Fault detection, Networking and System Architecture at Sudan Dec. 2004 by Revising and updating competency document for Instruments technicians & senior technicians
• Training on Siemens (Step 5 programming, configuration, Fault detection and Networking Configuration techniques at Sadat City Nov. 2002 for Ezz still factory)
• Rockwell PLC Control Training (Cairo): Have taken 5 days training on "PLC, Programming with control Logix" at Rockwell Automation Cairo.
• SACDA training course at Siemens Egypt for WinCC: for 5 days, introduction, Tags configuration, Scripts, drawings, Trends, OPC server, connecting 3rd party.
• Developing Control Logix and IFIX In-touch (Germany): 5 Day training on structural programming of Control Logix and IFIX In-touch conducted by in-touch Automation Germany

Team Leader for Systems at CONTCH Egyptian Company
  • Egypt - Alexandria
  • April 1994 to November 1995

April 1994 till Nov. 1995
DCS system for boiler plant (Alex Petroleum factory) (CONTCH Egyptian Company)

Team Leader for Systems
1. Function Design Specifications for project
2. Monitoring and fault detection for boiler plant (a Allen Bradley PLC system)
3. DCS using Info 90 Bailey
4. Communication Technique
5. SCADA programming
6. Database Configuration, Devices
7. PDR
8. PM supporting
9. CDR
10. FAT
11. IFAT
12. SAT
13. Commissioning & Start-up

Education

Master's degree, Automation
  • at Cairo University, Faculty of Engineering
  • April 1996

Expert system of PID tuning and configuration

Bachelor's degree, Electrical Engineer
  • at Cairo University
  • January 1992

Bachelor of engineering, Faculty of engineering, Cairo University, Electrical and machines department 1992

Specialties & Skills

Languages

English
Expert

Training and Certifications

Traninf courses for Bailey DCS as Expert (Certificate)
Date Attended:
August 1999
Valid Until:
August 1999

Hobbies

  • Football Sports
    Playing as goal keeper 10 years as professional