Project Manager
Jouzy Consulting Engineers
Total years of experience :25 years, 2 Months
District Cooling Project: Construction, Completion, and Maintenance, in the Defect Liability Period, of DIFC Network Extension Along Road 312 to Zabeel with Connectiion to WTC Project. (Client: EMPOWER)
Various projects involving supervision of construction, design, design review, and tender documents preparation:
Design/tender documents preparation and supervision for Bebnine (Tripoli) water networks project-app. 30 Km (USAID Project).
Tender documents review for Haouch El Oumara water networks-app. 40 Km.
Preliminary design development for wastewater collection network in Aarsal-app. 50 Km.
Supervision of construction of water networks in the Caza of Jezzine-app. 80 Km
Contract O-1383.1: Construction Works Associated with Rehabilitation and Replacement of VC Sewer Lines at Mussafah Industrial Area-Category B. (Consultant: Dorsch Consult/Client ADSSC-Abu Dhabi Sewerage Services Company).
1. Relining of app. 14 Km of sewer pipes-Trenchless technology
2. Replacement of app. 8 Km of sewer pipes
3. Cleaning and CCTV of app. 35 Km of sewer pipes
4. Micro-tunneling-app. 700 m
5. Refurbishment/Construction of new manholes
Various projects with GRP Pipe fabrication and lamination works - Dias 25mm to 3450 mm
Projects:
1. BARWA Commercial Avenue-Package 10: Chilled Water System. Complete installation of around 14 Km of pre-insulated GRP pipes (supply and return) with leak detection system and construction of heat exchange and other chambers complete with valves.
(Main Contractor: HOCHTIEF Construction Qatar/Consultant: Maunsell)
2. RAF A-1 New Water Power Plant, Ras Abou Fontas-complete fabrication and installation of all underground and part of above ground GRP piping system.
(Main Contractor: FISIA ITALIMPIANTI/Consultant: Parsons Brinckerhoff)
3. Q-CHEM II Ethylene Derivatives Project - GRP joint lamination works at QCHEM I & II
(Main Contractor: DAEWOO E&P)
4. RAS LAFFAN Common Cooling Sea Water System, Phase II
Contract DS-174 (AED 272 Million): Main Irrigation Lines. (Consultant: ACE International). The contract consists of:
1. Construction and connection to existing lines of 8# GRP main irrigation lines of different diameters and around 66 Km total length all over Dubai:
Line L1 Ras El Khor (Sanctuary) Ø 1, 200 mm
Line L2 Emirates Road Ø 500 mm and Ø 700 mm
Line L7 Jebel Ali Ø 700 mm
Line L9 Ras El Khor Industrial Ø 500 mm and Ø 600 mm
Line L10 Nad El Sheba Ø 500 mm
Between 4 and 6 Km each
Line L4 Academic City Road Ø 1, 200 mm
Line L5 Dubai-Al Aïn Road Ø 800 mm
Line L8 Al Khail Road Ø 600 mm and Ø 800 mm
Around 14 Km each
2. Construction of chambers and installation of valves of different types
3. Construction of a new booster pump station between Lines L5 and L4 on Dubai-Al Aïn Road complete with SCADA system.
4. Installation of flow meters in several parks in Dubai.
ADSS Contract 190/10: Cleaning and Inspection Survey Phase I -Abu Dhabi Island, Baniyas, and Shahama. (Consultant: Dorsch Consult)
- Cleaning and Survey of over 140 Km of Sewer lines with sizes between 150 to 300 mm dia.
- Topographic Survey for around 3, 500 manholes
- Supply and installation of a Data Information System (DIS) for the Abu Dhabi sewerage network -Abu Dhabi Municipality
In addition I designed an MS Access database to manage all project data, prepare all reports, and issue monthly valuations. The database was linked to the project construction program in Primavera to monitor progress and issue progress reports and to AutoCAD to later generate as-built drawings.
Managing PMs on different projects involving design, supply, and installation of laminated and/or tempered glass facades/skylights with stainless steel accessories (stainless steel frames, spiders, …)
ADSS Contract 190/7: Construction and rehabilitation of the trunk sewer of the city of Abu Dhabi, C-line. Subcontract for sewage overpumping, sewer cleaning, sealing, and survey works. (Consultant: Dorsch Consult)
ADSS Contracts 190/5 and 190/8: Construction and rehabilitation of the trunk sewer of the city of Abu Dhabi, D-Line, F-Line, and L-line. (Consultant: Parsons International Limited)
Contract 515/3: Urgent Miscellaneous Storm Water Drainage Works at Al Aïn Road and PS 12 Area. (Consultant: Parsons International Limited)
ADSS Contract 190/4: Construction and rehabilitation of the trunk sewer of the city of Abu Dhabi, K-Line, E-Line, and B-Line. (Consultant: Parsons International Ltd)