naser abdalla, Site civil operations manager

naser abdalla

Site civil operations manager

Consolidated contractors for energy development

Location
Jordan - Madaba
Education
Master's degree, Civil Engineering
Experience
27 years, 10 Months

Share My Profile

Block User


Work Experience

Total years of experience :27 years, 10 Months

Site civil operations manager at Consolidated contractors for energy development
  • Oman - Muscat
  • February 2010 to February 2017

Responsible for the preparation of drilling sites and locations. Road construction and maintenance. Pipeline laying and right of way construction and maintenance.

Project Manager at Consolidated Contractors Company (CCC)
  • Nigeria
  • May 2009 to January 2010

Responsible fo the management of a 52 km dual carriageway federal road project. Complete rehabilitation including but not limited to the construction of side concrete open channel drain, subbase construction using laterite material, base construction using stone base (wet mix) and laying two courses of asphalt mix (binder and wearing).

Project Engineer / Site Manager at Consolidate Contractors Company CCC
  • Oman - Muscat
  • July 2006 to April 2009

Project Engineer on Road Improvements in Darsait: the project consisted of the conversion of two roundabouts to fully signlized 4-legged intersections. In addition to construction of a 260 meter long modular block wall that reach up to 9.5 meters high.

Project Engineer on Suhar-Buraimi road: The project consisted of the dualization of a 81 km road with pipe and box culverts for drainge, cut and fill of nealy 5 million cubic meters, aggregate base course (wet mix), Binder and wearing courses, Guardrail, New Jersey barrier, Riprap protection and relocation of several underground utilities.

Site Manager at Haymoor Cousins Company
  • Jordan - Amman
  • March 2000 to May 2006

Site manager for the excavation works, earth fill works, construction of a 2 km road entrance to the Wala Dam in Jordan.
Project Manager for the evaporation ponds project which consisted of constructing 4 ponds utilizing 1 million cubic meters of suitable fill material, laying a 7 km GRP pipeline which transports liquid waste from the factory to the ponds, and the construction of a 7 km access road to the bonds.
Site Manager for the complete construction of a 8.1 km dual carriageway highway in Assalt ( AsSalt Ring Road) with nearly 1.3 million cubic meters of cut and fill, subbase, aggregate base course, binder and wearing courses, guardrail, new jersey barrier, riprap protection and relocation of both aerial and underground utilities.

Highway Engineer / Design at Maine and Arizona Department of Transportation
  • United States
  • January 1989 to November 1999

Reached a Team Leader position in the highway design section where I was responsible to check and approve the design work of a 5-man team of designers, and program all projects in accordance with the time schedule and budget constraints for each project.

Education

Master's degree, Civil Engineering
  • at South Dakota State University
  • August 1988

Assistantship for 2 years GPA 3.33

Specialties & Skills

Civil Engineering
Excavation
Civil Works
Construction Engineering
Project Collaboration
MS EXCELL
MS WORD
MS project

Languages

Arabic
Expert
English
Expert

Memberships

Jordan Engineers Society
  • member
  • February 2000