nasser khattab, Water and Wastewater Consult

nasser khattab

Water and Wastewater Consult

Tetra-Tech Consult USAid Consult

Location
Egypt - Cairo - Giza
Education
Doctorate, Optimization Modelling water and wastewater Treatment Plant (Under Process)
Experience
35 years, 2 Months

Share My Profile

Block User


Work Experience

Total years of experience :35 years, 2 Months

Water and Wastewater Consult at Tetra-Tech Consult USAid Consult
  • Egypt - Cairo
  • My current job since May 2016

- Provide Technical Solutions for 5 Water and Wastewater Companies, (Menya, Asuit, Sohag, Qena and Luxor).
- Review and Reports all Problems or Faults at Water and Wastewater Equipment.
- Advise with solutions and follow up untill finish.
- Works include Design, Design Review, Manage installation, Operation and Maintenace.
- Provide Tender Specification.
- Supervise All Dismantling, Installation, Commissioning, Training and Handling Over for most Equipment.

Senior Mechanical Engineer at Engicon - Qatar
  • Qatar - Doha
  • October 2016 to May 2019

- Design and Design Review for Mechanical and Hydraulic works for upgrade 7 wastewater Pumping Stations around Doha. (Project 770)
- Review all Submittal related to Pumps, Valves, Hydraulics, Cranes, Screens, Grinders, Generators, OCU, ...etc.
- Supervise all Mechanical and Hydraulic Works,

Company Technical consult at Giza Water & Wastewater Co.
  • Egypt - Cairo
  • November 2014 to September 2016

- Review all Company T.O.R. w.r.t. Egyptian Code and make required changes.
- Required consultancy on various contractual.
- Study stakeholder's claims and solve it.
- Establish evaluation and inspection Models for all company sites.
- Supervise Networks, Tunnelling, Drinking water and Sewage Projects.

Sector Head for O & M for New Cities (October & Zaid) at Giza Water and Wastewater Co.
  • Egypt - Cairo
  • November 2012 to November 2014

- Decentralization management for new cities (6 0ctober & Zaid Cities) include all departments that can help customer services to solve all Customers Complaints.
- Overseeing the implementation of the operation and maintenance plans, replacement, renewal and Contracts of the Networks, Tunnelling, Drinking water and Sewage Projects.
- Streets Flooding Control and NRW Detect and Control Expert.

Mechanical Engineer at Giza Water and Wastewater Company
  • Egypt - Cairo
  • June 2000 to October 2012

- Plan Yearly Operation and Maintenance for station include: pumps, Mechanical screen, control panels, Transformers, Motors, etc.
- Prepare required T.O.R. for Operation and maintenance requirement.
- Plan & supervise Yearly Preventive & Predictive maintenance for Lifting stations, treatment plants include: Pumps, Generators, and Screens.
- Prepare required training & materials for Workshop Staff.
- Plan and Supervise Yearly Required procurement include: pumps, generators, screen, Cranes and aerators, control panels, Transformers, Motors, Gear boxes...etc and Spare Parts.
- Prepare required Cost Estimation.

Mechanical Consultant Engineer at AMBRIC
  • Egypt - Cairo
  • March 1989 to June 2000

- Plan & Supervise Installation of required equipment, spare parts and special tools.
- Prepare required training courses materials for many discipline.
- Provide Training for recommended staff (engineers and technicians)

Education

Doctorate, Optimization Modelling water and wastewater Treatment Plant (Under Process)
  • at Cairo University
  • December 2022
Master's degree, M.Sc. in Water resources Engineering (Utilities Engineering) " Evaluation Performance of Wastewat
  • at Cairo University-Faculty of Engineering
  • November 2011

Mass balance of activated sludge treatment plants, flow rates, BOD5 and TSS are important parameters for efficient operation of wastewater treatment plants. Mass balance also monitors the performance of each component and process at all locations in the treatment plant in order to meet the acceptable treatment criteria. A large number of laboratory experiments have been carried out on a daily basis to investigate the performance of ZWWTP. In conclusion, after implementing mass balance, activated sludge treatment plants can be controlled, analyzed with different influent parameters values of flow, total suspended solids (TSS) and biochemical oxygen demand (BOD5). ZWWTP has high treatment performance through year 2008 and meet Egyptian code standards with average removal efficiency of BOD5 95% and average removal efficiency of TSS 97 %.

Bachelor's degree, Mechanical Engineering
  • at Benha University
  • August 1984

Mechanical Engineering- Mechanical power Division. 5-Year Engineering - project include pumps for many utilities.

Specialties & Skills

Key Performance Indicators
Consulting
Procurement
Supervise Mechanical Works
Project Mechanical Engineer
CONSULTING
CONTRACT MANAGEMENT
ENGINEERING
GENERAL MANAGEMENT
MECHANICAL
TECHNICAL SUPPORT
Operation and Maintenance Sector Head Director

Languages

Arabic
Expert
English
Expert

Memberships

Egyptian Engineering Sydicate
  • Consult Certificate
  • August 2008
MMUP - Qatar
  • UPDA - Grade A
  • October 2017

Training and Certifications

Physical Modelling Witness Test (Certificate)
Date Attended:
December 2017
Operation and Maintenance of Screw pumps (Training)
Training Institute:
Spaans- Babcock. BV, Netherland
Date Attended:
August 1998
Saving and reuse of wastewater (Training)
Training Institute:
Saving and reuse of wastewater
Date Attended:
May 1999
Organization Development for Utilities (Training)
Training Institute:
In went, German. E-Learning
Date Attended:
June 2010
Sector Governance in Urban Sanitation (Training)
Training Institute:
In went, German. E-Learning
Date Attended:
November 2010