Work Experience

Total years of experience :29 years, 8 Months

Sr. Project Engineer at Mansour Al Mosaid Trading and Contracting Company
  • Saudi Arabia - Jeddah
  • My current job since February 2020

• Supervised shutdown construction / up gradation of various projects with Petro Rabigh under General Maintenance Contract.
• Supervised and completed the project of Construction of New Product Development Center II at Petro-Rabigh for Plumbing, PEB Structure, HVAC System, and Fire Alarm & Fire Fighting System as per IFC Drawings.
• Supervised up gradation of HVAC System at QC Polymer Lab (Petro Rabigh) to provide 100 % fresh air.
• Supervised ESP (Electrostatic Precipitators) shutdown maintenance activities at NOMAC Shuaiba
• Develop cost estimates and coordinate proposals for assigned estimating projects.
• Identify the required resources to complete the work: manpower, contracting services, equipment, tooling & facilities.
• Supervise Fabrication Workshop to complete pre-shutdown activities for piping, structure, and platform fabrication, and sand blasting & painting as well as piping hydro testing.
• Work closely with Project team, customer, stake holders, vendors, contractors and ensure all are coordinated to work efficiently and meet timeline & milestones.
• Review of engineering design packages, ensuring all engineering activities in project is in full compliance with codes, standard and requirement of project contract.
• Ensures that engineering related barriers to construction progress are removed in a timely manner.
• Coordinate with internal resources and third parties/ vendors for the flawless execution of projects.
• Coordinate with Procurement for expediting MR, PO, material delivery and vendor facility technical feasibility survey.
• Perform site visit during bidding & engineering phase ensuring reliable & safe design review of engineering packages.
• Prepare WBS for scheduling, project execution plan, mobilization plan, look ahead plan, construction scope of work, method statement, review of technical documents & drawing and initiating queries to concerned team.
• Organize the weekly/ monthly progress meeting with construction team to understand the anticipated bottlenecks/ scheduling conflicts & work on preventive actions to keep the project on track.
• Monitoring, tracking, progress analyzing, expediting & follow up sub-contractors’ activities & works for smooth execution and within schedule completion of project activities.
• Establish temporary construction facilities (lay down area) at site for execution of construction activities.
• Detailed planning and day-to-day direction of field activities.
• Establish and maintain good working relationships with clients and ensure effective communication with various stakeholders.
• Monitoring all work, at all stages, to ensure that an accurate and professional service is offered.
• Verify & certify the sub-contractor’s invoice with respect to quantum of work completed & pre-assigned weightages & work order.
• Attend project KOM, constructability session and participate in project Risk, HAZOP & PIM meeting.
• Submit shop drawings, site daily dairy, TQ’s / RFI’s, Material Submittal, Method statement for review and approval
• Liaise with quality team to ensure project QA & QC requirements are met such as PQP, procedures, ITP, welding qualifications & inspections at all stages.
• Work on punch point closing and technical involvement during pre-commissioning, commissioning & start up support.
• Preparation & compilation of project closeout documentation, QC Dossier & As-Built documents.
• Maintain a safe and clean working environment by enforcing HSE procedures, rules, and regulations.
• Active involvement in safety programs within the site.
• Ensuring work practices are in compliance with environmental procedures.

Maintenance Manager at Al Nahdi Industrial Gases Company
  • Saudi Arabia - Jeddah
  • November 2019 to January 2020

• To manage the maintenance team for the maintenance of LPG supply system at Industrial, Commercial, and Domestic Level including LPG piping network and LPG Safety System.
• To prepare and hold annual maintenance contracts with the customers.
• To manage the planning of the maintenance team preventive and emergency visits at the customer sites.
• Annual Budget preparation for the maintenance department.
• To hold meetings with existing as well as new customers for understand their needs for continual improvements in the services.
• To manage the productivity, quality, and efficiency of the maintenance team

Plant Engineer at Southern Can Making Company
  • Saudi Arabia - Jeddah
  • April 2017 to October 2019

• To supervise operation and maintenance of Diesel Engine Power Generator Sets, Air Compressors, Vacuum Machines, Water chiller Units, Vehicle & Forklift Workshop, and LPG Station.
• To manage the facilities i.e. company premises, staff offices, and staff accommodation for installation, repair and maintenance of plumbing, lighting window & split type A/Cs.
• Maintenance Planning, Equipment / spare parts selection and to maintain their enough stock level.
• Supervised the Fire Water Sprinklers system installation project at different premises of the company.
• Supervised plant cooling system NH3 chillers and AHUs installation at the factory.
• Supervised Fire Water and Foam sprinklers deluge system installation for LPG & Diesel Storage Tanks.

Utility Foreman at Al Rajhi Steel Production Company Limited
  • Saudi Arabia - Jeddah
  • December 2008 to November 2016

Operation & maintenance of 220 TPD Air Separation Plant, Argon Gas supply system, LPG Station, Fuel oil Station, and Compressed Air Plants.
To ensure the compliance of the production program for Air Separation Plant, and ensure continuous supply of Oxygen, Nitrogen & Argon gases, Compressed Air, Fuel Oil, and LPG with required quantity and quality to the Melt shop following the established regulations for safety and quality.
To supervise the ASP bulk products Liquid Oxygen and Liquid Nitrogen filling to the customer tankers.
To supervise the maintenance activities for CCM Heating & Cutting Gases (Oxygen, LPG) valves train, EAF gases (Oxygen, Nitrogen, LPG and oil free Compressed Air) supply valves train, Ladle & Tundish Pre-Heaters, Ladle Gas Stirring system Panels.
To generate daily, weekly, and monthly reports regarding Melt Shop utility products consumption & receiving, and ASP bulk products sales.
Completed the projects of installation, commissioning, and start-up of Liquid Argon Storage Tank, Liquid Oxygen and Liquid Nitrogen Pumps.

Plant Engineer at Saudi Industrial Gas Company Limited
  • Saudi Arabia - Dammam
  • July 2002 to November 2008

To perform operation and maintenance of 90 TPD Air Separation Plant.
Maintenance planning and Preventive / shutdown maintenance execution of all the machines in the plant which are reverse osmosis water purification plant, cooling towers, air filter unit, centrifugal air compressors, heat exchangers, air dryers, refrigeration unit, expansion turbines, cryogenic reciprocating and centrifugal pumps, water pumps.
To carry out plant behavior and production analysis.
Supervision of bulk products i.e. liquid oxygen, nitrogen, and argon filling and dispatch activities.
Supervision of gases filling station.
(Sep-2005 to Apr-2006) Supervised the project of installation, erection, commissioning, and start-up of 13 TPD Cosmodyne Air Separation Plant in Jeddah.

Service Co-ordinator at Al Salam York Services Ltd
  • Saudi Arabia - Eastern Province
  • August 2001 to June 2002

To control the service team to perform service, repair, preventive and emergency maintenance of HVAC equipment.
To schedule the service technicians and collect their field service report on daily basis.
To arrange spare parts and material required for the service jobs.
To estimate the service jobs taking into consideration of labor, spares / material and time required before their execution.
To lay out all the procedures, formalities and documentation necessary for the service jobs.

Maintenance Engineer at Fine Gas Company Ltd
  • Pakistan - Lahore
  • January 1997 to July 2001

• To lead the maintenance team to perform maintenance of 100 TPD Air Separation Plant which includes cooling towers, centrifugal air compressors, air filter unit, centrifugal water pumps, cryogenic pumps (centrifugal & reciprocating), heat exchangers, refrigeration units, expansion turbines, APUs, bulk products (liquid oxygen, nitrogen, and argon) storage tanks.
• To execute installation and maintenance of oxygen cylinder filling stations, oxygen / nitrogen gas supply system, and storage tanks at the customer stations and medical gases supply system at the hospitals.
• To perform maintenance of Nitrous Oxide and Dissolved Acetylene (DA) plants.
• To supervise the machine tools workshop for maintenance and fabrication work.
• Equipment / spare parts selection and to maintain their enough stock level.
• To supervise the facility maintenance team for installation, repair and maintenance of window & split type A/Cs, plumbing, and firefighting system.
• Supervised the Fire Water Sprinklers system installation project at different premises of the company.

Maintenance Engineer at Hafeez Shafi Tanneries Pvt Ltd
  • Pakistan - Lahore
  • September 1995 to January 1997

To plan and execute the repair and maintenance of tannery machines, air compressors, water pumps, heat exchangers, refrigeration units, valves and pipe line network.
To supervise operation and maintenance of steam boiler.
Designed and supervised the contruction of Effluent Treatment Plant in the factory.
To arrange spare parts and maintain pre decided stock level.

Shift Engineer at Fast Line Pvt Ltd
  • Pakistan - Lahore
  • July 1994 to September 1995

• To lead the production team in the shift to achieve month-wise production target.
• To schedule and execute maintenance of machines involved in the production, air compressors and diesel engine power - generator sets.
• To arrange material / spare parts and maintain their enough stock level.
• To perform the duties of Fire Fighting Officer (FFO) to train the factory workers / staff in firefighting by delivering safety lectures and executing firefighting drills and to keep firefighting equipment (FFE) in operative condition to control fire accidents.

Education

Bachelor's degree, Mechanical Engineering
  • at University of Engineering and Technology
  • June 1994

BE Mechanical Engineering with Honors.

Specialties & Skills

Workforce Management
Presentation Skills
Manufacturing Leadership
Industrial Safety
Computer litrate, presentation, leadership, communication and interpersonal skills

Languages

English
Expert
Arabic
Intermediate
Urdu
Expert

Memberships

Pakitan Engineering Council
  • Member
  • August 1994
Saudi Council of Engineers
  • Member
  • December 2011

Training and Certifications

OHSAS 18001 : 2007 Workshop (Training)
Training Institute:
QCC
Date Attended:
February 2011
Duration:
6 hours
Project and People Management (Training)
Training Institute:
SIGA
Date Attended:
February 2006
Duration:
6 hours
Cryogenic Engineering (Training)
Training Institute:
SIGAS
Date Attended:
February 2006
Duration:
12 hours
Basic Safety Rules (Training)
Training Institute:
SIGAS
Date Attended:
September 2002
Duration:
5 hours
ISO 9001 : 2000 Awareness Seminar (Training)
Training Institute:
ABS Group INC
Date Attended:
May 2003
Duration:
6 hours