Insulator Foreman
Nico International
Total years of experience :15 years, 0 Months
Supervision and give the instruction of the insulators.
Installed the insulation and cladding of the pipe.
Installed the insulation (pillow type) the chasing of gas turbine and steam turbine.
Make the report paper after the end of working hour.
Lift main chasing of gas turbine and
router weight is 120tons
Covered insulation on pipes and ducts
•Checked the diameter/circumference of the pipe and the size of the insulation to be used.
•Measured the length and width of the duct then cutting the insulation such as fiber glass, armaflex or other kind of insulation instructed by the superior.
•Installed insulation on steam, hot water, chill water, refrigeration lines, piping and fittings and air conditioning ducts.
•Trowels mastic or brushes cement on asbestos cloth to obtain smooth finish and covers piping with cloth.
• Fit insulation around obstructions, and shape insulating materials and protective coverings as required.
•Select appropriate insulation such as fiberglass, Styrofoam, or cork, based on the heat retaining or excluding characteristics of the material.
•Received work orders and carried out insulation duties.
•Performed related work as required.
•Construction - Project Basis