Project Manager | Innovation Technologist Lead
Fractal systems
Total years of experience :8 years, 6 Months
● Managed the technical team including mechanical designers, electronics and mechatronics engineers
● Encouraged new and innovative design concepts, inventions, patents and opportunities for product
improvement
● Plan scheduled and coordinated detailed phases of large-scale projects
● Focused on employee's engagement and productive relationships with former peers
● Increased the performance of the team by giving the trust and freedom of taking immediate actions
PROJECTS
Joy Forum 2019 - KSA
Kinetic Sphere - Fractal Systems Oct 2019
● Worked for design, cladding, content mapping, electronics and troubleshooting of the system
GITEX 2019 - UAE
Giant LED Cube - Fractal Systems Oct 2019
● Designed the mechanical structure using design CATIA
● Implemented the display panels to show the content provided by the technical team
● Assembled and configured the display panels
● Worked for electronics integrated components
● Worked as a Mechatronics Engineer use to develop new technology based on our own creative ideas and client requirements
● PCB designing using Eagle PCB design suit
● Designed the mechatronics systems by using SOLIDWORKS 2019
● Worked with electronics to control the mechanical systems using Arduino controllers and Raspberry Pi
● Worked with experienced engineering staff learned product development and quality
● 3D Mechanical Design: Advanced Part Modeling, Surface Modeling, Assembly using SOLIDWORKS and GSD using CATIA
● Having knowledge of the AV field
● Maintenance and Configuration: Kinetic ceiling motor boxes, Kinetic Sphere motor boxes, Rotating triangle drives and motors and Sliding screen maintenance
● Assembly and installation: LED screens, LED lights, Kinetic ceiling, Kinetic sphere, Kinetic Ring, Rotating Triangle, and Sliding screen
● Analyzed issues with equipment and develop solutions as well as continual improvements that can prevent
malfunction in the future
● Identify the most efficient and acceptable resolutions to complex engineering problems.
PROJECTS
Future Investment Initiative (FII 2019) - KSA
Kinetic Ring - Fractal Systems Jan 2019
● Worked for design, electronics, and analysis using 3D design software
● Worked for content mapping
Future Investment Initiative (FII 2018) - KSA
Kinetic DNA - Fractal Systems Oct 2018
● Designed the integral mechanical parts of the system
● Assembled, performed troubleshooting and displayed the content
Road to FIFA 2022 - Qatar
Matrics Ring - Fractal Systems Dec 2017
● Designed the cameras mounting structure and performed maintenance and troubleshooting
● Installation of CNC Machines and Compressor with technicians
● Lead the team of technicians and supervisors to effectively perform the scheduled maintenance
● Did effective communication with the machinery supplier in case of major breakdown
● Checking and calibrating instruments to make sure they are accurate
● Responding immediately to equipment breakdown
● Fixing faults and arranging a replacement to be installed
● Overhauling and replacing parts according to the schedule
● Basic maintenance of pneumatic and electrical components
● Preparation of Quantity Reports and Technical Details of Installed Equipment
● Basic training of CNC machines to the relevant operator
● Designing and assembly of Smart Locks and Sliding Gates using Solidworks 2017
● Designing and Manufacturing of 3D Overhead Crane
● Completed Design, performed Analysis of Crane and Manufactured Prototype
● PCB designing and routing
● Designing and analyzing electrical programs for quality, manufacturing and proper functioning
● Verifying design robustness and running tests to validate design specifications
● Performed the tasks of integrating the latest technology into all facets of Electromechanical designs
● Programmed PLC systems to perform specific functions depending on the needed output
● Used recommended software and coded using ladder logic that can be transferred to different machines
when necessary
● Designed diagrams that could be read and utilized by the average employee
● To coordinate with R&D department for Correct pricing of electronics items and decide the correct sequence
of operation for system
● Performed efficiency testing to ensure all systems are running at their peak
Major: Image Processing and Artificial Intelligence
URL removed due to policy violation. Please contact support for further information.