Mechanical Engineer
Amecron Nig Ltd (contractor to Shell Petroleum Development Company)
Total years of experience :18 years, 7 Months
Prepared and administered preventative and corrective maintenance work orders.
Collaborated with Operations Team to ensure smooth work flow and efficient operation of
four(4) crude oil production stations.
Developed and executed RCA and ORIP on plant equipment failures.
Coordinated and monitored vendor maintenance for large repairs.
Inspected equipment parts for conformance to specifications.
Performed daily inspection to ensure proactive control over Emsco continental pumps,
national pumps, caterpillar engines and generators, air and AGS compressors.
Implemented scheduled preventive and corrective maintenance on Emsco pumps, National pumps, internal combustion engines eg. Caterpillar Gas and diesel engines
Performed Fluid end Pump inspection and Power end maintenance to restore pump efficiency
Inspected and logged detailed records of received construction materials.
Conducted and approved CONTRACTOR welding qualification tests (WPQT, WPS & WQT)
Developed a comprehensive control database for Received lifting materials.
Inspected the construction and welding activities for the O.U.R. Pipeline (42” Dia X 19.1mm W.T) Project.
Inspected project sites to monitor progress and adherence to project specifications, work
procedure and safety standards.
Supervised and inspected 3rd party six monthly lifting equipment certification campaign activities.
Managed movement of all lifting equipment and CCU between sites.
Controlled lifting equipment inspection and certification database.
Conducted receiving inspection and verification of trace-ability for procured items, paints and project materials.
Developed and certified Quality management system to ISO 9001/TS 29001/ API Q1.
Reviewed test plans and procedures to ensure adequate compliance to product and system requirements.
Met project startup deadlines by proactively managing individual and team tasks.
Resolved escalated client issues in a timely manner.
Managed the entire QAQC activities of five(5) flow-line construction projects.
Managed and improved Internal Audit program.
Managed project QAQC process for TPU and ADN-A WHP Piping Fabrication; for ADDAX.
Obtained API 5CT, API 6A and API 7-1 product licenses.
Prepared and followed through on all required punch lists.
Inspected the installation of 6” subsea flow-line and at meji field (On board jascon 2 pipe-lay barge).
Reviewed project work method statement, test plans and procedures.
Inspected the installation of 24” subsea import and export pipeline at offshore Escravos (Onboard jascon 2 pipe-lay barge).
Inspected and controlled 6” & 24” offshore Pipeline Pre-commissioning activities.
Escravos Gas to Liquid Project
Inspected and controlled the preservative maintenance of staged and installed equipment.
Identified and helped resolve non-conforming product issues.
Performed preliminary, in progress and final inspection on modified equipment base and
foundation.
Created and controlled inspected piping material database.
Inspected piping spool fabrication and installation
Completed the fabrication and installation of ogoda and kolocreek valve station complex.
Completed the fabrication and installation of 24” x 121km swamp AGG pipeline (Ogbainbiri ~ ObOb).
Completed the pressure testing of all project subsystems and close-out of test packages.
Completed and handed over punch list, test packages and as- built documents.
2 years National Diploma majoring in Electrical and Electronics Engineering.