Total des années d'expérience: 13 Années, 2 Mois
septembre 2021
A À présent
Senior Electrical Engineer
à ECG
Lieu :
Egypte
• Led a team of 6 electrical engineers, orchestrating their efforts to successfully meet the project deadlines as scheduled.
• Led the management of construction contractors' activities and electrical installations.
• Monitored and reported on contractors' performance, ensuring strict adherence to project timelines and quality standards.
• Actively oversaw all testing and start-up activities to ensure contractors' compliance with approved plans and procedures.
• Evaluated and sanctioned contractor-submitted shop and as-built drawings, materials submittals, tie-in procedures, project schedules, and work permits in coordination with relevant departments.
• Orchestrated meetings between contractors and concerned departments to resolve interfacing issues during construction.
• Verified the accuracy of contractors' invoices, ensuring compliance with contractual terms.
• Administered Site Observations and formulated potential Non-Conformance Reports (NCRs) as necessary.
• Proactively addressed open Work Inspection Reports (WIR), Material Inspection Reports (MIR), and site observations, taking corrective actions promptly.
• Led the management of construction contractors' activities and electrical installations.
• Monitored and reported on contractors' performance, ensuring strict adherence to project timelines and quality standards.
• Actively oversaw all testing and start-up activities to ensure contractors' compliance with approved plans and procedures.
• Evaluated and sanctioned contractor-submitted shop and as-built drawings, materials submittals, tie-in procedures, project schedules, and work permits in coordination with relevant departments.
• Orchestrated meetings between contractors and concerned departments to resolve interfacing issues during construction.
• Verified the accuracy of contractors' invoices, ensuring compliance with contractual terms.
• Administered Site Observations and formulated potential Non-Conformance Reports (NCRs) as necessary.
• Proactively addressed open Work Inspection Reports (WIR), Material Inspection Reports (MIR), and site observations, taking corrective actions promptly.
février 2020
A septembre 2021
Allied Consultants Ltd(Egypt),
à Allied Consultants Ltd(Egypt),
Lieu :
Egypte - Le Caire
Senior Technical Office Engineer
avril 2019
A février 2020
Senior Supervision Engineer
à Khatib & Alami, Damam, Saudi Arabia;
Lieu :
Arabie Saoudite - Dammam
Duties included Supporting and supervising construction, testing, and inspection works and
materials, providing overall guidance and advice to construction teams, assist the
project manager in the compilation of project progress reports; including providing details
of implementation, details of problems encountered, solutions adopted, and detailing and
explaining any variation in costs and implementation schedules from the original estimates
for the following project :
- KAP1, Damam, Saudi Arabia. Construction supervision of the King Abdullah Bin Abdul-Aziz
materials, providing overall guidance and advice to construction teams, assist the
project manager in the compilation of project progress reports; including providing details
of implementation, details of problems encountered, solutions adopted, and detailing and
explaining any variation in costs and implementation schedules from the original estimates
for the following project :
- KAP1, Damam, Saudi Arabia. Construction supervision of the King Abdullah Bin Abdul-Aziz
juin 2016
A avril 2019
Sr.Electrical Design Engineer
à Allied Consultants Ltd; Cairo, Egypt,
Lieu :
Egypte - Le Caire
• Orchestrated comprehensive electrical design for buildings, covering small power, lighting, Low Voltage, fire alarm, sound, access control, MATV, CCTV, telephone and data, and security systems Subject to (NESC, NEC, IEC. IEEE).
• Spearheaded the design of entire electrical systems for District Cooling Plant projects, encompassing MV switchgear, RMU, MV soft-starter & VFD, transformer, and LV MDB.
• Conducted intricate technical calculations, including short circuit, load flow, harmonics study, motor starting analysis, generator sizing calculations, and lighting calculations.
• Developed tender documents for EPC contracts, providing a comprehensive framework for project execution.
• Performed detailed engineering computations, material quantity takeoffs, and estimates for accurate project planning and budgeting.
• Guided CAD Designers and lower-level Engineers within the project team, providing technical expertise.
• Spearheaded the design of entire electrical systems for District Cooling Plant projects, encompassing MV switchgear, RMU, MV soft-starter & VFD, transformer, and LV MDB.
• Conducted intricate technical calculations, including short circuit, load flow, harmonics study, motor starting analysis, generator sizing calculations, and lighting calculations.
• Developed tender documents for EPC contracts, providing a comprehensive framework for project execution.
• Performed detailed engineering computations, material quantity takeoffs, and estimates for accurate project planning and budgeting.
• Guided CAD Designers and lower-level Engineers within the project team, providing technical expertise.
avril 2015
A juin 2016
Electrical Technical Office Engineer.
à BTC
Lieu :
Arabie Saoudite - La Mecque
Duties included participating in implementing technical office policies and procedures,
Studying the project contract documents (time schedule, project design drawings, BOQ,
etc.), Update the shop drawing log before sending the shop drawing to the consultant
for approvals, Studying and preparing requests for information (RFIs) for all missing,
unclear, conflicting or other technical matters that may arise during construction for all low
current system for the following projects:
Third Saudi Expansion of Holy Haram, Makkah, Saudi Arabia. Phase 3 involved five major
projects including the extension of the mosque’s main building, in addition to
constructing an arena, a pedestrian tunnel
Makkah First Ring Road, Makkah, Saudi Arabia, installation of closed circuit TV(CCTV)
system and coordination between the other low current system.
Studying the project contract documents (time schedule, project design drawings, BOQ,
etc.), Update the shop drawing log before sending the shop drawing to the consultant
for approvals, Studying and preparing requests for information (RFIs) for all missing,
unclear, conflicting or other technical matters that may arise during construction for all low
current system for the following projects:
Third Saudi Expansion of Holy Haram, Makkah, Saudi Arabia. Phase 3 involved five major
projects including the extension of the mosque’s main building, in addition to
constructing an arena, a pedestrian tunnel
Makkah First Ring Road, Makkah, Saudi Arabia, installation of closed circuit TV(CCTV)
system and coordination between the other low current system.
janvier 2011
A avril 2015
Electrical Design Engineer
à Allied Consultants Ltd; Cairo, Egypt
Lieu :
Egypte - Le Caire
Partager sur Facebook
Partager sur Twitter
Partager via Email