Osama Moftah, Senior Project Manager 	-        460M

Osama Moftah

Senior Project Manager - 460M

DEPA Saudi Arabia, (Shura 7-Stars Resort_Design/Build Contract)

Location
Saudi Arabia - Riyadh
Education
Master's degree, M.Sc. Construction Managmenet
Experience
27 years, 5 Months

Share My Profile

Block User


Work Experience

Total years of experience :27 years, 5 Months

Senior Project Manager - 460M at DEPA Saudi Arabia, (Shura 7-Stars Resort_Design/Build Contract)
  • Saudi Arabia - Umm Lajj
  • November 2022 to April 2024

Senior Project Manager S A R 460M., Nov 2022-April 2024
DEPA Saudi Arabia, (Shura 7-Stars Resort_Design/Build Contract)

Depa Group is a Main Contractor that comprises three key business units and investments, which span various sectors of the ICI & infrastructure construction market, The Group delivers hospitality, commercial (offices and retail), social infrastructure, economic infrastructure, yachts and marine, high-rise and low-rise residential, and aircraft projects in selected countries in the Middle East and North Africa, Europe, Asia, and North America:

• Planned and executed luxury prefabricated seven stars villa units (1, 2 & 3 BRs), including high-end finishes, design coordination/construction execution, and transferring to KSA.
• Coordinated and delivered the Design Development & execution of (73) high-end keys Villa with assigned Studio Paolo Ferrari “SPF” Canadian Designer to complete the process of design change of the project.
• Managed the coordination and execution of Project Public & Back of House buildings/areas including landscaping and site facilities in the construction management form.
• Delivered infrastructure project of watermain and sewer lines of U/G Services of 7 stars resort.

Project Director - EGP 507M at H. A. Construction, Cairo, Egypt, (JUTON Factory_EPC Contract)
  • Egypt - Cairo
  • October 2020 to October 2022

Project Director E G P 507M., Oct 2020-Oct 2022
H. A. Construction, Cairo, Egypt, (JUTON Factory_EPC Contract)

Hassan Allam Construction is a national privately owned Engineering & Construction Company operated on a standalone basis with a focus on large scale projects, building material, electrical and mechanical turnkey solutions:

• Lead large Project Team to finalize project Engineering scope mitigating subsequent delays in 60 days against 90 planned days.
• Directed procurement to achieve planned targets of EGP 280M. long lead Electrical & Mechanical equipment required for the JOTUN Plant.
• Managed and handled fast track construction activities and accomplished delays recovery of 28.75% progress in 82 days against 8% in 6 months with 1.1 SPI.
• Managed to establish a project extension adding 112 days to project Baseline schedule with achievable targets to avoid Contractual LDs of 1.1%/day.
• Managed value-engineering to save 3% of Project Value saving 78 days of execution duration.

Senior Project Manager - CAD $140M at Leeswood Design Build Ltd., Toronto, ON, Canada, (Dymond& DSV_Design/Build)
  • Canada - Toronto
  • April 2019 to August 2020

Senior Project Manager C A D $140M, April 2019-Aug 2020
Leeswood Design Build Ltd., Toronto, ON, Canada, (Dymond& DSV_Design/Build)

Leeswood Design Build Ltd. is a design & build construction Leader Firm, providing first class services, building high quality facilities, and delivering successful projects ahead of time and within budget:

• Leading a professional project design/build Team delivering a 1, 000, 000 ft2 an international storage facility within an extreme short duration.
• Providing a first-class project management delivering 17% project progress ahead of schedule.
• Managing projects budget achieving 7% budget saving and cutting back design duration.

Project Manager - CAD $120M at EllisDon Corporation, Toronto, ON, Canada, (Design/Build & Finance Contract)
  • Canada - Toronto
  • April 2018 to March 2019

Project Manager C A D $120M, April 2018 - March 2019
EllisDon Corporation, Toronto, ON, Canada, (Design/Build & Finance Contract)

EllisDon Corporation is an international North America Construction Leader with innovative portfolios of construction/consultancy management strategies. With 18 worldwide & domestic branches and operation centres; EllisDon sets out the principals and level of quality among proponents:

• Coordinated and facilitated precast six levels parking precast structure execution at a capacity of (100, 000 ft2) starting with conceptual design development to IFC & permit acquiring stage.
• Managed project budget of main packages including structural steel, prefabricated crossing over bridge, underground tunnelling structure, and LRT station structure, with associated high end exterior and interior finishes.
• Lead the execution of site layout to hit targeted budget with 5.64% cost savings bringing progress ahead of planned targets.
• Coordinating with Project Stakeholders to facilitate design development and execution of proposed Station and Pavilion buildings along with Rail Platform.

Senior Project Manager - US $306M at Senior Project Manager U S $306M, Jan 2016 - March 2018 Kharafi National (KN), Kuwait, (JGSK_Clean
  • Kuwait - Al Ahmadi
  • January 2016 to March 2018

Senior Project Manager U S $306M, Jan 2016 - March 2018
Kharafi National (KN), Kuwait, (JGSK_Clean Fuels Project_CFP)

A leading infrastructure Projects Main Contractor with enhanced oil services and contracting management service provider for mega petrochemical, infrastructural of power, water, highways, and commercial Projects in the Middle East:

• Managed project resources resulting in 300% progress advancement with 9.25% budget savings.
• Lead the progress of 16KM steel pipeline of main pipe rack structural steel crossing brown & green fields of refinery complex.
• Managed Changes of original scope and achieved 15%+ budget increase of original contract.
• Supervised, managed and motivated a Huge Team of 300+ of Non-manual and 4000 Manual onsite.
• Develop project budget and schedule, control expenditures, material procurement within approved Client authorization in accordance with applicable by-laws, including project financial applications.

Assistant Project Manager - CAD $140M at EllisDon Corporation, Toronto, ON, Canada, (Square One Mall – Design/Build Contract)
  • Canada - Toronto
  • September 2012 to December 2015

Assistant Project Manager C A D $140M, June 2012 - Dec 2015
EllisDon Corporation, Toronto, ON, Canada, (Square One Mall - Design/Build Contract)

EllisDon Corporation is an international North America Construction Leader with innovative portfolios of construction/consultancy management strategies. With 18 worldwide & domestic branches and operation centres; EllisDon sets out the principals and level of quality among proponents:

• Coordinated the development of Project design stages starting from schematic/conceptual design to IFC stage, incorporating Client and/or Municipalities requirements considering Building Codes and North America climate constrains.
• Directed Project Team in the delivery of structural packages 8.56% progress rate ahead of schedule achieving 3.86% cost savings on Project CPI report.
• Successfully hired project Subcontractors and delivered project tender packages with $16.8M. under budget to facilitate finishes early starting.
• Managed the execution of Project Infrastructure scope consisting of watermain lines, sewage lines.
• Performed construction management activities and delivered the Project 13% ahead of schedule.
• Lead the coordination and execution of procurement and high end interior finishes starting BIM modeling to IFC.
• Conducting and performing Quality audits and fields inspections with project Third parties.
• Coordinated and negotiated changes as per existing site conditions, and profitably increased company earnings by 3.35% of total project budget.

Sr. Construction Manager - U S $481M at Mohamed Abdelmohsen Kharafi (MAK), Kuwait, (J.A Housing Project_1271 villas, P. Buildings & Infrastr
  • Kuwait - Joint Operations Wafra
  • January 2011 to May 2012

Sr. Construction Manager U S $481M, Jan 2011 - May 2012
Mohamed Abdelmohsen Kharafi (MAK), Kuwait, (J.A Housing Project_1271 villas, P. Buildings & Infrastructure scope)

A private Kuwaiti based group with diverse interest and activities worldwide branches in Africa, Middle East, Albania, Brazil, Bulgaria, Indonesia, Kazakhstan, Maldives, and Netherlands with 100, 000 Employees for 2008:

• Successfully delivered $54 million multi-functional Public Buildings of the project for Government Authority starting with design coordination, preconstruction, civil structure and interior finishes.
• Managed and delivered infrastructure Project scope, with associated sewage lines, watermain lines with diameter ranges from ø300-1800mm with associated manholes and chambers.
• Developed, in association with Design department, exclusive work procedures, in accordance with project specification, that abbreviated execution durations while maintaining quality level with 1.35% savings on total project indirect costs.
• Maintained and supervised a large Team of Staff to deliver private villa units of residential type incorporating U/G services and interior/exterior finishes.
• Supervised several Subcontractors and managed scope description to make sure that there is no scope gaps of assigned Subcontractors.

Construction Manager - U S $375M at Kharafi National (KN), Kuwait, Downstream Petrochemical Division (EG2, Aromatics & BS160)
  • Kuwait - Al Ahmadi
  • September 2006 to December 2010

Construction Manager U S $375M, Sep 2006 - Dec 2010
Kharafi National (KN), Kuwait, Downstream Petrochemical Division (EG2, Aromatics & BS160)

A leading infrastructure Projects Main Contractor with enhanced oil services and contracting management service provider for mega petrochemical, infrastructural of power, water, highways, and commercial Projects in the Middle East:

• Managed, supervised and delivered fast track heavy structures concrete/earthwork activities complying with international project quality standards and top Quality & Safety plans.
• Participated in value engineering process to develop execution procedure of which resulted into 2.5% saving on budget and project schedule.
• Performed regular field inspections, provided supervision and technical support to ensure smooth performance of construction and installation of material and equipment.
• Provided analytical feedback of quality of execution and proposed corrective actions to prevent time loss of project schedule.
• Established and prepared project requirements, procurement and planning for petrochemical plant and obtained necessary input to perform civil design.
• Managed, performed and supervised execution of largest nuclear reactor in Middle East with capacity of 1750 tons and related processing structures.
• Conducted and coordinated quality audits and inspection with project Client on regular basis to ensure deliveries on time and in accordance to quality requirements.
• Prepared and maintained inspection reports/records and applied computer quality database tracking with project stakeholders.
• Prepared technical document composing to facilitate equipment inspection and installation.
• Conducted quality assurance and installation procedures sessions to site supervisors to reduce and mitigate non-conformances with required corrective applications.

Sr. Project Engineer - U S $375M at Mohamed Abdelmohsen Kharafi (MAK), Kuwait, (J.A International Stadium & Associated Infrastructure)
  • Kuwait - Al Farawaniyah
  • January 2003 to August 2006

Sr. Project Engineer U S $375M, January 2003 - Aug 2006
Mohamed Abdelmohsen Kharafi (MAK), Kuwait, (J.A International Stadium & Associated Infrastructure)

A private Kuwaiti based group with diverse interest and activities worldwide branches in Africa, Middle East, Albania, Brazil, Bulgaria, Indonesia, Kazakhstan, Maldives and Netherlands with 100, 000 Employees for 2008:

• Lead the execution of Heavy Civil structure of an International Stadium of 55000 Guests.
• Delivered the execution of VIP & Media Zones, including and not limited to, high end interior & exterior finishes, with associated services and media equipment.
• Coordinated the fabrication and installation of precast seating structures per Project QMP and heavy lifting HSE Safety Procedures.
• Planned and supervised the execution of incorporated infrastructure of the Stadium, including sewage lines, watermain lines, with associated manholes and valve chambers.
• Accomplished scheduled target and delivered concrete activities ahead of schedule to enable the start of interior finishes.

Project Site Engineer - U S $460M at The Arab Contractors & Co., Egypt, Heavy Civil/ICI Construction (Railway Bridges, ICI Buildings & Ma
  • Egypt - Alexandria
  • August 1996 to December 2002

Project Site Engineer U S $460M, Aug 1996 - Dec 2002
The Arab Contractors & Co., Egypt, Heavy Civil/ICI Construction (Railway Bridges, ICI Buildings & Main Infrastructural Projects)

The Arab Contractors is a leading construction companies in the Middle East, Europe and Africa. It provides multi-construction services for Roads & Infrastructure, Heavy Civil, ICI, Interior Finishes, and Joinery Projects, including and not limited to, Bid/Build, Design Build & Construction Management Services, with over 77, 000 Employees at 29 Countries worldwide:

• Generated Project Management Plan (QMP) in compliance with ISO 9001 for Roads, Infrastructure, and Heavy Civil Projects, including interior finishes and joinery items.
• Executed LRT Bridges for 22.5KM of Railway Project ahead of schedule, including value engineering of critical items,
• Coordinated and established execution procedures of four (4) lifting station with associated watermain line including control valve chambers.
• Coordinated with Governmental Authorities to obtain required Municipalities Permits.
• Planned construction schedules, with correlated procurement, recruiting and critical path deliverables.
• Reviewed and developed design and shop drawings from conceptual design stage to IFC.
• Participated and associated with quality management committee in monitoring, auditing and inspection events.
• Increased cost-plus profit 12% by estimating different disciplines and items related to materials and manpower methodologies to meet project management policies construction deliveries.

Education

Master's degree, M.Sc. Construction Managmenet
  • at George Brown College, Toronto, ON, Canada
  • December 2013
Master's degree, M.Sc. Civil Engineering Software Applications
  • at Humber College, Toronto, ON, Canada
  • December 2012
Bachelor's degree, B.Sc. Architectural Engineering
  • at Alexandria University, Alexandria, Egypt
  • August 1995

Specialties & Skills

Schedule Planning
Construction Design
Construction Safety
Bridge Construction
Construction Management
MANAGEMENT
CONSTRUCTION
INFRASTRUCTURE
PROJECT MANAGEMENT
AUDITING
BRIDGES
CONSTRUCTION MANAGEMENT
COORDINATING
ENHANCED OIL RECOVERY (EOR)
INSTALLATION

Languages

English
Expert
Arabic
Native Speaker