Bms Engineer
Schneider Electric ksa
Total years of experience :13 years, 9 Months
• Worked as Mechanical Engineer with Experience of Ten years. I excel in effective communication. I am efficient in decision-making due to my exceptional attention to detail and organization.
• I am independent and also work great within a multi-disciplinary team with my excellent interpersonal skills. I manage my time effectively.
• I have great Automation and industrial assessment skills and a strong problem-solving aptitude.
• I have excellent knowledge of documentation and Report management system development.
• I have experience and knowledge of Microsoft SQL- server management studio, Word and Excel & PowerPoint. I have great and hand on experience in 2 & 3 Dimensional SCADA developing, Design mimics, design 3D layout of machinery and equipment’s.
Industrial/manufacturing facility.
• Worked as an HVAC control system, Chiller and water treatment plant.
• Water system maintaining for PH, WFI & PW -water tanks to facilitate the
formulation.
• Installation and configuration of Sequence Modbus and RTU process.
• Maintain Air handling units Check list like -
• Check the unit for noise and vibration.
• Lubricate and grease motor and blower bearing.
• Straighten coils with affine comb.
• Check that the motor belt and pulley are working properly.
• Inspect wiring for damage or loose connections.
• Check the unit's bypass valve.
• Worked SCADA Iconic Genesis 64 3D & 2D configuration and installation.
• Worked on Workbench for any industrial factory layouts.
• Hands on experience on Generating Reports through Report Worx, Hyper
historian, SQL data base.
• Mobile HMI is an Application for Android and iPhone to publish any CCTV
camera live in Mobile when during activity.
• Genesis 64 - (Iconic) SCADA MIMICS screen publishing any displays with
controlling and real time through client’s systems.
• Documentary for Batch process and Production Activity to perform for Audits
Trails.
• Audits documentary for all batch records to be maintained.
• For new Machinery to implement must be first document for IQ, DQ, PQ and its
P&-Id’s.
• Highly qualified for HVAC system to maintain the environment in the production.
facilities.
CERTIFICATES & LICENSES
PROGRAMMABLE LOGIC CONTROL
(SR AUTOMATION) -
Mechanical engineering
information Technology