Work Experience

Total years of experience :17 years, 11 Months

Lead Estimation Engineer at AYTB
  • Saudi Arabia - Jubail
  • My current job since January 2012

Receive/read RFQ documents (Mechanical, piping, structural steel, structural concrete and civil) prior to estimation. Understanding all scope of works, drawings, specifications and relevant client’s inquiry requirements.
Attending job explanation meeting, site inspection/site visit and pre-bid clarification meeting before preceding the estimate.
Preparation of queries to clients for the clarity of scope and responsibility.
Prepare materials take-off (Mechanical, piping, structural steel, structural concrete and civil) from supplied drawings, either from AutoCAD, isometrics and plans (if not provided by client).
Identify and raised RFQ for the materials and 3rd party services required for pricing.
Calculate direct man-hours in each every line item of activity based on standard norms/productivity.
Prepare direct mobilization plan (Craft wise) based on client provided project schedule or milestone.
Prepare indirect mobilization plan based on loaded direct manpower and project requirements (Management, Planning & cost control, Supervision, Safety, Quality, Material Control & etc.).
Prepare equipment mobilization plan based on direct & indirect loaded manpower, work activities, study, calculate & identify required lifting/transportation equipment’s based on the weight & items to be erected.
Calculate the quantity of consumables and site facilities required based on the project requirements and resources.
Study, identify and calculate the testing requirements of the projects.
Preparing & run cost estimate/analysis base on computed direct & indirect man-hours, equipment, consumables, site facilities, materials and 3rd party services required for the projects.
Coordinate with the construction, safety and quality team for any special requirements on the projects to apply on the estimate.
Prepare the basis of estimate, prepare risk register, identify the risk probability (High/Medium/Low), study & identify mitigation plan to eliminate or reduce risk probability and identify again the risk probability after mitigation.
Re-run the estimate after applying the mitigation on the risk register of the project.
Guide, monitor and review the work estimates of Eight (8) Estimation Engineers.
Report, discuss and interface to Estimation Manager.
Present and discussed the project & estimate to General Manager and Vice President for their review and comments.
Apply on the estimate all the comments during review.
Preparing the commercial letter proposal, scope of works, clarifications/deviation if any and price breakdown based on client requirement.
Answering post bid clarification from client’s technical & commercial clarification.
Reviewing the contract and the rates before signing of the contract.
Handover the project to construction, safety and quality team by providing project overview, quantum of work, manpower & equipment requirements, scope of works/supply that are included & excluded in the price, critical scope & other project information.
Preparing and making cost analysis for big change orders.

Estimating Engineer at Qanbar Dywidag Precast/Prestressed Company, LTD
  • United Arab Emirates
  • May 2009 to November 2011

Reading the construction packages, specification and drawings prior to start the work.
Read and analyzed RFQ documents, drawings, specifications and scope of works from the clients provided documents.
Attending site inspection, job explanation and clarification meeting.
Making quantity take-off of precast/prestressed concrete elements from the supplied drawings.
Estimates materials to be used, transportation, and erection.
Making cost analysis, including pricing & making Quotations of Qanbar Dywidag Precast/Prestressed Concrete Products.
Checking the contract plans and specifications if it is correctly followed & implemented to the project, checking actual measurements, quantities at project site, monitor project progress and making progress billing.

PROJECTS HANDLED

Site Engineer at Civil & Structure
  • Philippines
  • January 2009 to May 2009

Reading and understanding the construction drawings & specifications.
Making quantity take off for the materials to be used in the project.
Analyzing the schedule & preparing the strategy before executing the work.
Supervising, assisting and monitoring the works of skilled workers.
Checking the drawings & specification if correctly implemented.
Coordinating with the clients & QA/QC personnel for inspection.
Compliance with safety and quality procedures.

PROJECTS HANDLED:
DPWH (Department of Public Works & Highways) - Government Projects
Like: Drainage System, Civil Works, Steel Structure and concreting works.

Site Engineer Civil at Allied Trade Resources MPC
  • Philippines
  • June 2006 to December 2008
Owner at SADARA / SAUDI ARAMCO
  • Saudi Arabia
  • January 2008 to
Owner at SADARA Chemical Company
  • Saudi Arabia
  • to

Brief Scope of Work: Scope consists of civil, structural steel / concrete, piping fabrication & erection approximately 274Kilometers of pipe consist of 17 lines, electrical, instrumentation, painting & insulation.

Project Name : Rabigh Ethane Cracker Furnace Expansion (3Nos)
: Contract No. 3000385850
Client

Owner at SAUDI ARAMCO / SUMITOMO CHEMICAL
  • Saudi Arabia
  • to

Brief Scope of Work: Scope consists of civil, structural steel / concrete, piping fabrication & erection, electrical, instrumentation, painting & insulation.

Project Name : Piping Spool Fabrication SADARA Mixed Feed Cracker Project
: Contract No. 100532-SITEMR-ME-20130619
: QTY 164, 277 Dia-Inch
Client

Owner at SATORP (SAUDI ARAMCO TOTAL Refining Petrochemical Co
  • Saudi Arabia
  • to
Project at SAMREF (SAUDI ARAMCO MOBIL Refinery)
  • to

Mechanical & Projects Works (MECH:T1 & T3) during 2013 Turnaround.
: Contract No. 102104998, 10214644
Client

Owner at SAUDI ARAMCO (SAMREF)
  • Saudi Arabia
  • to
Project at SABIC SHARQ
  • to

Complete 8 Nos. Furnace Re-tubing
Client

Owner at SABIC SHARQ
  • Saudi Arabia
  • to
Project at Saudi Chevron
  • India
  • to
Owner at Saudi Chevron
  • Saudi Arabia
  • to
Project
  • to

TASNEE SHUTDOWN for PP and LDPE area
Client : TASNEE

Owner at TASNEE
  • Saudi Arabia
  • to
Export at SAUDI ARAMCO Projects (Oil and Gas) Al-Jubail
  • Saudi Arabia
  • to
Operator at Daryn Construction
  • United Arab Emirates
  • to
Quantity Surveyor
  • to

Reading the construction packages, specification and drawings prior to start the work.
Analyzing the construction schedule and preparing the sequence of work before starting.
Checking and preparation the quantity of manpower & materials needed for the construction as per the work schedule to ensure the smoothness of the work and to avoid any delay on the project schedule.
Coordinating with subcontractors and planning how to execute their works without affecting the other works.
Assigning qualified personnel for the availability of permit to work (PTW).
Supervise, monitoring and assisting the works of skilled workers including the sub contractor’s in their daily activities if it is correctly implemented the construction drawings & specifications.
Coordinating with the other subcontractor’s during execution period to avoid the miss understanding of each team.
Coordinating with clients & QA/QC inspection team.
Walk through and inspect installed components as per approved construction drawings, prepare punch list activities and accomplishing / correct the same.
Liaise the final acceptance of finished work to client/owner.
Company Health, Safety & Environment and quality policy and procedures are covered to client satisfaction.

PROJECTS HANDLED:

3-Storey NEDA Building & Land Development.
Renovation of 4-Storey DBP Building

Project at Worley Parsons, Technip, SAMSUNG C & T, DAELIM, SK Engineering, CBI Lummus, Hyundai and Toyo Engineering
  • to

Receive/read RFQ documents (Mechanical, piping, structural steel, structural concrete and civil) prior to estimation. Understanding all specifications and relevant client’s inquiry requirements.
After reading and analyzing the RFQ documents, I will distribute the RFQ document to Estimators.
Attending site inspection/site visit before proceeding the estimate, in order to see the site situation.
Attending job explanation & clarification meeting with the client like Petrochemical and Oil & Gas Companies (SAUDI ARAMCO, SAMREF, SATORP and all SABIC affiliates) and EPC Contractors (JGC, Tecnimont Arabia

Engr at Estelito Manalo
  • to
Mechanical Engineer at AYTB (Al
  • Saudi Arabia
  • to

Co.

at Arch. Wendell M. Burgos Architech AYTB (Al
  • Saudi Arabia
  • to

Co.

Education

Bachelor's degree, Civil Engineering
  • at University of Mindanao
  • October 2006

..

Specialties & Skills

Cost Estimation
Cost Estimating
CUSTOMER RELATIONS
ENGINEERING
GOVERNMENT
MATERIALS MANAGEMENT
MICROSOFT WORKS
PERSONNEL
QUALITY
QUALITY CONTROL

Languages

English
Expert