palani ganesan, PMC

palani ganesan

PMC

Technip

Location
India - Chennai
Education
Bachelor's degree, Mechanical
Experience
70 years, 2 Months

Share My Profile

Block User


Work Experience

Total years of experience :70 years, 2 Months

PMC at Technip
  • India
  • February 2016 to September 2020

Mech for ADNOC Offshore, DAS ISLAND.

at PENSPEN INTERNATIONAL LTD Das Island
  • India
  • February 2016 to September 2020

Technip FMC, a leading Project Management Consultancy
Designation : PMC mech/Piping-Construction
(Das Island Abu Dhabi for various Brown field and Green field projects of ADNOC
Offshore.)
Projects handled
a) Nasr Full Field Project (NFFD) Package 3- A brown field project to expand crude oil processing capacity of the
Umm shaif plant to handle the oil produced at Nasr field.
b) P Das Project - Power transmission at 132KV from P-DAS substation to Nasr field
c) 4GTG Project - A green field project to generate 132MW power to meet load requirement at Nasr Field
d) Successfully completed Bu Haseer project Early Production Scheme (EPS) - a brown field project to
expand the facilities to meet the crude oil produced at Bu Haseer field
Nature of Duties :
• Daily site visits to ensure that the Contractors are following the approved drawings, applicable standards
and specifications, method statements and ITPs
• Carrying out inspections at various stages of the execution of the projects
• Review and preparation of comments on Engineering Documents, Drawings, Specifications, Material inspection
reports
• Review and approval of Method Statements and ITPs submitted by the Contractor
• Progress monitoring and expediting
• Participating in Weekly and monthly meetings with client and contractors.
• Constant liaisioning with Client for shut down of existing piping and Equipment facilities to carryout modifications
and extensions necessary
• Construction supervision of piping, equipment and pumps, equipment internal works etc

Senior Manager at ENGINEERS INDIA LTD
  • India
  • May 1995 to April 2013

for Petro chemical fluidized catalytic cracking (PFCC) unit, PFCC, with design capacity of 2.2 million TPA it can produce
about 20% of its product as polymer-grade propylene, apart from almost 25% of product as LPG. MRPL at Mangalore (India)
Monitored the overall PFCC Unit mechanical activities, construction management, coordination with client and
contractor, contract handling, Conducting Job safety Analyses (TRA) and ensuring the Works are executed as per
approved design and standard, conducting periodic audit etc

Manager
  • July 2008 to May 2009

Project Management consultancy for CDU/VDU Refinery project Bharat Oman Refinery Project,
Bina, INDIA.Joint venture of Bharat petroleum corporation and Oman refinery with design capacity of 6 MTPA.
As

Manager at Cross Country
  • December 2007 to July 2008

Project Management consultancy for Vadinar Bina Pipe Line Project Crude Oil

Manager
  • May 2006 to December 2007

Project Management consultancy for Mundra Delhi Product pipeline Project, M/s Bharat Petroleum Corporation
Ltd, India. The pipeline constructed by BPCL to transport petroleum products from Mundra Gujarat to Delhi region
As

Manager at Indian Oil Corporation Ltd
  • India
  • December 2004 to April 2006

EPC for Paraxylene (PX), Refinery Expansion Project for

Deputy Manager at CDU
  • March 2003 to December 2004
Deputy Manager
  • August 2002 to February 2003

Project Management and Construction Supervision of LPG Revamp/ Natural gas to gas and gasoline project, Vagodia

Senior Engineer at GAIL (India) Ltd
  • India
  • February 2000 to August 2002

Project Management consultancy for Jamnagar Loni LPG Pipeline Project,

Engineer
  • October 1998 to January 2000

Project Management consultancy for DHDS Project, Madras Refinery, Chennai, India. Diesel Hydro
Desulfurization (DHDS) unit built by CPCL for meeting Diesel quality and to reduce the Sulphur content in diesel.
As

Engineer at GAIL (India) Ltd
  • India
  • May 1995 to September 1998

Project Management consultancy for LPG Recovery Project - Lakwa, Assam, India,

Production Engineer at Madras Coaches
  • India
  • June 1994 to April 1995
Production Engineer at M/s. MADRAS COACHES
  • India
  • June 1994 to April 1995

Body construction of Auto Mobile and earth moving equipment.
Responsible for production of unit, production monitoring, production planning, Supervision of sub-contractors works.
Processing of vendor, sub-contractor bills, manpower planning

Production engineer at Siva engineering works
  • India
  • June 1993 to June 1994
Production Engineer
  • June 1993 to June 1994

M/s. Siva Engineering Works Salem, Tamilnadu, India Manufacturer of pumps.
Responsible for production of unit, Processing of vendor, sub-contractor bills, manpower planning

Area Manager at KOR Chemicals Paramakudi
  • India
  • May 1992 to May 1993

Key Result Areas:
Project Management
• Developing project baselines; monitoring & controlling projects with respect to cost, resource deployment, time over-runs
and quality compliance to ensure satisfactory execution of projects
• Organizing project review meetings for evaluating project progress & de-bottlenecking
Construction Management

Maintenance Engineer
  • May 1992 to May 1993

M/s. KOR Chemicals Para makudi, , Tamil Nadu, India
Maintenance of pumps, conveyors and earth moving equipment

Education

Bachelor's degree, Mechanical
  • at Govt. College of Technology, Bharathiar University
  • January 1992

first division

Specialties & Skills

Construction & Property
CUSTOMER RELATIONS
MATERIALS MANAGEMENT
MECHANICAL
MEETING FACILITATION
MICROSOFT WORKS
OIL PAINTING
PROGRESS
PROJECT MANAGEMENT
QUALITY CONTROL

Languages

English
Expert
Hindi
Expert

Hobbies

  • Trekking,travelling