Provided HSE leadership for refurbishment, maintenance enhancement, and live operational upgrades at Doha South Sewage Treatment Works (DS STW), involving critical wastewater treatment assets, MEICA systems, SCADA integration, and civil infrastructure.Worked extensively in live plant environments while ensuring uninterrupted STW operations during refurbishment and commissioning activities.
Oversaw HSE compliance during installation, replacement, testing, and commissioning activities involving:
● Ultrafiltration (UF) pneumatic systems and compressed air network upgrades
● Replacement of PVC compressed air pipelines with SS316L piping systems
● H2SO4 dosing line replacement using ECTFE chemical-resistant piping systems
● PLC, HMI, SCADA, UPS, and centralised automation integration works
● MVDB panels, MCC upgrades, automatic transfer switches, ACB replacements, and FM200 suppression systems
● Centralised fire alarm and fire detection integration across treatment facilities
● Turbidity, TDS, and process instrumentation integration with central SCADA
● Motorised rolling shutters, MOV systems, PRVs, tanker filling stations, and pumping station upgrades
● Temperature-controlled emergency eyewash and safety shower cooling systems
● Replacement and commissioning of obsolete PLC/SCADA systems across multiple treatment areas
● Installation of electrical, instrumentation, and communication cabling with associated trenching and civil works
● Automatic coarse and fine screen replacement with PLC, HMI, and instrumentation integration
● Compact pre-treatment unit (CPT) refurbishment and SCADA-linked automation works
● Reinstatement of wash-water systems and HDPE piping networks
● Odour Control Unit (OCU) upgrades, including VFDs, pH analysers, and H2S sensors
● pH correction and chemical dosing system replacement
● Multimedia filter rehabilitation and aeration diffuser replacement works
● Drum thickener, sludge decanter, sludge transfer pump, and wash-water pump refurbishment
● Diesel generator replacement, synchronisation, load testing, and automation works
● Fire water pumping system reinstatement and civil defence compliance activities
● PLC/SCADA system reinstatement, including controls, communication, programming, and automation integration
Project activities involved confined spaces, live treatment systems, sludge handling, chemical systems, rotating equipment, lifting operations, electrical isolation, and commissioning works.
Key Responsibilities & Achievements
● Maintained HSE compliance during high-risk MEICA and live plant operations
● Controlled high-risk activities, including confined space entry, hot works, lifting operations, energised electrical work, and chemical handling
● Coordinated PTW activities with operations, maintenance, contractors, and client representatives
● Supported safe execution of SCADA-integrated utility upgrades without major operational interruption
● Conducted risk assessments, toolbox talks, inspections, and incident prevention campaigns
● Ensured compliance with Ashghal, Kahramaa, and Qatar Civil Defence safety requirements
● Monitored contractor safety performance during simultaneous civil, mechanical, electrical, and instrumentation activities
● Ensured safe execution of treatment plant maintenance and refurbishment works in operational plant conditions
● Monitored HSE compliance during sludge system rehabilitation, confined space activities, and mechanical overhauling
● Controlled risks associated with chemical dosing systems, wastewater exposure, and energised systems
● Coordinated lifting operations, shutdown activities, lockout/tagout procedures, and commissioning works
● Conducted routine HSE inspections, audits, and permit monitoring activities
● Supported compliance with Ashghal safety standards and project-specific HSE procedures
- Company industry:
- Water & Waste Water Treatment
- Job role:
-
Safety