Total Years of Experience: 55 Years, 8 Months
July 2019
To Present
Post Contract Senior QS
1. Wasl Gate Phase IV -2 Towers - MU1(G+P1+P1+L1to L12) & MU2(G+P1+P1+L1 to L11) with one podium - Residential & Commercial Tower @ Jabal Ali - AL Wasl Properties AED 220 million 2. Tiara Hotel Project at Palm Dubai - Al Wasl Properties AED - 800 million
May 2013
To Present
Senior Quantity Surveyor
at M/s. Engineering Consortium Consulting Engineers. (ECCE)
January 2000
To December 2022
Senior Quantity Surveyor/Estimator/Project Engineer
at M/s Al Turath Al Arabi Cont. LLC.
Major Projects:
•B+G+11 building at Al Qusais - AED 35 million
•16 nos. G+1 villas at Umm suqem - AED 24 million.
•G+4 Residential/Commercial Buildings at Port Saeed, Al Baraha, Souq Al Kabber Dubai.
•G+1 Villas, Ware houses and Labour camps in Dubai.
•Annual Maintenance works for Middle East Lubricants -Jabel Ali, Dubai.
•Construction of Air filter foundation and relocation of foundations at DUBAL.
•Construction of Storage tank foundation, Tank bund Wall, Pipeline foundations, Control Panel room and Drum storage rack foundation, Main parking yard and office car parking area for Middle East Lubricants JAFZA, Dubai.
•B+G+11 building at Al Qusais - AED 35 million
•16 nos. G+1 villas at Umm suqem - AED 24 million.
•G+4 Residential/Commercial Buildings at Port Saeed, Al Baraha, Souq Al Kabber Dubai.
•G+1 Villas, Ware houses and Labour camps in Dubai.
•Annual Maintenance works for Middle East Lubricants -Jabel Ali, Dubai.
•Construction of Air filter foundation and relocation of foundations at DUBAL.
•Construction of Storage tank foundation, Tank bund Wall, Pipeline foundations, Control Panel room and Drum storage rack foundation, Main parking yard and office car parking area for Middle East Lubricants JAFZA, Dubai.
May 2013
To June 2019
Pre Contract Senior QS
Major Projects: 1. Ras Al Khor -Phase 1- 12 Nos. B+G+4 buildings- Residential and commercial - Al Wasl properties - AED - 500 million 2. The Ghalia & Vantage @ Jumeirah Village Community, Dubai. (DAMAC projects) Residential, Commercial Towers, G+38+Roof, G+28+Roof, Podium 4 levels, Ground car park and 4 levels of partial car park, Retail shop front at Ground floor, Multipurpose Gym, swimming pools, landscaping etc. Ghalia - G+38+Roof - AED 200 million Vantage - G +28+Roof - AED 175 million 3. Akoya Artesia - 4 Nos. G+28 floors towers with podium @ Dubai land, Dubai (DAMAC project) Residential, Commercial 4 Nos. Towers, G+28+Roof, with one Podium 4 levels, Ground car park and 4 levels of partial car park, Retail shop front at Ground floor, Multipurpose Gym, swimming pools, landscaping etc. Akoya Artesia - AED 700 million 4. 33 Nos G+1 Villas @ Jumeirah Golf Estate, Dubai. --AED 68 million 5. Emirates Canadian University @ UAQ (TATWEER GROUP) --AED 100 million 6. Immigration Detention block and Service Block Buildings @ Al Rowaiyah 3rd, Dubai for Dubai Police, Department of Punitive and correctional Institutions. -- AED 25 million
December 2010
To April 2013
Civil Engineer
at M/s. Holford Associates Consultants.
Projects: 1. BRIGHT START BEACH RESORT @ Jumeirah, Dubai. - AED 360 million A Basement+G+7 building (61000 m2 built up area) comprises of a Hotel five (5) star rating (with an international operator) and ancillary buildings. The Hotel consists of all in-house facilities like restaurants, bar/lounge, FOH & BOH areas, MEP areas, pool restaurant, fully landscaped to include external swimming pools, tennis courts, cabanas, etc. 2. FRANK WILLIAMS TOWERS @ Burj Boulevard, Dubai. - AED 720 million 2 Residential Towers, G + 43, G + 42, Podium 6 level, 3 levels secure Basement car park and 2 levels of partial car park, Garden and Pool amenities located at level 3 of a separate Podium overlooking the Burj Lake and Burj Khalifa, Retail shop front at Ground floor, Squash courts, Multipurpose Gym, swimming pools, landscaping etc.
April 2010
To November 2010
Civil Engineer
at M/s. Ramboll Consultants Middle East Ltd. Dubai
Project: SHINING TOWER - Abu Dhabi, 2 Towers, G + 32 Residential Tower, G + 36 Office Tower, 2 levels secure Basement car park, Garden and Pool amenities located at level 2 of Podium, Retail shop front at Ground floor, swimming pools, landscaping etc. 3 Nos. Concrete silos. For Al Khaleej Sugar factory, Jabel Ali Free Zone Area. The concrete structure of 45 m. diameter and 50 m height is constructed as slip form structure without construction joint.
July 2007
To March 2010
Lead Inspection Engineer
at M/s. Hyder Consulting Middle East Ltd.
Project: BURJ KHALIFA TOWER Inspection and supervision of Manmade World's tallest structure, podium and external areas including water features, tennis court, children's play area, landscaping, drainage system, road paving and stone cladding.
October 1999
To October 2000
Senior Site Engineer
at M/s. Al Miraj Contracting Est.
33 KV substation projects @ American University Sharjah and @ Khorfakkan and Storage tank @ Kalba for SEWA (Sharjah Electricity and Water Authority)
•G+4 & G+5 buildings at Sharjah.
•G+4 & G+5 buildings at Sharjah.
August 1997
To September 1999
Site Engineer
at M/s Fann Al Bina’a Contracting LLC.
New construction and maintenance work of school projects, for Ministry of Education, Oman.
August 1996
To July 1997
Office Engineer
at Tellichery Labour Contract and Construction Society
August 1995
To August 1996
Graduate Apprentice
at Kerala Public Works Department (P.W.D.)
Worked as a Graduate Apprentice August 1995 -August 1996
January 1994
To July 1995
Share on Facebook
Share on Twitter
Share Via Email