Post Contract Senior QS
مجموع سنوات الخبرة :55 years, 11 أشهر
1. Wasl Gate Phase IV -2 Towers - MU1(G+P1+P1+L1to L12) & MU2(G+P1+P1+L1 to L11) with one podium - Residential & Commercial Tower @ Jabal Ali - AL Wasl Properties AED 220 million 2. Tiara Hotel Project at Palm Dubai - Al Wasl Properties AED - 800 million
Major Projects:
•B+G+11 building at Al Qusais - AED 35 million
•16 nos. G+1 villas at Umm suqem - AED 24 million.
•G+4 Residential/Commercial Buildings at Port Saeed, Al Baraha, Souq Al Kabber Dubai.
•G+1 Villas, Ware houses and Labour camps in Dubai.
•Annual Maintenance works for Middle East Lubricants -Jabel Ali, Dubai.
•Construction of Air filter foundation and relocation of foundations at DUBAL.
•Construction of Storage tank foundation, Tank bund Wall, Pipeline foundations, Control Panel room and Drum storage rack foundation, Main parking yard and office car parking area for Middle East Lubricants JAFZA, Dubai.
Major Projects: 1. Ras Al Khor -Phase 1- 12 Nos. B+G+4 buildings- Residential and commercial - Al Wasl properties - AED - 500 million 2. The Ghalia & Vantage @ Jumeirah Village Community, Dubai. (DAMAC projects) Residential, Commercial Towers, G+38+Roof, G+28+Roof, Podium 4 levels, Ground car park and 4 levels of partial car park, Retail shop front at Ground floor, Multipurpose Gym, swimming pools, landscaping etc. Ghalia - G+38+Roof - AED 200 million Vantage - G +28+Roof - AED 175 million 3. Akoya Artesia - 4 Nos. G+28 floors towers with podium @ Dubai land, Dubai (DAMAC project) Residential, Commercial 4 Nos. Towers, G+28+Roof, with one Podium 4 levels, Ground car park and 4 levels of partial car park, Retail shop front at Ground floor, Multipurpose Gym, swimming pools, landscaping etc. Akoya Artesia - AED 700 million 4. 33 Nos G+1 Villas @ Jumeirah Golf Estate, Dubai. --AED 68 million 5. Emirates Canadian University @ UAQ (TATWEER GROUP) --AED 100 million 6. Immigration Detention block and Service Block Buildings @ Al Rowaiyah 3rd, Dubai for Dubai Police, Department of Punitive and correctional Institutions. -- AED 25 million
Projects: 1. BRIGHT START BEACH RESORT @ Jumeirah, Dubai. - AED 360 million A Basement+G+7 building (61000 m2 built up area) comprises of a Hotel five (5) star rating (with an international operator) and ancillary buildings. The Hotel consists of all in-house facilities like restaurants, bar/lounge, FOH & BOH areas, MEP areas, pool restaurant, fully landscaped to include external swimming pools, tennis courts, cabanas, etc. 2. FRANK WILLIAMS TOWERS @ Burj Boulevard, Dubai. - AED 720 million 2 Residential Towers, G + 43, G + 42, Podium 6 level, 3 levels secure Basement car park and 2 levels of partial car park, Garden and Pool amenities located at level 3 of a separate Podium overlooking the Burj Lake and Burj Khalifa, Retail shop front at Ground floor, Squash courts, Multipurpose Gym, swimming pools, landscaping etc.
Project: SHINING TOWER - Abu Dhabi, 2 Towers, G + 32 Residential Tower, G + 36 Office Tower, 2 levels secure Basement car park, Garden and Pool amenities located at level 2 of Podium, Retail shop front at Ground floor, swimming pools, landscaping etc. 3 Nos. Concrete silos. For Al Khaleej Sugar factory, Jabel Ali Free Zone Area. The concrete structure of 45 m. diameter and 50 m height is constructed as slip form structure without construction joint.
Project: BURJ KHALIFA TOWER Inspection and supervision of Manmade World's tallest structure, podium and external areas including water features, tennis court, children's play area, landscaping, drainage system, road paving and stone cladding.
33 KV substation projects @ American University Sharjah and @ Khorfakkan and Storage tank @ Kalba for SEWA (Sharjah Electricity and Water Authority)
•G+4 & G+5 buildings at Sharjah.
New construction and maintenance work of school projects, for Ministry of Education, Oman.
Worked as a Graduate Apprentice August 1995 -August 1996