Sr.Manager
western refrigeration pvt.ltd
Total years of experience :20 years, 11 Months
• Steered the operations and maintenance of Foaming, Gema Paint booth, Pneumatic, Hydraulics, CNC Punching Machines, PLC, Drives, Gas charging Machines and Utilities
• Successfully completed installation of R290 (hydrocarbon) gas charging machines on Final assembly line with all safety systems required for R290.
• Headed the team of Managers, Engineers and Technicians more than 35 Nos.
• Handled the investigation of all types of failures in various types of machines (i.e. Foaming/Gas charging/Performance test etc.)Breakdowns/problems and making reports RCA and KPI monthly Reports.
• Maintain KRA’s (i.e. MTTR and MTBR) as per Management Requirements
• Various audits facing from Various Agencies (i.e. SGP, Coke, ISO etc.)
• Spares development from local agencies to save cost of maintenance department.
1. Company Name: Everest Kanto Cylinder Limited
2. Duration: From 24/10/2009 to Continue.
Post Deputy Manager (Plant Engineering)
Job Profile
Electrical & Electronics Maintenance, Spare Management, Audit Preparation (ISO, TS). Continuous Improvement for Increasing Machines Uptime.
Project
➔ I was Joined EKC as a Asst.Manager and started to work on a world class green field project of making high pressure seamless cylinder from Steel Plates which cost is approximately 6 Lacs $. This is the second last project in all over world for making high pressure seamless cylinder from steel plates with use of latest Technology. I work on installation and Commissioning of Press Machine from SCHULER (Germany), 7stage Pre treatment Phosphating Plant by Bruimpianti (Italy), Bell and Tunnel Annealing Furnace from Fire and glass (Italy), Kuka Robot Communication with using 32 words for Material Handling in Phosphating Plant Loading and Unloading of the Component. Conveyor Automation of whole plant by using Omron makes PLC.
Technology
PLC (SIEMENS SIMATIC S7-300 & 400, Mitsubishi, Messung, Omron), KUKA make Industrial Robots. SCADA (Wincc, I - fix, Elipse, Visual Basic)
Location Gandhidham
Duration ➔ From October 2009 to Continue.
1. Company Name: Godrej & Boyce Mfg.Co.Ltd
2. Duration: 2 Year 6 Months (From April 2007 to October 2009)
Post Executive (Electronics and Electrical Division)
Job Profile
Maintenance of cnc machine and PLC's. (i.e Heidenhein, Siemens)
Maintenance of various types of controllers (Like as Siemens, Heidenhain, Pal, Num, Makino, Chmer, Fanuc and Centroid)
Maintenance of Drives
IMS Coordination
Commisning of CENTROID cnc controller
Technology Various Types of CNC Controllers, PLC (SIEMENS SIMATIC S7-300), Sparking and Grinding Machines
Location Vikhroli ( Mumbai)
Duration ➔ 2.6 Year.
1. Company Name: PSL Limited
2. Duration: 9 Months (From July 2006 to April 2007)
Post Executive (Electronics and Electrical Division)
Job Profile
Electrical and Electronics side supervision of Whole Plant.
Spare Controls of All Plant & Equipment (i.e. Automatic Cutting & Welding Machine, MVS System (CANADA), ultrasonic pipe testing system, I-Sam auto Tracking (GERMANY)
Maintenance of "LINCOLN" Automatic Welding System, "MAX-200" Plasma Cutting System,
Maintenance of AC & DC Drives & CNC system
Technology Various Types of Drives, PLC (SIEMENS SIMATIC S7-300), Ultrasonic Machines
Location Gandhidham (Gujarat)
Duration ➔ 9 Months.
1. Company Name: Sahajanad Laser Technology
2. Duration: 3 Years 1 Months (From June 2003 to July 2006)
Post Executive (Electronics and Electrical Division)
Job Profile
Servicing Of LASER Machine
Maintenance of CNC system
Maintenance of LASER source
Maintenance of LASER source power supply
Alignment of LASER (ND - YAG) system
Technology CNC Controllers, LASER System, Marking Technology
Location Gandhinagar (Gujarat)
Duration ➔ 3.1 Year.
Workshops Attended
B.Tech 65.75 AMS 2012 VOCATIONAL TRAINING TAKEN AT IPCL, BARODA (ONE OF THE BIGGEST REFINARY IN INDIA)
DIPLOMA 69.67 TEB 2003
HSC 59.11 GHSEB 2000