• Performed multi-discipline inspection activities
covering piping, welding, mechanical installation,
coating, pressure testing, and commissioning in
accordance with project specifications, approved ITP,
and international standards such as ASME, API, and
ISO.
• Verified material identification and traceability
including heat numbers, markings, and Material Test
Certificates (MTC) to ensure compliance with approved
material specifications.
• Conducted Positive Material Identification (PMI) for
alloy materials as per project and service
requirements.
• Performed fit-up inspections prior to welding, verifying
joint preparation, bevel angle, root gap, alignment,
cleanliness, and dimensional tolerances as per
approved WPS and isometric drawings.
• Monitored welding operations ensuring compliance
with approved Welding Procedure Specifications (WPS)
including control of preheat temperature, interpass
temperature, welding sequence, amperage, voltage,
and travel speed.
• Verified welder qualification records (WQT/WPQR) and
ensured welders were qualified for the applicable
welding process and position.
• Conducted visual inspection of welds (VT) during and
after welding to verify weld profile, penetration,
reinforcement, undercut, porosity, and other
discontinuities as per code acceptance criteria.
• Coordinated and witnessed Non-Destructive Testing
(NDT) including PT, MT, UT, and RT as per project
inspection requirements and reviewed NDT reports for
compliance.
• Performed dimensional inspections of piping spools,
assemblies, and equipment installation to confirm
compliance with approved drawings and tolerance
limits.
• Conducted thickness measurement and corrosion
monitoring using ultrasonic testing equipment where
required.
• Inspected threaded connections and flange
assemblies, verifying thread condition, flange face
finish, gasket installation, and bolt tightening as per
torque specifications.
• Witnessed hydrostatic pressure testing of piping
systems and mechanical equipment, verifying test
pressure, holding time, and leak tightness as per
project procedures.
• Performed line walk-down and line completeness
checks prior to hydrotest, verifying valves, supports,
blinds, vents, drains, and instrumentation connections.
• Conducted post-hydrotest inspections including
flushing, drying, and cleanliness verification of piping
systems.
• Supervised reinstatement activities such as removal of
test blinds, installation of valves, replacement of
gaskets, bolt torquing, and final tightening verification.
• Performed coating and painting inspections, verifying
surface preparation methods such as blasting in
accordance with SSPC and ISO 8501 standards.
• Measured surface profile and cleanliness prior to
coating application to ensure proper adhesion.
• Conducted wet film thickness (WFT) and dry film
thickness (DFT) measurements using calibrated
coating inspection instruments.
• Monitored environmental conditions including
temperature, humidity, and dew point during coating
application and curing stages.
• Inspected coated surfaces for defects such as runs,
pinholes, holidays, blistering, or peeling, and ensured
corrective actions were implemented.
• Witnessed mechanical equipment installation, verifying
alignment, leveling, orientation, and anchor bolt
tightening as per vendor specifications.
• Reviewed method statements, inspection procedures,
and quality plans to ensure compliance with project
quality requirements.
• Identified and documented non-conformities (NCRs)
and monitored corrective and preventive actions.
• Maintained inspection records, prepared daily
inspection reports, punch lists, and progress updates
for client and project management review.
• Verified instrument calibration certificates and ensured
all inspection and testing equipment were within valid
calibration periods.