Pedro Sanoja, Onshore/Offshore Piping Pipeline Manager

Pedro Sanoja

Onshore/Offshore Piping Pipeline Manager

TechnipFMC

Location
Venezuela
Education
Diploma, • Basic Offshore Safety Induction and Emergency Training (BOSIET)
Experience
40 years, 7 Months

Share My Profile

Block User


Work Experience

Total years of experience :40 years, 7 Months

Onshore/Offshore Piping Pipeline Manager at TechnipFMC
  • Venezuela
  • My current job since October 2016

2017: Current Project: Puma Energy Nicaragua (MANREF), Basic Engineering Ultra Low Sulfur Diesel Revamping.

Onshore piping / Pipeline Nationwide Manager
Responsible for Coordinates and supervises the activities piping / pipeline staff.
Follow project and detect weaknesses in Piping / Pipeline by analyzing the Performance and propose solutions.
For Construction business contact suppliers and subcontractors in any case, for EPC Projects.
Tenders: elaboration of technical bid Review, depending on the discipline, the scope and methodology of the project offered in the offer.
Assign the staff of the Department for the development of technical bids, when necessary, according to characteristics of the offer, classification and availability of the personnel. Check the estimates of documents to produce, man-hours and proposed staff to carry out the project within the time proposed in the tender. Coordinate the development of technical bids. Technical Management of Projects opening the project to assign to the staff of the department to roles in the different projects according to the needs of the Project Manager and the characteristics, classification and availability of the personnel.

Mechanical Engineer / Onshore Pipeline Engineer at Vepica CO
  • Venezuela
  • March 2013 to October 2016

March 2013 - Actual. VEPICA Consultants. Caracas Venezuela.
Pipeline Supervisor
Piping /Pipeline Engineering supervisor for biofuel producer plant.
PMC : Piping Detail engineering, consultant CO supervisor.
Steel Piping Plant Factory.

Onshore/Offshore Projects Pipeline Engineer. at WoodGroup Trinidad & Tobago.
  • Trinidad and Tobago
  • May 2012 to September 2012

May 2012-Sep 2012. WoodGroup Trinidad & Tobago.
Onshore/Offshore Projects Pipeline Engineer.
Main duties involve managing all kind of related resources such as staffing, financial, software, and hardware, technical resources and facilities, as require by project's Direction and according to the description above. Roles and responsibilities are generically related to the responsibilities of senior pipelines engineering lead in highly technical projects. Responsibilities also include managing team relations within project organization, becoming a cohesive element in project teams and propitiated that productivity levels and morale are maintained and improved, setting orientations for the work to be done and setting appropriated targets and challenges from this organizational position, keeping appropriated relationships with project manager and coordinators, and with personnel from others companies and clients involved or related to the projects.
Full responsible & coordination for NOEL PIPELINE REVALIDATION.
CTR & Appraise /Select Stage DSP for Revalidation 30" oil pipeline from Onshore to 5 km offshore engineering. Feed, basic and detail engineering.
.

Onshore Gas Pipeline Construction SPT. at Petrotiger
  • Colombia
  • May 2011 to May 2012

May 2011-May 2012. Petrotiger Bogotá Colombia.
Onshore Gas Pipeline Construction SPT.
Construction Manager Support in technical review for Petro-Peru Refinery Talara Tender revamping.
Assist in preparation of technical documents for new Tender in Recope NOC from Costa Rica require construction 9 new storage tanks and 60 km multiproduct pipeline.

Project Engineer/Pipeline Engineer. at Mellitah OG
  • Libya - Tripoli
  • July 2009 to October 2010

July 2009 - Oct 2010. Mellitah Oil & Gas B.V. (Gas Division), Libyan Branch.
Project Engineer/Pipeline Engineer.
Responsible for assist and co-ordinate supporting of project activities in accordance with company requirements. Review and execute assigned engineering projects to support Onshore & Offshore activities. Review, monitor, control & execute projects and to assist the immediate supervisor in the coordination of technical & operational support.
Project management, Contract management and Execution of project involving “Review of Design, Engineering, Construction and Commissioning”
• Check on correct implementation of method statements, internal procedures for the
construction work, execution of work as per “good for construction” drawing and check on as built drawing preparation
• Review scopes of work, specifications and drawings for major projects
• Monitor the project and ensure compliance to standards & requirements. Liaise with
Contractors regarding project execution and schedules
• Prepare specifications and provide technical recommendations for procurement of major equipments
• Visits onshore plants to review and assist in ongoing projects and participates in major and / or complex repair activities
• Liaises with Lead Engineer, Maintenance Engineers and site maintenance personnel on technical aspects relating to the specifications of new machinery to be ordered for major projects or the modification of present equipment and makes recommendations accordingly
• Studies special technical problems and submits reports to Engineering Manager
•ALARP as per company policies for pipeline network to develop, implement and update the pipeline integrity management.
•Route Matrix Selection
•Construction Cost Estimation, Contractors Matrix Evaluation
•Develop intelligent pigging plans for transmission pipelines and international inspection plans.

Feed Project Engineer at RLG / Proynca Consortium
  • Venezuela
  • June 2007 to July 2009

June 2007 - July-2009 - RLG - PROYNCA Consortium Caracas VE.
Feed Project Engineer.
FEED for Caribbean Sea NGC Supply.
Visualization for Technologies to use for this NGC major project, Compressor Plant, Storage Vessels, Ships Cargos, Harbors Arrangements, Caribbean Islands Supply, Mayor and Minor Antilles Islands, Central America GAS SUPPLY.
Project Engineer. Oil Pipeline Engineer.
Flow Heavy Oil Station Engineering for Sincor, with 250000Brls/Day production.
Design calculations (wt, Diameters, Hydraulics, and Mat Selections).
Route Matrix Selection
Heavy Oil pipeline/piping, Valve Block Stations design for interconnections from the field production and main pipeline.
Client SINCOR.

Gas Pipeline Supervisor at Qatar Petroleum
  • Qatar - Doha
  • June 2005 to March 2007

June’2005-March’ 2007. Qatar Petroleum. Doha.
Gas Pipeline Construction Supervisor.EDL-316
January 2006. Ethane Pipeline. Responsible for all activities in Construction, Pipeline Installations, Stations Constructions. From Ras Laffan Industrial City to Mesaieed Industrial City. 120 km, 20”.
June 2005. Responsible for all activities in Construction of stations A1-A2-V in Ras Laffan-Mesaieed Sweet Gas Pipeline 36”, 120km. (RMSGP).

Project Engineer at Sodinsa Consultancy CO
  • Venezuela
  • February 2004 to June 2005

February’04- June’2005. Sodinsa, Consultancy CO. Caracas.
Major Project Mechanical Engineer.
Responsible for coordinating all activities to develop the mechanical engineering for high and low pressure oil & gas pipelines, export pipeline, metering station to sell gas on specific conditions.
Responsible for all mechanical engineering of Central Process Facilities to produce 5000 OIL BPD and 50 MMSCF/D, for Vinccler Oil & Gas CO, Venezuelan Western Block oil field.
Design OIL Pipeline sizing for 30 km and terminal dispatch.
Design Gathering pipeline 10km from the oil field production to CPF.
Equipment procurement and specifications, pumps, gas turbines, coolers, compressors, slug catcher, separators.

Project Engineer at PDVSA OIL AND GAS
  • Venezuela
  • July 1991 to February 2003

August’02 - February’03 PDVSA, Caracas
Major Project Leader.
Responsible for coordinating, ICO Project (Central-Western Interconnection). EPP for the construction of a 30”, 300 Km. gas pipeline between Moron, Carabobo State and Rio Seco, Falcon State. Five consulting companies were involved for major projects with an executed budget of Bs. 6, 000 million and future disbursements in the next three years of US$ 470 million.
January’02 - August’02 PDVSA Gas - Investment Projects.
Gas pipeline construction Leader.
Responsible for executing the construction of a 36”, 33 Km. “Asapo Gas Pipeline” Loop, between Guico and Dacion Stations. The Project also included the construction of a new Receiving-Transferring Trap station, involving more than 40.000 man-hours and a capital budget of Bs. 3, 000 million.
January’00 - January’02. PDVSA Gas - Investment Projects.
Project Execution Leader for industrial customers.
Responsible for coordinating, managing and executing all the infrastructure projects for the installation of Metering and Regulation Stations in the Puerto Ordaz Industrial Park, Bolivar State.
-Comsigua. 26” Investment Bs. 500 million.
-Posven. 12” Investment Bs. 400 million.
-Orinoco Iron.26” Investment Bs. 1, 000 million.
August.’95- January’00 Corpoven Gas.
Design and Supervision Engineer for gas pipeline construction.
Responsible for the design and construction of gas pipelines for Corpoven Gas Management. Direct execution together with specialized consulting companies, management of allocated budgets and direct accountability to the Gas Superintendence.
July’91 - August’95 Corpoven - Industrial Facilities.
Responsible for the engineering of more than 30 minor projects per year for the Gas Management, adding customers accordingly to the Gas Metropolitan and National networks. Responsible for the direct supervision of 5 professionals and a contracted employee. Responsible for an investment budget of Bs. 50 million/year.

Project Planning and Control at Proyecta S.A
  • Venezuela
  • August 1985 to July 1991

August’85 - July’91 Proyecta S.A - Caracas
Project Planning and Control. 1986-1988. APOLO Consortium
Planner for Puerto Ordaz Gasoline Plant - Sisor Project.
Project Control - Sisor 12” Polly-products pipeline - Puerto Ordaz and Ciudad Bolivar.
Contracted by Corpoven S.A. for the company Proyecta S.A.
Planner of LANA - 36 Project. 1985 (Loop Pipeline 100km, 36”. Central-East Country Pipeline)
Planning of the Metropolitan Aqueduct for the Dominican Republic. 1985
Planner of the Metropolitan Aqueduct for the Dominican Republic State; services contracted by the company and executed in the same year under the supervision of the Metropolitan Aqueduct.
Inspector of Works. 1985
Repair of fuel tanks - Cantinas Plant, Lagoven.
Inspector of Mechanical Works for Catia La Mar Plant

Drilling Engineer at Meneven S.A
  • Venezuela
  • November 1981 to August 1985

November’81 - August’85 Meneven S.A -San Tome Drilling.
Drilling Engineer.
Responsible for the Drilling Engineering in the North and South Areas of Anzoategui State for Meneven’s Drilling Management, San Tome.
1982, assigned to high level well drilling studies at LSU, Lafayette, Louisiana, USA.
1983 - June 1984, Rig Engineer responsible for drilling operations. Responsible for Rigs Meneven 6, Meneven 12 and their 8hr. crews, based on 21 x 21 days. Successful drilling and completion of 6 wells yielding a high production with a total investment of Bs. 36 million. No accidents reported.
1984 - 1985. Workover Engineer for 15 wells with low or no production. Responsible for engineering in the execution of field work. Responsible for sand cementing, perforations, gravel pack, packers and iron plugs setting and completion operations, managing workers and supervising 8 hr. crews 21 x 7 days. No accidents reported. Total investment - Bs. 315 million. (USD 12.6 Millions)

Education

Diploma, • Basic Offshore Safety Induction and Emergency Training (BOSIET)
  • at FALCK NUTEC
  • June 2012

•Basic Offshore Safety Induction and Emergency Training (BOSIET) Number : 74245700310512230501

Diploma, •Hydrogen Sulphide Awareness
  • at FALCK NUTEC
  • June 2012

•Hydrogen Sulphide Awareness. Number 4230512

Diploma, • BP Golden Rules of Safety & Environmental Management Systems
  • at FALCK NUTEC
  • May 2012

•BP Golden Rules of Safety & Environmental Management Systems Number : 4230503

Diploma, • NEBOSH National General Certificate in occupational safety and health
  • at Training by Experts
  • March 2007

Scholarships by Qatar Petroleum

Master's degree, Engineering Management Specialist
  • at Universidad Santa Maria
  • October 1995

GPA: 90/100

Diploma, Drilling Engineer
  • at Prentices and Records
  • September 1992

Scholarships by Meneven OIL COMPANY

High school or equivalent, English Training
  • at Berlitz School
  • August 1982

Scholarship by Meneven S.A Oil Company

Diploma, Professional Mechanical Engineer
  • at Universidad Central de Venezuela
  • July 1981

GPA: 80/100

High school or equivalent, High Scholl in Sciences
  • at Liceo Fernando Peñalver
  • July 1974

Specialties & Skills

Gas Stations
Project Coordinating
FEED GAS PROJECTS
Spanish and English
Middel East Pipeline Installations
projects Planning and Control
Gas metering stations
Gas Pipeline Coinstruction
Oil and Gas distibution stations
Gas Piping Plants Design and Construction

Languages

English
Expert
Spanish
Expert

Memberships

Colegio de Ingenieros de Venezuela
  • MS: 32208
  • October 1981
•Consejo Profesional Nacional de Ingeniería de Colombia
  • CN230-82299
  • May 2012

Training and Certifications

Number : 4230503 (Certificate)
Date Attended:
May 2012
Valid Until:
May 2012
Number : 74245700310512230501 (Certificate)
Date Attended:
May 2012
Valid Until:
May 2012
Number 4230512 (Certificate)
Date Attended:
May 2012
Valid Until:
May 2012