Manager QA/QC Manager in Shapoorji Pallonji Qatar
Shapoorji Pallonji company Qatar
مجموع سنوات الخبرة :32 years, 4 أشهر
process of suppliers &contractors (refer to preparation of Technical specifications & Tender
documents) monitor order and procurement phase.
➢ Prepare, check continuously monitor the implementation & revise if necessary the detailed work schedule, material
equipment supply schedule budget &financial plans.
➢ Monitor, supervise, coordinate and manage daily construction &site activities.
➢ Reviewing the project in detail to schedule deliverables and estimate costs.
➢ Monitor the safety regulations ensure followed by construction Team.
➢ Coordinate and direct construction workers and sub-contractors.
➢ Analyses manage and mitigate risks.
➢ Ensure quality construction standards and the use of proper construction techniques.
➢ Deploy of site Engineer and Forman for activities as per their requirement.
➢ Experience in building (Villas/Malls/Hotels/Residential Tower/Offices Tower/Fit out/), Infrastructure, Road, Bridge,
Railway, substation, swimming pool, Water feature, hard and soft landscape-Execution, inspection, snagging, and
project handing over, Operations and Maintenance Manual and other necessary documents that required.
Construction of substation for power connection at EZ-03, Construction of substaion at EZ-03 under Muhibbah engineering, Construction of GTC-666, 706, under Kahramaa
Construction of Mixed used development in Doha Oasis project Cost of the project 4000 millions
Project : Doha Oasis Mixed Use Development Doha, Qatar
Office tower (3B+G+27F) MARINA COM.20 AT LUSAIL DOHA Doha, Qatar
Project : Breeding Farm Project-Al Zubara Doha, Qatar
Client : Racing and Equestrian clubs and steering &follow-up
committee State of Qatar
Nature of work : Construction of Horse Breeding farm of area 1.5KMX1KM including, Road work
approx. 32 K.M, infrastructure, huge irrigation Tank, Drainage systems, ancillary
building, substation, etc.
Budget : 400 Million Qatar Riyal
Construction of Breeding farm as Al Zubara
Nature of work : 3no’s basement, 5office building (G+7), show room (G+3), conference building and
crown plaza hotel (G+7)
:900 Million Qatari Riyal
Nature of work : Piling work including shoring piles.5 basement G+20 Floor office Building
Budget : 190 Million UAE Dirhams
Construction of 10 buildings and 5 Towers (G+M+14 floor)
Budget : 700 Million UAE Dirham
Engineers -Project at Al Faraa General Contracting Company
Nature of work : 89 villas& 208 Apartmentsand 19 Luxurious villa at west bay of
Mr. Ahmad Almajed
construction of major bridge no. 695& 533, construction of Barapullah bridge, construction gazipur bridgein between TD1&TD2, Construction of PSC bridge at Ashok vihar, construction of Radiant export factory building, construction of sukkun investment factory building.
Earth work in formation and construction of Retaining wall for 3rd line eastern railways Project between Karwandiya to shivsagar road.
QATAR
- Doha Oasis Mixed Use Development
Qatar four basements, amusement
theme experience Centre, 9storeys
residential building and 28 storey
5star hotel including Fit out
- Office Tower (3B+G+27F) at Lusail.
(shoring piles, working piles, test piles)
- W.G.S. at Qatar Foundation. (Football
ground, Tennis Ground, Skate Park)
- Breeding Farm Project.
(Infrastructure, Road, ancillary
building, main gate, service gate,
substations)
- Business Park and crown Plaza hotel.
(Fit out, water features, land
scapping, swimming pool, substations)
UAE
- Construction of (5
basement+G+M+20) Tower-shoring
piles, working piles, substation
- Development of Abraj AL raha- 5
Tower (G+M+14 storey) and 10
Building (Residential and podium)
QATAR
- Zig Zag Twin Tower at west bay lagoon
&Palm Twin Tower.
- Luxuries 19 villas at west bay.
- Two Residential compound at ALwaab
DUTIES AND RESPONSIBILITY
➢ Initializes and establishes the Quality Management System (QMS) through the Project Quality Plan (PQP).
➢ Authorized and responsible to assure that all project activities affecting quality are in compliance with established and
approved PQP.
➢ Determine and establish quality objectives and Preparation of Key Performance Indicators (KPI), assessment reports &
recommending improvement actions.
➢ Review and approve material submittals for conformance with project specifications by direct review and ensuring
the supplier/manufacturer compliment statement.
➢ Developing, implementing and maintaining an effective quality control system that complies with the general
conditions of contract and specification requirements through preparation of work related Method Statements (MS)
and inspection and Test Plans (ITP).
➢ Consistently maintain high level of customer, contractor satisfaction and; accurately and precisely fulfill requirements,
resolve/manage conflicts and issues appropriately present solutions efficiently and effectively.
➢ Controls & analyses non-conformities and involved in the proposal, implementation and follow up of the appropriate
Corrective actions. To initiate action to prevent the occurrence of nonconformity relating to the quality system.
➢ Ensure quality records are maintained, as obligatory by the quality system and customer requirements, ISO 9001
Requirements.
➢ Undertake awareness training in the project Quality Management System, ISO, procedures and methods and ensure
that all internal and external project members are trained in accordance with their duties.
➢ Identify the training requirements of staff; prepare training modules for Induction, Technical & System trainings.
Conduct trainings, evaluate the effectiveness of training and modify the modules as required.
➢ Lead a pre-inspection meeting with project staff for critical activities to explain the activities sequences and
inspections & measuring requirements.
➢ Prepares quality assurance audit checklists, conduct 1st (internal) audits and 2nd party audits (on Subcontractors,
Suppliers, etc) to verify the effectiveness of the project quality program and report audit results.
➢ Identifies and reports conditions that require corrective action by management and follows up to ensure completion.
➢ Follows up on actions taken in response to audit findings to ensure adequate close out.
➢ Maintain client liaison and communication for the quality related activities and Participate in QA/QC Meeting with
client and consultant.
➢ Follow-up of internal and external laboratory testing and verify the test reports for materials, concrete, etc.
➢ Preparing and circulating “Quality bulletins” of relevant issues to communicate with in organization.
➢ To initiate, recommend or provide solutions to quality related problems, through designated channels.
➢ Determines, collects, and analyses appropriate data to demonstrate the suitability and effectiveness of the quality
management system.
➢ Deploy QC Engineers for Inspection off all works to verify the compliance to approved method statement, shop
drawing and specifications.
➢ Excellent in motivation and managing QA/QC Engineers/Inspectors and Document Controllers
➢ Planning, coordination &control of construction & site activities in order to provide most optimum use of existing
resources
Nature of work : Construction of Electrical substation (for power connection) to Manateq Umm Alhoul
special Economic zone (QEZ-3) & Construction of Roads & Infrastructure works pack3.3.
phase 2.1 (portion 2A) Marine cluster. -Substations, Micro Tunneling.
Nature of work : 4 no’s basements, 1Hotel building (G+28), 5Nos nine-storey high-end residential
buildings, mixed-use podium will include housing, retail, indoor amusement theme park
Budget : 4 Billion Qatar Riyal
Construction of Office Tower.
Budget :216 Million Qatar Riyal
B+G+36) zig Zag Twin Tower along with Lagoon Mall as well as Palm Twin
Tower(B+G+57)
Budget : 1600 Million Qatari Riyals
Passed civil Engineering with 1 st class with Distinction