Senior Process Engineer à Sirte Oil Company
  • Libye
  • Je travaille ici depuis février 2024

Position Title : Senior Process Engineer Reporting to : Engineering Manager From Date : February 6, 2024 To Date : February 6, 2025 No. of months : 12

Work Location : Brega, Libya Oil & Gas Main Duties :
• To support the operation facility of Upstream Onshore Oil & Gas owned by Sirte Oil Company.
• To prepare existing Gas Plant assessment for Modification. Work Experience II Employer : Waha Oil - Oil & Gas Company

Senior Process Engineer à Waha Oil Company
  • Libye - Tripoli
  • janvier 2024 à janvier 2024

Main Duties :
- To review detail engineering of Turnkey Project for Chadar Upstream Onshore Oil & Gas owned by Zallaf Oil Company located at Eastern Sahara Desert.

Senior Process Engineer à Chipta Bangun Nusantara-Geothermal Consultant
  • Indonésie - Jakarta
  • mars 2017 à août 2017

Main Duties :
- Part time job to review detail engineering of Sarulla Geothermal Power Project at North Sumatera.

Lead Process Safety à Pratiwi Putri Sulung - Engineering Consultant
  • Indonésie - Jakarta
  • mai 2016 à juillet 2016

Main Duties :
- Hazop & Hazid study with Third Party for small LNG Project

Senior Process Engineering à Chevron Indonesia
  • Indonésie - Balikpapan
  • août 2013 à juillet 2015

Main Duties :
- To estimate the budget for the projects
- Review Bidders to do the projects
- To review & monitor the contractor preparing all the existing documents & drawings related to Process Safety Information (PSI), flares, vents & relief devices at all Offshore & Onshore plants at Kalimantan Operation.
- To review & monitor the work for exisiting Documents & Drawings of all existing Platforms done by Consultant to meet PSI requirements
- To review & monitor the work for assessement of all exisiting flares, vents & relieve devices of all existing Platforms done by Consultant using IPRSM, Flaresim and phast to meet Chevron Engineering Standard
- Supporting the construction and the commissioning

Senior Process Engineer à Pertamina Upstream Energy
  • Indonésie - Jakarta
  • mai 2010 à mai 2013

Main Duties :
- Preparing ITB (Invitation To Bid)
- To review FEED and detail design & installation of offshore Brownfield existing receiving facility (restaging compressor, replacing fuel gas system, etc), Greenfield remote platform & pipeline projects prepared by EPCI Company
- Participating in Hazop, Hazid, SIL, Envid study
- Enquiry to Vendors
- Preparing Vendor Technical Bid Evaluation
- Supporting the construction and the commissioning
- Supporting Start up

Senior Process Engineer à Petronas Malaysia
  • Malaisie - Kuala Lumpur
  • janvier 2009 à décembre 2009

Main Duties :
- To review conceptual & detail design of offshore brown field projects prepared by Consultant
- Participating in Hazop, Hazid, SIL, & PRA study
- Enquiry to Vendors
- Preparing Vendor Technical Bid Evaluation
- Supporting the construction and the commissioning

Senior Process Engineer à Enerkon
  • Indonésie - Jakarta
  • juin 2008 à décembre 2008

Main Duties :
- Feed activities for Kungrad Gas Dehydration Unit at Uzbeskistan
- Detail Engineering activity of Wellpad-A Flow Well Stream & Pipeline for Exxon Mobil - Pertamina Cepu, Indonesia

Senior Process Engineer à MMC Oil & Gas Engineering Sdn. Bhd
  • Malaisie - Kuala Lumpur
  • juin 2007 à mai 2008

Main Duties :
Engineering Services for Petronas Carigali (Malaysian Oil Gas Company) & Exxon Mobil majoring in offshore & pipeline projects. The engineering services can be FEED, Detail Engineering, Construction and Commissioning’

Senior Process Engineer à PT Rekapatria Ekaguna – EPC Company
  • Indonésie - Jakarta
  • juin 2005 à mai 2007

Main Duties :
1. Detail Engineering of Well Head Platform & Pipeline owned by Amerada Hess
Activities :
- Preparing Top Side and Pipeline Simulation
- Preparing Flow Assurance for the Pipeline
- Preparing Process Design Basis
- Preparing Process Equipment Design for Vessel & Pump
- Preparing Safety Relieving, Venting, Draining and Isolation Philosophy
- Preparing Operating Control Philosophy
- Preparing P&ID, PFD & Safe Chart
- Participating in Hazop, Hazid and SIL
- Preparing Precommissioning Dossier
- Preparing Operating Manual
2. Engineering Services for CNOOC Oil & Gas Company
3. Proposal Projects

Senior Plant Service à PT Adikarya, PT Wika and PT IKPT (EPC Consortium)
  • Indonésie - Jakarta
  • mai 2004 à mai 2005

Main Duties : Detail Engineering of Utility & OSBL Petrochemical Plant owned by State oil & gas company and Mitsui
Activities :
- Preparing Safety Equipment Data Sheet
- Preparing UFD and P&ID
- Preparing Technical Bid Analysis of Safety Equipment Vendors
- Preparing Operating Manual
- Preparing F & G Cause & Effect
- Preparing Dossier for Precommissioning, Commissioning & Start-up

Lead Process Engineer à PT Wood Group Indonesia
  • Indonésie - Jakarta
  • février 2004 à mai 2004

Main Duties : Proposal Projects

Lead/Senior Process Engineer à PT Kvaerner Indonesia - Engineering Consultant
  • Indonésie - Jakarta
  • septembre 2002 à décembre 2003

Main Duties :
1.Detail Engineering of Pechiko onshore project phase IV at Kalimantan, Indonesia owned by Total Fina Indonesia
Activities :

- Preparing Process Design Basis
- Preparing Process Equipment Design for Vessel, Cooler, Slug Catcher & Pump
- Preparing Safety Philosophy
- Preparing Operating Control Philosophy
- Preparing P&ID, PFD & Safe Chart
- Preparing ESD (Emergency Shutdown Diagram)
- Preparing Flare Network
- Preparing Flare & Blowdown Report
2. Engineering Services for BP-Indonesia

Lead Process Engineer à PT Siemens Indonesia – EPC Company
  • Indonésie - Jakarta
  • décembre 2001 à août 2002

Main Duties :
1.Detail Engineering of LPG and Sulfur Recovery Project at Cilacap, Indonesia owned by State oil & gas company
Activities :
- Preparing Process Design Basis
- Preparing Process Equipment Design for Column, Vessel, Heat Exchanger, Compressor & Pump
- Preparing Safety Philosophy
- Preparing Operating Control Philosophy
- Preparing P&ID, PFD & Safe Chart
- Preparing Utility Consumption.
- Preparing technical bid analysis for internal column, furnace & boiler
2. Vendor Evaluation

Lead Process Engineer à PT Singgar Mulia – Engineering Consultant
  • Indonésie - Jakarta
  • août 2001 à novembre 2001

Main Duties : Detail Engineering of Pit Improvement Project at Duri, Riau, Indonesia owned by PT Caltex Indonesia
Activities :
- Preparing Process Design Basis
- Preparing Equipment Design for Pit & Pump
- Preparing Operating Control Philosophy
- Preparing P&ID, PFD
- Participating in Hazop

Senior Process Engineer à PT Jaya CM – EPC Company along with Tokyo Electrical Company and State Electrical Company
  • Indonésie - Jakarta
  • mai 2000 à juillet 2001

Main Duties : Preparing bid documents for Detail Engineering of Power Plant Project at Tarahan, Lampung, South Sumatera, Indonesia, especially for water treatment & utility consumption and including site visits

Senior Process Engineer à PT Petrosea – EPC Company
  • Indonésie - Jakarta
  • novembre 1999 à mars 2000

Main Duties : Detail Engineering of Kakap Gas Compresion Project at West Natuna, Indonesia owned by Conoco Indonesia
Activities :
- Preparing Top Side Simulation
- Preparing Process Design Basis
- Preparing Process Equipment Design for Vessel & Pump
- Preparing Process Safety Reliev Valve, Control Valve
- Preparing Operating Control Philosophy
- Preparing P&ID, PFD & Safe Chart

Senior Process Engineer à PT Istana Karang Laut – EPC Company
  • Indonésie - Jakarta
  • mars 1999 à octobre 1999

Main Duties :
1.Basic & Detail engineering design of CO2/H2S Removal & Dehydration units for oil and gas project.

Activities :
- Preparing CO2/H2S Removal & Dehydration Simulation
- Preparing Process Design Basis
- Preparing Process Equipment Design for Column, Vessel & Pump
- Preparing Process Safety Relieve Valve, Control Valve
- Preparing Operating Control Philosophy
- Preparing P&ID, PFD & Safe Chart
2. Proposal Projects

Process Engineer à PT Inti Karya Persada Teknik (IKPT) – EPC Company
  • Indonésie - Jakarta
  • juin 1991 à février 1999

Main Duties :
- Doing Detail engineering work of LNG train F Plant with Chiyoda engineering Contractor.
- Doing Detail engineering work of Fertilizer Plant with Kellog engineering Contractor.
- Doing Detail engineering work of LNG train G Plant with Kellog engineering Contractor.
- Attending a team organized by PT IKPT to revise engineering drawing (Pipe & Instrument Diagram) of Arun LNG plant at Indonesia
- Joining with Kellog Engineering Company to do basic engineering design of train H (LNG project) at Kalimantan, Indonesia
- Joining with Chiyoda Engineering Company to do detail engineering design of Sulfuric Acid Plant at East Java, Indonesia
- Joining with Kellog Engineering Company to do detail engineering design of train H (LNG project) at Kalimantan, Indonesia
- Proposal Project for onshore receiving facility

Activities :
- Preparing process description based on Licensor
- Preparing PFD, UFD
- Preparing Process Principles & Design Consideration
- Preparing Equipment List
- Preparing P&ID
- Doing Hydraulic Calculation, Relief valve sizing, Special Piping-Item, Sizing separator, pump, control valve, heat exchanger rating and etc.
- Checking Internal column vendor
- Preparing Pipeline Nomenclature
- Preparing Battery Limit Summary
- Preparing Flare network System
- Preparing Technical bid analysis of Vendor
- Checking water treatment & Utility water for BFW

Éducation

Baccalauréat, Chemical Engineering
  • à The Bandung Institute of Technology, Faculty of
  • février 1986

Specialties & Skills

CONTROL VALVES
PETROCHEMICAL
HYDROGEN SULFIDE (H2S) TRAINING
PROCESS DESIGN
PROCESS SAFETY
DRAWING
EMERGENCY SHUT DOWN (ESD) SYSTEM
ENGINEERING DRAWINGS
COMMISSIONING

Langues

Indonésien
Expert
Anglais
Expert

Formation et Diplômes

Calculation of Flare Relief Loads Class (Formation)
Institut de formation:
Chevron
Date de la formation:
September 2013
Durée:
18 heures
PSI Shaping Plant (Formation)
Institut de formation:
Chevron
Date de la formation:
March 2015
Durée:
18 heures
IPRSM Software Training (Formation)
Institut de formation:
Farris
Date de la formation:
April 2014
Durée:
36 heures
The Course on Gas Turbines and Centrifugal Compressor (Formation)
Institut de formation:
GE Nuovo Pignone
Date de la formation:
October 2000
Durée:
24 heures
Aspen Design and Rate Heat Exchanger (Formation)
Institut de formation:
Aspen
Date de la formation:
December 2012
Durée:
32 heures