Senior Process Engineer
Sirte Oil Company
Total des années d'expérience :24 years, 9 Mois
Position Title : Senior Process Engineer Reporting to : Engineering Manager From Date : February 6, 2024 To Date : February 6, 2025 No. of months : 12
Work Location : Brega, Libya Oil & Gas Main Duties :
• To support the operation facility of Upstream Onshore Oil & Gas owned by Sirte Oil Company.
• To prepare existing Gas Plant assessment for Modification. Work Experience II Employer : Waha Oil - Oil & Gas Company
Main Duties :
- To review detail engineering of Turnkey Project for Chadar Upstream Onshore Oil & Gas owned by Zallaf Oil Company located at Eastern Sahara Desert.
Main Duties :
- Part time job to review detail engineering of Sarulla Geothermal Power Project at North Sumatera.
Main Duties :
- Hazop & Hazid study with Third Party for small LNG Project
Main Duties :
- To estimate the budget for the projects
- Review Bidders to do the projects
- To review & monitor the contractor preparing all the existing documents & drawings related to Process Safety Information (PSI), flares, vents & relief devices at all Offshore & Onshore plants at Kalimantan Operation.
- To review & monitor the work for exisiting Documents & Drawings of all existing Platforms done by Consultant to meet PSI requirements
- To review & monitor the work for assessement of all exisiting flares, vents & relieve devices of all existing Platforms done by Consultant using IPRSM, Flaresim and phast to meet Chevron Engineering Standard
- Supporting the construction and the commissioning
Main Duties :
- Preparing ITB (Invitation To Bid)
- To review FEED and detail design & installation of offshore Brownfield existing receiving facility (restaging compressor, replacing fuel gas system, etc), Greenfield remote platform & pipeline projects prepared by EPCI Company
- Participating in Hazop, Hazid, SIL, Envid study
- Enquiry to Vendors
- Preparing Vendor Technical Bid Evaluation
- Supporting the construction and the commissioning
- Supporting Start up
Main Duties :
- To review conceptual & detail design of offshore brown field projects prepared by Consultant
- Participating in Hazop, Hazid, SIL, & PRA study
- Enquiry to Vendors
- Preparing Vendor Technical Bid Evaluation
- Supporting the construction and the commissioning
Main Duties :
- Feed activities for Kungrad Gas Dehydration Unit at Uzbeskistan
- Detail Engineering activity of Wellpad-A Flow Well Stream & Pipeline for Exxon Mobil - Pertamina Cepu, Indonesia
Main Duties :
Engineering Services for Petronas Carigali (Malaysian Oil Gas Company) & Exxon Mobil majoring in offshore & pipeline projects. The engineering services can be FEED, Detail Engineering, Construction and Commissioning’
Main Duties :
1. Detail Engineering of Well Head Platform & Pipeline owned by Amerada Hess
Activities :
- Preparing Top Side and Pipeline Simulation
- Preparing Flow Assurance for the Pipeline
- Preparing Process Design Basis
- Preparing Process Equipment Design for Vessel & Pump
- Preparing Safety Relieving, Venting, Draining and Isolation Philosophy
- Preparing Operating Control Philosophy
- Preparing P&ID, PFD & Safe Chart
- Participating in Hazop, Hazid and SIL
- Preparing Precommissioning Dossier
- Preparing Operating Manual
2. Engineering Services for CNOOC Oil & Gas Company
3. Proposal Projects
Main Duties : Detail Engineering of Utility & OSBL Petrochemical Plant owned by State oil & gas company and Mitsui
Activities :
- Preparing Safety Equipment Data Sheet
- Preparing UFD and P&ID
- Preparing Technical Bid Analysis of Safety Equipment Vendors
- Preparing Operating Manual
- Preparing F & G Cause & Effect
- Preparing Dossier for Precommissioning, Commissioning & Start-up
Main Duties : Proposal Projects
Main Duties :
1.Detail Engineering of Pechiko onshore project phase IV at Kalimantan, Indonesia owned by Total Fina Indonesia
Activities :
- Preparing Process Design Basis
- Preparing Process Equipment Design for Vessel, Cooler, Slug Catcher & Pump
- Preparing Safety Philosophy
- Preparing Operating Control Philosophy
- Preparing P&ID, PFD & Safe Chart
- Preparing ESD (Emergency Shutdown Diagram)
- Preparing Flare Network
- Preparing Flare & Blowdown Report
2. Engineering Services for BP-Indonesia
Main Duties :
1.Detail Engineering of LPG and Sulfur Recovery Project at Cilacap, Indonesia owned by State oil & gas company
Activities :
- Preparing Process Design Basis
- Preparing Process Equipment Design for Column, Vessel, Heat Exchanger, Compressor & Pump
- Preparing Safety Philosophy
- Preparing Operating Control Philosophy
- Preparing P&ID, PFD & Safe Chart
- Preparing Utility Consumption.
- Preparing technical bid analysis for internal column, furnace & boiler
2. Vendor Evaluation
Main Duties : Detail Engineering of Pit Improvement Project at Duri, Riau, Indonesia owned by PT Caltex Indonesia
Activities :
- Preparing Process Design Basis
- Preparing Equipment Design for Pit & Pump
- Preparing Operating Control Philosophy
- Preparing P&ID, PFD
- Participating in Hazop
Main Duties : Preparing bid documents for Detail Engineering of Power Plant Project at Tarahan, Lampung, South Sumatera, Indonesia, especially for water treatment & utility consumption and including site visits
Main Duties : Detail Engineering of Kakap Gas Compresion Project at West Natuna, Indonesia owned by Conoco Indonesia
Activities :
- Preparing Top Side Simulation
- Preparing Process Design Basis
- Preparing Process Equipment Design for Vessel & Pump
- Preparing Process Safety Reliev Valve, Control Valve
- Preparing Operating Control Philosophy
- Preparing P&ID, PFD & Safe Chart
Main Duties :
1.Basic & Detail engineering design of CO2/H2S Removal & Dehydration units for oil and gas project.
Activities :
- Preparing CO2/H2S Removal & Dehydration Simulation
- Preparing Process Design Basis
- Preparing Process Equipment Design for Column, Vessel & Pump
- Preparing Process Safety Relieve Valve, Control Valve
- Preparing Operating Control Philosophy
- Preparing P&ID, PFD & Safe Chart
2. Proposal Projects
Main Duties :
- Doing Detail engineering work of LNG train F Plant with Chiyoda engineering Contractor.
- Doing Detail engineering work of Fertilizer Plant with Kellog engineering Contractor.
- Doing Detail engineering work of LNG train G Plant with Kellog engineering Contractor.
- Attending a team organized by PT IKPT to revise engineering drawing (Pipe & Instrument Diagram) of Arun LNG plant at Indonesia
- Joining with Kellog Engineering Company to do basic engineering design of train H (LNG project) at Kalimantan, Indonesia
- Joining with Chiyoda Engineering Company to do detail engineering design of Sulfuric Acid Plant at East Java, Indonesia
- Joining with Kellog Engineering Company to do detail engineering design of train H (LNG project) at Kalimantan, Indonesia
- Proposal Project for onshore receiving facility
Activities :
- Preparing process description based on Licensor
- Preparing PFD, UFD
- Preparing Process Principles & Design Consideration
- Preparing Equipment List
- Preparing P&ID
- Doing Hydraulic Calculation, Relief valve sizing, Special Piping-Item, Sizing separator, pump, control valve, heat exchanger rating and etc.
- Checking Internal column vendor
- Preparing Pipeline Nomenclature
- Preparing Battery Limit Summary
- Preparing Flare network System
- Preparing Technical bid analysis of Vendor
- Checking water treatment & Utility water for BFW