MEP site Manager
Br. C.A.T. International Co. Ltd.
مجموع سنوات الخبرة :25 years, 5 أشهر
• Current project :
MARJAN DEVELOPMENT PROGRAM DOWNSTREAM PIPELINES PKG 18
• will provide a total of 6 new pipelines to transport sales gas, NGL and product from new facilities planned in Tanajib area, also to install new ignition system for 6 existing Burn pits,
• The pipes sizes included 48”, 36, 18, 14 and 6 “ with total length 700 Km, all the pipes are FBE coated
• Review the S.O.W including the technical requirements as per Aramco standard
• Review all the issue for construction drawings
• Prepare the works schedule
• Prepare the work plan in the site including R.O.W, pipe stringing, jeeping, welding activities, X-ray, internal and external coating, pipe lowering, backfilling
• Prepare the HDD packages ( Micro tunneling and HDD ) including the Geotechnical soil investigation reports, sections details and interference services
• Install the thrust anchors including piping for launcher and receiver scrapers
• Completed project
QATIF W-21 TO P-23 AXL TRUNKLINE
• will provide a total of new pipeline 16 “ with total length 12 Km
• Review the S.O.W including the technical requirements as per Aramco standard
• Review all the issue for construction drawings
• Prepare the works schedule
• Prepare the work plan in the site including R.O.W, pipe stringing, jeeping, welding activities, X-ray, internal and external coating, pipe lowering, backfilling
• Prepare the HDD packages including the Geotechnical soil investigation reports, sections details and interference services
• Install the thrust anchors including piping for launcher and receiver scrapers