Quality Control Engineer
AAW Consulting Engineers
Total years of experience :21 years, 0 Months
•Following up technical submittals and reports which related to materials.
• Following up as-build drawing with site engineer and consultant engineer.
• Inspection of all laboratory tests needed to be carried out related to conc. works
• Inspection of batch plant concrete mixing.
• Following up of casting concrete as per project specs and ACI requirements.
• Following Up of all Quality Control Inspector.
• Deal with the Sub-contract and consultant Q.C. Engineers.
• Deal with Laboratory Reports.
• Develop, Maintain, Monitor and continually improve a Quality management system
aligned with ISO 9001:2015 Standards.
• Build effective communication channels that voice all interested parties’ needs and
expectations.
• Continuously provide engineering services that meet and exceed Customer, Regulatory
and International requirements.
• Provide the full support and resources needed for the effective implementation of the
Quality Management system.
• Set, Maintain and Monitor Quality objectives as part of its QMS to ensure that the
quality management system can achieve its intended result(s), enhance desirable effects
and enhance customer satisfaction
• Following up technical submittals and reports which related to materials.
• Following up as-build drawing with site engineer and consultant engineer.
• Inspection of all laboratory tests needed to be carried out related to conc. works
• Inspection of batch plant concrete mixing.
• Following up of casting concrete as per project specs and ACI requirements.
• Following Up of all Quality Control Inspector.
• Deal with the Sub-contract and consultant Q.C. Engineers.
• Deal with Laboratory Reports.
• Develop, Maintain, Monitor and continually improve a Quality management system aligned with ISO 9001:2015 Standards.
• Build effective communication channels that voice all interested parties’ needs and expectations.
• Continuously provide engineering services that meet and exceed Customer, Regulatory and International requirements.
• Provide the full support and resources needed for the effective implementation of the Quality Management system.
• Set, Maintain and Monitor Quality objectives as part of its QMS to ensure that the quality management system can achieve its intended result(s), enhance desirable effects and enhance customer satisfaction.
• Following up technical submittals and reports which related to materials.
• Prepare method statement, ITP and checklists.
• Control and distribute documents.
• Maintain logs for submittals.
• Conduct inspections and submitting IR.
• Monitor tests with third party laboratory.
• Report non-conformance.
• Ensure work is done as per latest revision of approved (MS, ITP, SD).
• Material inspections (material submittal, MIRs, supplier approvals)
• Calibration of measuring instruments.
• Following up as-build drawing with site engineer and consultant engineer.
• Inspection of all laboratory tests needed to be carried out related to conc. works
• Inspection of batch plant concrete mixing.
• Following up of casting concrete as per project specs and ACI requirements.
• Following Up of all Quality Control Inspector.
• Reporting to operation manager for all quality control works.
• Deal with the consultant Q.C.
• Deal with Sub-contract Q.C.
• Following up technical submittals and reports which related to materials.
• Following up as-build drawing with site engineer and consultant engineer.
• Inspection of all laboratory tests needed to be carried out related to conc. works
• Inspection of batch plant concrete mixing.
• Following up of casting concrete as per project specs and ACI requirements.
• Following Up of all Quality Control Inspector.
• Deal with the Sub-contract and consultant Q.C. Engineers.
• Deal with Laboratory Reports.
• Inspection of repair works during construction (Structure & cosmetic).
• Inspection of all laboratory tests needed to be carried out related to conc. works
• Inspection of batch plant concrete mixing.
• Inspection of casting concrete as per project specs and ACI requirements.
• Following up technical submittals and reports which related to materials.
• Inspection of special finishing items Fixation; (Escalators, GFRC cladding panels, GRG panels, Curtain walls, Aluminum sub-frames, )
• Inspection of installation and erection of steel link bridge sections.
• Inspection of reinforcement after final installation as per approved drawing.
• Inspection of form work safety & stability as per design & shop drawing for two systems of form work (Doka & SGB)
• Replacement to quality control area manager when he was in vacation every year for two years.
• Quality control area manager replacement of area manager for one year.
• Inspection of reinforcement after final installation as per approved drawing.
• Inspection of form work safety & stability as per design & shop drawing for two systems of form work (Doka & SGB)
• Following all inspection of underground pipe diameter 2.5m
• Inspection Of (Infrastructure - Constriction Services Underground) after final installation as per approved drawing
• Inspection of repair works during construction (Structure & cosmetic).
• Inspection of all laboratory tests needed to be carried out related to conc. works
• Inspection of batch plant concrete mixing.
• Inspection of casting concrete as per project specs and ACI requirements.
• Following up technical submittals and reports which related to materials.
• Inspection of special finishing items Fixation; (Escalators, GFRC cladding panels, GRG panels, Curtain walls, Aluminum sub-frames, …)
• Inspection of installation and erection of steel link bridge sections.
• Inspection of reinforcement after final installation as per approved drawing.
• Following all inspection of underground pipe diameter 2.5m
• Inspection Of (Infrastructure - Constriction Services Underground ) after final installation as per approved drawing.
• Inspection of form work safety & stability as per design & shop drawing for two systems of form work (Doka & SGB)
• Inspection of repair works during construction (Structure & cosmetic).
• Inspection of all laboratory tests needed to be carried out related to conc. works
• Inspection of batch plant concrete mixing.
• Inspection of casting concrete as per project specs and ACI requirements.
• Following up technical submittals and reports which related to materials.
• Inspection of special finishing items Fixation; (Escalators, GFRC cladding panels, GRG panels, Curtain walls, Aluminum sub-frames, …)
• Inspection of installation and erection of steel link bridge sections.
• Inspection of reinforcement after final installation as per approved drawing.
• Following all inspection of underground pipe diameter 2.5m
• Inspection Of (Infrastructure - Constriction Services Underground) after final installation as per approved drawing.
• Inspection of form work safety & stability as per design & shop drawing for two systems of form work (Doka & SGB)
• Inspection of repair works during construction (Structure & cosmetic).
• Inspection of all laboratory tests needed to be carried out related to conc. works
• Inspection of batch plant concrete mixing.
• Inspection of casting concrete as per project specs and ACI requirements.
• Following up technical submittals and reports which related to materials.
• Inspection of special finishing items Fixation; (Escalators, GFRC cladding panels, GRG panels, Curtain walls, Aluminum sub-frames, …)
• Inspection of installation and erection of steel link bridge sections.
• Inspection of reinforcement after final installation as per approved drawing.
• form work (Doka & SGB)
• Inspection of repair works during construction (Structure & cosmetic).
• Inspection of all laboratory tests needed to be carried out related to conc. works
• Inspection of batch plant concrete mixing.
• Inspection of casting concrete as per project specs and ACI requirements.
• Following up technical submittals and reports which related to materials.
• Inspection of special finishing items Fixation; (Escalators, GFRC cladding panels, GRG panels, Curtain walls, Aluminum sub-frames, …)
• Inspection of installation and erection of steel link bridge sections.
• Inspection of reinforcement after final installation as per approved drawing.
• Inspection of form work safety & stability as per design & shop drawing for two systems of form work (Doka & SGB)
• Inspection of repair works during construction (Structure & cosmetic).
• Inspection of all laboratory tests needed to be carried out related to conc. works
• Inspection of batch plant concrete mixing.
• Inspection of casting concrete as per project specs and ACI requirements.
• Following up technical submittals and reports which related to materials.
• Inspection of special finishing items Fixation; (Escalators, GFRC cladding panels, GRG panels, Curtain walls, Aluminum sub-frames, …)
• Inspection of installation and erection of steel link bridge sections.
• Construction & civil work for EL SWEADY SCHOOL IN EL RIAD
• Responsible for finishing items (Raised floor, ceramic tiles, painting, etc. )
• Coordination with HVAC tasks.
• Coordination with plumbing tasks
• Coordination with Electrical tasks
• Construction for building work for plumbing
• Responsible for finishing item
• Inspected & received aluminum work from ALI co.
• Construction senior Eng. for (N W 5) building
• Construction & Civil work for Control, maintenance & warehouse building
• Responsible for finishing items (Raised floor, ceramic tiles, Painting, …. etc.)
• Coordination with HVAC tasks
• Coordination with plumbing tasks
• Coordination with Electrical tasks
Bachelor's degree in Civil Engineering, graduation project, water supply with distinction, and several projects in roads, traffic, concrete and metal facilities