Work Experience

Total years of experience :21 years, 0 Months

Quality Control Engineer at AAW Consulting Engineers
  • Saudi Arabia - Najran
  • My current job since May 2023

•Following up technical submittals and reports which related to materials.
• Following up as-build drawing with site engineer and consultant engineer.
• Inspection of all laboratory tests needed to be carried out related to conc. works
• Inspection of batch plant concrete mixing.
• Following up of casting concrete as per project specs and ACI requirements.
• Following Up of all Quality Control Inspector.
• Deal with the Sub-contract and consultant Q.C. Engineers.
• Deal with Laboratory Reports.
• Develop, Maintain, Monitor and continually improve a Quality management system
aligned with ISO 9001:2015 Standards.
• Build effective communication channels that voice all interested parties’ needs and
expectations.
• Continuously provide engineering services that meet and exceed Customer, Regulatory
and International requirements.
• Provide the full support and resources needed for the effective implementation of the
Quality Management system.
• Set, Maintain and Monitor Quality objectives as part of its QMS to ensure that the
quality management system can achieve its intended result(s), enhance desirable effects
and enhance customer satisfaction

Quality Control Manager at F S S: FIELD SUPPORT FOR OIL AND GAS SERVICE (MULTI WORKS CO. LTD.)
  • Saudi Arabia - Dammam
  • December 2022 to May 2023

• Following up technical submittals and reports which related to materials.
• Following up as-build drawing with site engineer and consultant engineer.
• Inspection of all laboratory tests needed to be carried out related to conc. works
• Inspection of batch plant concrete mixing.
• Following up of casting concrete as per project specs and ACI requirements.
• Following Up of all Quality Control Inspector.
• Deal with the Sub-contract and consultant Q.C. Engineers.
• Deal with Laboratory Reports.
• Develop, Maintain, Monitor and continually improve a Quality management system aligned with ISO 9001:2015 Standards.
• Build effective communication channels that voice all interested parties’ needs and expectations.
• Continuously provide engineering services that meet and exceed Customer, Regulatory and International requirements.
• Provide the full support and resources needed for the effective implementation of the Quality Management system.
• Set, Maintain and Monitor Quality objectives as part of its QMS to ensure that the quality management system can achieve its intended result(s), enhance desirable effects and enhance customer satisfaction.

Quality Control manager at LEEDS ECO, Nestle
  • Saudi Arabia - Khobar
  • January 2020 to May 2022

• Following up technical submittals and reports which related to materials.
• Prepare method statement, ITP and checklists.
• Control and distribute documents.
• Maintain logs for submittals.
• Conduct inspections and submitting IR.
• Monitor tests with third party laboratory.
• Report non-conformance.
• Ensure work is done as per latest revision of approved (MS, ITP, SD).
• Material inspections (material submittal, MIRs, supplier approvals)
• Calibration of measuring instruments.
• Following up as-build drawing with site engineer and consultant engineer.
• Inspection of all laboratory tests needed to be carried out related to conc. works
• Inspection of batch plant concrete mixing.
• Following up of casting concrete as per project specs and ACI requirements.
• Following Up of all Quality Control Inspector.
• Reporting to operation manager for all quality control works.
• Deal with the consultant Q.C.
• Deal with Sub-contract Q.C.

Quality Control MANAGER at AL Shshlawi int’l Holding Co
  • Saudi Arabia - Dammam
  • January 2016 to January 2020

• Following up technical submittals and reports which related to materials.
• Following up as-build drawing with site engineer and consultant engineer.
• Inspection of all laboratory tests needed to be carried out related to conc. works
• Inspection of batch plant concrete mixing.
• Following up of casting concrete as per project specs and ACI requirements.
• Following Up of all Quality Control Inspector.
• Deal with the Sub-contract and consultant Q.C. Engineers.
• Deal with Laboratory Reports.

Quality Control Manager at SAUDI OGER LTD
  • Saudi Arabia - Jeddah
  • February 2013 to January 2016

• Inspection of repair works during construction (Structure & cosmetic).
• Inspection of all laboratory tests needed to be carried out related to conc. works
• Inspection of batch plant concrete mixing.
• Inspection of casting concrete as per project specs and ACI requirements.
• Following up technical submittals and reports which related to materials.
• Inspection of special finishing items Fixation; (Escalators, GFRC cladding panels, GRG panels, Curtain walls, Aluminum sub-frames, )
• Inspection of installation and erection of steel link bridge sections.
• Inspection of reinforcement after final installation as per approved drawing.
• Inspection of form work safety & stability as per design & shop drawing for two systems of form work (Doka & SGB)
• Replacement to quality control area manager when he was in vacation every year for two years.
• Quality control area manager replacement of area manager for one year.

Senior QC Engineer at Consolidated Contractors International Company & Hassan Allam Sons
  • Egypt - Cairo
  • October 2012 to January 2013

• Inspection of reinforcement after final installation as per approved drawing.
• Inspection of form work safety & stability as per design & shop drawing for two systems of form work (Doka & SGB)
• Following all inspection of underground pipe diameter 2.5m
• Inspection Of (Infrastructure - Constriction Services Underground) after final installation as per approved drawing
• Inspection of repair works during construction (Structure & cosmetic).
• Inspection of all laboratory tests needed to be carried out related to conc. works
• Inspection of batch plant concrete mixing.
• Inspection of casting concrete as per project specs and ACI requirements.
• Following up technical submittals and reports which related to materials.
• Inspection of special finishing items Fixation; (Escalators, GFRC cladding panels, GRG panels, Curtain walls, Aluminum sub-frames, …)
• Inspection of installation and erection of steel link bridge sections.

Senior QC Engineer at Consolidated Contractors International Company & Hassan Allam Sons
  • Egypt - Cairo
  • October 2010 to October 2012

• Inspection of reinforcement after final installation as per approved drawing.
• Following all inspection of underground pipe diameter 2.5m
• Inspection Of (Infrastructure - Constriction Services Underground ) after final installation as per approved drawing.
• Inspection of form work safety & stability as per design & shop drawing for two systems of form work (Doka & SGB)
• Inspection of repair works during construction (Structure & cosmetic).
• Inspection of all laboratory tests needed to be carried out related to conc. works
• Inspection of batch plant concrete mixing.
• Inspection of casting concrete as per project specs and ACI requirements.
• Following up technical submittals and reports which related to materials.
• Inspection of special finishing items Fixation; (Escalators, GFRC cladding panels, GRG panels, Curtain walls, Aluminum sub-frames, …)
• Inspection of installation and erection of steel link bridge sections.

Senior QC Engineer at Consolidated Contractors International Company & Hassan Allam Sons
  • Egypt - Damanhur
  • June 2009 to October 2010

• Inspection of reinforcement after final installation as per approved drawing.
• Following all inspection of underground pipe diameter 2.5m
• Inspection Of (Infrastructure - Constriction Services Underground) after final installation as per approved drawing.
• Inspection of form work safety & stability as per design & shop drawing for two systems of form work (Doka & SGB)
• Inspection of repair works during construction (Structure & cosmetic).
• Inspection of all laboratory tests needed to be carried out related to conc. works
• Inspection of batch plant concrete mixing.
• Inspection of casting concrete as per project specs and ACI requirements.
• Following up technical submittals and reports which related to materials.
• Inspection of special finishing items Fixation; (Escalators, GFRC cladding panels, GRG panels, Curtain walls, Aluminum sub-frames, …)
• Inspection of installation and erection of steel link bridge sections.

Site Engineer at ORASCOM CONSTRUCTION INDUSTRIES & BESIX JV
  • Egypt - Alexandria
  • March 2008 to June 2009

• Inspection of reinforcement after final installation as per approved drawing.
• form work (Doka & SGB)
• Inspection of repair works during construction (Structure & cosmetic).
• Inspection of all laboratory tests needed to be carried out related to conc. works
• Inspection of batch plant concrete mixing.
• Inspection of casting concrete as per project specs and ACI requirements.
• Following up technical submittals and reports which related to materials.
• Inspection of special finishing items Fixation; (Escalators, GFRC cladding panels, GRG panels, Curtain walls, Aluminum sub-frames, …)
• Inspection of installation and erection of steel link bridge sections.

Inspection QC Engineer at SQUARE, SAN STEFANO GRAND PLAZA.
  • Egypt - Alexandria
  • March 2007 to March 2008

• Inspection of reinforcement after final installation as per approved drawing.
• Inspection of form work safety & stability as per design & shop drawing for two systems of form work (Doka & SGB)
• Inspection of repair works during construction (Structure & cosmetic).
• Inspection of all laboratory tests needed to be carried out related to conc. works
• Inspection of batch plant concrete mixing.
• Inspection of casting concrete as per project specs and ACI requirements.
• Following up technical submittals and reports which related to materials.
• Inspection of special finishing items Fixation; (Escalators, GFRC cladding panels, GRG panels, Curtain walls, Aluminum sub-frames, …)
• Inspection of installation and erection of steel link bridge sections.

Civil Project Engineer at AL KOAID ESTAPLISHMENT
  • Egypt - Alexandria
  • April 2006 to March 2007

• Construction & civil work for EL SWEADY SCHOOL IN EL RIAD
• Responsible for finishing items (Raised floor, ceramic tiles, painting, etc. )
• Coordination with HVAC tasks.
• Coordination with plumbing tasks
• Coordination with Electrical tasks

Civil Site Engineer at Moray & Reports
  • Egypt - Alexandria
  • June 2005 to April 2006

• Construction for building work for plumbing
• Responsible for finishing item
• Inspected & received aluminum work from ALI co.
• Construction senior Eng. for (N W 5) building

Civil Site Engineer at Misr Sons Development (Hassan Allam sons) / (HAS)
  • Egypt - Alexandria
  • November 2002 to June 2005

• Construction & Civil work for Control, maintenance & warehouse building
• Responsible for finishing items (Raised floor, ceramic tiles, Painting, …. etc.)
• Coordination with HVAC tasks
• Coordination with plumbing tasks
• Coordination with Electrical tasks

Education

Bachelor's degree, Civil Engineering
  • at Alexandria University
  • November 2002

Bachelor's degree in Civil Engineering, graduation project, water supply with distinction, and several projects in roads, traffic, concrete and metal facilities

Specialties & Skills

Monitoring
Certified Internal Auditor
System Safety
Oil and Gas
Team leadership, team communication and decision making
teamwork
Project Management Professional Preparation Course.
Internal Auditor Training Course ISO 9001-2008.
a guide person
Solving problems from the roots

Languages

English
Expert

Memberships

Saudi Council of Engineers
  • professional
  • February 2013

Training and Certifications

Construction Safety and Health from OSHA academy. (Certificate)
Internal Auditor Training Course ISO 9001-2015. (Certificate)
P M P (Training)
Training Institute:
OKAZ TRAINING ITSTITUTE
Duration:
36 hours

Hobbies

  • Stability, superiority and success
    Success in any project he joined, achieving the company's goals, and obtaining customer satisfaction