PROJECT ENGINEER / QA QC
INNOVATIONS UNLIMITED ME
مجموع سنوات الخبرة :9 years, 6 أشهر
PREPARING, SCHEDULING, COORDINATING, AND MONITORING ASSIGNED ENGINEERING PROJECTS.
PERFORMING QUALITY CONTROL TASKS ON BUDGETS, SCHEDULES, PLANS, AND PERSONNEL PERFORMANCE AND REPORTING ON THE PROJECT'S STATUS.,
COOPERATING AND COMMUNICATING WITH THE PROJECT MANAGER AND OTHER PROJECT PARTICIPANTS AND COLLABORATING WITH SENIOR ENGINEERS TO CREATE MORE EFFICIENT PROJECT METHODS AND TO MAINTAIN THE PROJECT'S PROFITABILITY, INTERACTING & COORDINATING WITH CLIENTS.
DESIGNING, MAINTAINING, INSTALLATING ELECTRICAL SYSTEMS ON RESIDENTIAL, COMMERCIAL BUILDINGS.
I PREPARED STEP BY STEP WRITTEN PLAN FOR QC PROCESS, ASSIGNING THE QUALITY CHECK PROCESS.
I PERFORMED TESTING ON PRODUCTS AND SERVICES. I IDENTIFIED REASONABLE QUALITY TARGETS BASED ON PRODUCT NEEDS.
I ENSURED THE PROCESS ARE DELIVERING THEIR INTENDED RESULTS, I WORKED/COMMUNICATED WITH ALL PARTIES THAT QUALITY OBJECTIVES ARE UNDERSTOOD AND APPLIED WITHIN THE ORGANIZATION.
I LEAD THE QUALITY CONTROL AND ASSURANCE OBJECTIVES ARE COMPLYING WITH ISO 9001 STANDARDS, TO ENSURE THE PROCESS ARE BEING CARRIED OUT AS PLANNED BY PERFORMING INTERNAL AUDITS.
I CARRIED OUT THE TECHNICAL REVIEW, APPROVAL AND PROCESS OF ALL TECHNICAL SUBMITTALS SUCH AS DRAWING, MATERIALS, METHOD STATEMENT, WORK PROCEDURES, ETC. FOR CONSTRUCT ABILITY AND CODE COMPLIANCE.
I MONITORED/REPORTED FACTORS IMPACTING ON THE PROGRESS, DEVIATION FROM ITP, METHOD STATEMENT, SPECIFICATION / DRAWING, INADEQUATE COORDINATION, LACK OF PROCEDURE / SPECIFICATION AND SURVEY REPORTS.
I INSTALLED, PERFORMED TESTING & COMMISSIONING ON LIGHTING CONTROL AND POWER SYSTEM, HV & MV, SWITCHGEAR/PANEL/CABLING, MDB, SMDB, DB, GENERATOR, TRANSFORMER, ATS, FIRE ALARM SYSTEMS, BMS, ICT, SECURITY SYSTEM, CCTV, AUDIO VISUAL SYSTEMS, SPS.