Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Nabil Elshabasy, QA/QC MANAGER

Nabil Elshabasy

QA/QC MANAGER·CONSOLIDATED CONTRACTORS INT’L Co. CCC

Qatar

Bachelor's degree, Engineering

Work experience

Total years of experience: 35 years, 5 months

QA/QC MANAGER

June 2007 - Present

CONSOLIDATED CONTRACTORS INT’L Co. CCC

Doha, Qatar

June 2007 - Present

Projects:
1. Design and Construction of Al Bustan Street North (P007 C7 P2); $800M. Includes: design and construction of 4 interchanges, 1 bridge, 8 underpasses and 7 flyovers, with 5.4 km expressway 4-lanes/direction, retaining walls, pedestrian/cycle paths, traffic signaling & signs, utilities, landscaping/ hardscaping, street lighting and micro tunneling works. Client: Public Work Authorities ASHGHAL /Consultant: PARSONS
2. LAUSAIL Commercial Boulevard CP07-C-1A (Road A3); $300M. Including Roadway structures, tunnel and FXH-LRT Station; including fire escape stairs, electrical rooms, storm water/fire pump rooms. Firefighting, plumbing, HVAC systems. Storm, Foul, Irrigation, and PW & 66KV networks. Consultant/PMCM: DORSCH/ PARSONS.
3. Qatar Faculty of Islamic Studies “QFIS”; $250M. A 55, 980m2 area, including classrooms, auditorium, exhibition space, offices, mosque, underground car park& 2 utility basements & landscape. Client/PMCM/Consultant: Qatar Foundation/ ASTAD/ Louis Berger.
4. New Doha Airport “NDIA”; CP27 Midfield Access System; $350M. Including taxi-lanes, 2 Traffic Tunnels, a Utility Tunnel, Aircraft PCC Aprons, Airfield Ground Lighting, 2 Electric SS. & Utilities. Consultant: Bechtel (OBI).

Company industry:
Construction & Building
Job role:
Quality Control

QA ENGINEER

March 2004 - May 2007

STEEL CO. OF ALEXANDRIA EZ

Alexandria, Egypt

March 2004 - May 2007

(EGYPT

Company industry:
Heavy Industry & Metallurgy
Job role:
Quality Control

Project Engineer

March 1998 - February 2004

STEEL CO. OF ALEXANDRIA EZ

Alexandria, Egypt

March 1998 - February 2004

(EGYPT

Company industry:
Heavy Industry & Metallurgy
Job role:
Quality Control

QA/QC ENGINEER

March 1997 - February 1998

ARAB CONTRACTORS CO

March 1997 - February 1998

PROJECT: DEKHIELA MERCHANDISE HARBOR PROJECT - \[50 MILLION U$D\]; Including:
•Concrete Block Quays (1200m long x 14m depth), and 1.9m depth coping beam. Breakwater (a lime stone mound protected by concrete blocks with coping beam of 7.5 m wide x 1 m thick).
•Gentry’s rail-track piles & beam.
•Large Paved Merchandise Areas (1200 x 150 m) & utilities.
Coordinate quality inspection program.
Control Production and Materials quality of Concrete & Asphalt batch plants.
Prepare of Method Statements and ITP’s of marine & civil works.
Prepare all QMS documents for the ISO-9002:1994 Standards Certifications.

Company industry:
Construction & Building
Job role:
Quality Control

PROJECT ENGINEER

November 1994 - February 1997

SUEZ OIL COMPANY- SUCO

November 1994 - February 1997

PROJECTS:
RAS FANAR OIL FIELD: Oil/Water Separation Basins, Pipelines & M&E Foundations,
ZIET BAY OIL FIELD: •Large Foundation of LPG Spheres
•Asphalt Airport Runway 3.0 Km & Passengers’ Shelter
•Road storm drainage culverts.
Coordinate and ensure progress of work activities against time schedule
Ensure works Quality conformance to specifications.
Review Sub-contractor’s submittals, claims, and invoices.

Company industry:
Oil & Gas
Job role:
Engineering

QC ENGINEER

October 1993 - October 1994

ENCORP INTERNATIONAL INC

October 1993 - October 1994

PROJECT: TORPEDO MAINTENANCE FACILITY, ALEXANDRIA; EGYPTIAN NAVY; \[5 Million U$D\].
Including Civil & building works of 4 torpedo maintenance buildings, roads rigid pavements and utilities. CONSULTANT/PMCM

Job role:
Quality Control

STRUCTURAL DESIGNER

June 1992 - September 1994

AL-HODA CONSULTING

June 1992 - September 1994

Structural analysis, Design and detailing of multistory residential buildings. Prepare BOQ’s and project specifications.

Company industry:
General Engineering Consultancy
Job role:
Engineering

QC ENGINEER

February 1991 - July 1993

Waste Water Consultants Group, WWCG

Alexandria, Egypt

February 1991 - July 1993

PROJECTS: EXPANSION & REHABILITATION OF ALEXANDRIA SANITARY DRAINAGE AND WASTEWATER FACILITIES; \[400 million USD\]. Including
•Wastewater treatment plants and solids handling facilities
•Concrete Clarifiers & Pump stations
•Electrical Substations

Company industry:
Civil Engineering
Job role:
Quality Control

Education

Alexandria University

January 1990

January 1990

Bachelor's degree, Engineering

Egypt

,

Skills

Problem Solving tools
Expert
Problem Solving tools
Expert
QUALITY
Expert
QUALITY
Expert
CONSULTING
Expert
CONSULTING
Expert
ISO 9001
Expert
ISO 9001
Expert
MATERIALS MANAGEMENT
Expert
MATERIALS MANAGEMENT
Expert
MICROSOFT WORKS
Expert
MICROSOFT WORKS
Expert
PROGRESS
Expert
PROGRESS
Expert
Construction
Expert
Construction
Expert

Languages

Arabic

Expert

English

Expert