Site Engineer
Hill International
Total years of experience :12 years, 9 Months
• Daily reporting of progress, non-compliance and delays in work to the Resident Engineer & Assistant Resident Engineer;
• Preparing the appropriate Construction Surveillance Report;
• Monitoring of civil works, deep excavation, forepoling & excavation for NATM and bored tunneling (TBM) activities and identifies issues and preparing appropriate technical reports;
• Soil and rock condition monitoring and face mapping verification during the progress of deep excavation.
• Site monitoring and verification for drilling and grouting for rock bolting and shotcreting compliance for deep excavation.
• Conducting job site inspections, site surveillance and dealing with the contractor’s representative on a daily basis;
• Closely monitoring contractor’s activity based on the approved requirements;
• Identifying and highlighting possible risk on project;
• Accurately inventorying the job site and helping to ensure that the materials are properly maintained;
• Monitoring, evaluating and helping to ensure that all work is being carried out safely;
• Implementing technical and safety requirements on the project;
• Review Contractor’s Quality documentation prior the commencement of Works;
• Review Contractor ITP to identify Inspection & Testing monitoring activities (Personnel required; frequency; Hold, witness and surveillance points)
• Review quality records and certifications and ensure records they maintained and ready available;
• Perform independent auditing, surveillance and observations and provide technical Construction Surveillance Report
• I served as the Building and Structure Engineer for tunnels and underground stations;
• I was responsible for leading and providing guidance to a number of building and structure maintenance team leaders and subcontractors;
• Carry out all level of preventive and corrective maintenance activities and minor modification in building structure for stations and tunnels;
• My duties included planning and allocating resources to all aspect of maintenance activities on a day-to-day basis;
• Following the appropriate procedure and work instruction of maintenance to help ensure compliance to the requirements;
• Assisting subordinates with job familiarization and providing training and assessment where required.
• I was tasked with assisting the Building and Structure Manager in maintenance planning and program structural inspections;
• Providing guidance to Building and Structure Inspectors to maintain accurate records of structural inspection analysis, work accomplished and other information using a computerized maintenance management system;
• Carrying out 24-hour on-call responsibility for incidents and emergency within my section;
• Assisting the Building and Structure Manager or other technical support staff to implement complex systems or new projects.
• I am helping to ensure that the maintenance tools and equipment are in good condition and calibrated;
• Performing and carrying out duties as instructed/directed by the Line Manager;
• Performing shift and emergency duties when required.
• I was also conducting performance review, disciplinary and grievance for Building and Structure Inspectors and Building and Structure Maintenance Team Leaders;
• Preparing work instructions for tunnel structure preventive and corrective maintenance;
• Conducting inspection and investigation for safety critical works;
• Reviewing and submitting technical inspection report of tunnels and underground station prior to client review.
• I was responsible for observing and implementing the company Quality Policy, Safety Policy and regulations;
• Following rules and regulations for an effective realization of the Quality and Company Objectives;
• Final inspection before inviting the client.
• My duties included preparing reports as per guideline set in the approved Project Quality Plan;
• Raising Non-Conformance Report (NCR) on site;
• Helping to ensure segregation of non-conforming and rejected items and helping to ensure the disposal of rejected items;
• Resolving issues, if any, with respect to items received at site.
• I was tasked with preparing weekly Quality Control (QC) activity report for Quality Health, Safety and Environmental (QHSE) Manager;
• Helping to ensure closure of raised NCR by the client;
• Reviewing and understanding all approved Method Statement (MS), Inspection and Test Plan (ITP) and approved shop drawing.
• I was also conducting quality toolbox as per site requirements;
• Conducting Internal Quality Audit prior to external audit;
• Maintaining proper documentation of records and logs;
• Understanding ISO 9001:2008 Standard Requirements, QA/QC procedure and involved in implementation.
• I was responsible for observing and implementing the company Quality Policy, Safety Policy and regulations;
• Following rules and regulations for an effective realization of the Quality and Company Objectives;
• Final inspection before inviting the client.
• My duties included preparing reports as per guideline set in the approved Project Quality Plan;
• Raising Non-Conformance Report (NCR) on site;
• Helping to ensure segregation of non-conforming and rejected items and helping to ensure the disposal of rejected items;
• Resolving issues, if any, with respect to items received at site.
• I was tasked with preparing weekly Quality Control (QC) activity report for Quality Health, Safety and Environmental (QHSE) Manager;
• Helping to ensure closure of raised NCR by the client;
• Reviewing and understanding all approved Method Statement (MS), Inspection and Test Plan (ITP) and approved shop drawing.
• I was also conducting quality toolbox as per site requirements;
• Conducting Internal Quality Audit prior to external audit;
• Maintaining proper documentation of records and logs;
• Understanding ISO 9001:2008 Standard Requirements, QA/QC procedure and involved in implementation.
• I was responsible for auditing subcontractors and suppliers to verify that the Quality requirements of project are met;
• Assisting QA/QC Manager to evaluate the capabilities of subcontractors and suppliers to meet the contract requirements;
• Investigating and reporting all non-conformances and raising Non-Conformance Report (NCR) as necessary;
• My duties included implementing proper material testing requirement and quality control policies;
• Undertaking quality inspection of work in progress and completed works in substructure and superstructure for viaducts;
• Monitoring and inspection of civil works, deep shaft excavation, roadwork, site investigation and instrumentation;
• Maintaining register of all testing equipment and information on calibration and maintenance status of each items;
• I was tasked with rebar cage, cast-in accessories, pre-concreting inspection of tunnel precast production;
• Monitoring of chamber temperature and steam curing system are working properly;
• Performing surface inspection of de-moulded precast prior to application of waterproofing and protective coat.
• I was performing on-site inspection of bored tunnel (TBM) excavation and verifying actual alignments of installed precast are within the tolerance;
• Visual checking if cracks occurred after erection of segmental precast;
• Coordinating Inspection Request with The Engineer/Supervising Consultant on receipt from the responsible site and system staff,
• Initiating logs and registers;
• Monitoring, investigating and inspecting repair works including chemical injections for leak repair, caulking where leakages are determined in tunnel segment joint.
• I was responsible for the familiarization with the contract scope of works, drawings and specification of the project.
• My duties included coordinating the gathering of material samples for testing, as required, and the testing of said materials,
• Monitoring and reporting the test result, and checking if they comply with the requirements;
• Inspection of installation and erection by Field Operations to help ensure compliance to the “Approved for Construction” contract drawing and specification;
• Inspecting the quality of work done is in compliance to the contract drawings and specification and for the purpose of progress billing evaluation.
• As Quality Control personnel, I was given the authority to stop a portion or part of ongoing works in case of non-compliance to the plans and specification as well as reject materials delivery in case of non-compliance and/or lack of document to support the material test inspection requirement.
• I was tasked with receiving Inspection Requests (IRs) in coordination with operation team for quality of work on-site;
• Providing quality control for deliveries and acquisition of construction materials, proper handling and utilization on the field and site coordination;
• I was also preparing accomplishment report for monitoring purposes; Rectification of snag list and supervision;
• Joint inspection and validation with the consultant and the client for handling over of the project
• As Project Engineer, I was responsible for quantity take-off of materials and assessment of new work orders from Maynilad Water Services, Inc. (MWSI).
• My duties included preparing accomplishment report, material inventory report and project monitoring report;
• Conducting field inspection, quality control and evaluation of on-going projects;
• Attending meetings and coordinating with MWSI whenever necessary;
• Performing other tasks, as directed by immediate superior.
• As Office Engineer, I was responsible for reviewing plans, specifications and other project documents;
• Preparing monthly and contract inventory as a MWSI contractor;
• Preparing bid documents and performing other duties as assigned.