(SCADA) Control Room Operator
Veolia (GOES)
Total years of experience :7 years, 10 Months
Operation Monitoring - Watching gauges, dials, or other indicators to make sure a machine is working properly.
• Independently operated, monitored and maintained water treatment plant. Detected and isolated breaks in the system.
• Operated water filtration equipment, open and closed valves, and water lines.
• Added chemicals such as alum, potassium permanganate, and fluoride.
• Checked traveling screen to remove debris from trough to eliminate clogging.
• Received incoming complaints from citizens regarding their utilities and take the necessary steps to correct the problem
• Maintained Water treatment plant facility as well as sites inside the city limits.
• Controlled well motor RPM's to maintain system pressure. Disinfected water at wellhead using chloramines.
• Adjusted chemical chloramine, ammonia, and polymer feed accordingly to ensure proper disinfection of water.
• Calibrated field and office testing equipment each shift.
• Gathered and tested samples throughout the water system to ensure that the state-mandated chlorine residual was met at each point in the system.
• Monitored of system-wide tank levels, pump statuses, and line pressure
• Complex Problem Solving - Identifying complex problems and reviewing related information to develop and evaluate options and implement solutions.
Job Responsibility:
• Operation Monitoring - Watching gauges, dials, or other indicators to make sure a machine is working properly.
• Independently operated, monitored and maintained water treatment plant. Detected and isolated breaks in the system.
• Operated water filtration equipment, open and closed valves, and water lines.
• Added chemicals such as alum, potassium permanganate, and fluoride.
• Checked traveling screen to remove debris from trough to eliminate clogging.
• Received incoming complaints from citizens regarding their utilities and take the necessary steps to correct the problem
• Maintained Water treatment plant facility as well as sites inside the city limits.
• Controlled well motor RPM's to maintain system pressure. Disinfected water at wellhead using chloramines.
• Adjusted chemical chloramine, ammonia, and polymer feed accordingly to ensure proper disinfection of water.
• Calibrated field and office testing equipment each shift.
• Gathered and tested samples throughout the water system to ensure that the state-mandated chlorine residual was met at each point in the system.
• Monitored of system-wide tank levels, pump statuses, and line pressure
• Complex Problem Solving - Identifying complex problems and reviewing related information to develop and evaluate options and implement solutions.
Two Year's of rich experience "IT Support and Hardware maintenance" Department agent Banking Job Dutch-Bangla bank, agent banking division.
- Familiar with IT ERP system Oracle SAP.
- Analyzing the business requirement of all departments connects Bank Server.
- Purchase efficient and cost-effective technological equipment and software.
- Maintenance all Hardware.
- Experience in analysis, implementation, and evaluation of IT systems and their specifications.
- ICT Trainer and review all work.
- Server maintenance and update all content.
- service and maintenance PC & lap-top.
MAJOR SUBJECT:- ELECTRICITY TESTING PLC, NETWORKING COMPUTER HARDWARE.
URL removed due to policy violation. Please contact support for further information.