VINAY LOKESH, Planning Engineer

VINAY LOKESH

Planning Engineer

Yashaswi Engineering Consultant Pvt. Ltd.

Location
India
Education
Bachelor's degree, Civil Engineering
Experience
12 years, 3 Months

Share My Profile

Block User


Work Experience

Total years of experience :12 years, 3 Months

Planning Engineer at Yashaswi Engineering Consultant Pvt. Ltd.
  • India - Tumkur
  • My current job since February 2021

• Project planning, baseline scheduling, monitoring, tracking, and reporting activities. Analyses and reports project economics including costs, operational budgets, staffing requirements, resources, and risk
• Prepare the project-wide master program reflecting the project phasing and packaging strategy and including engineering procurement construction handing over the project
• Track the delivery of long-lead materials into stage-wise requirements at the site, highlighting the priority of materials to the Project Manager, as per the agreed schedule
• Establish the delay analysis by capturing the delay analysis, notification and EOT claim accurately in line with the project requirements
• Prepare the Look-ahead schedules, KPI tracker, and progress updates based on the QC approval
• Setup presentation of the Progress updates, including Schematic layout illustration
• Collate and analyse reports from the site team to ensure that delays, stoppages, constraints, and deviations are being recorded in line with the project requirements
• Monitor and analyze Earned Value and associated Key Performance Indicator

Production Planning Engineer at Energy Technical Services WLL
  • Qatar - Doha
  • October 2019 to December 2020

• Project planning, baseline scheduling, monitoring, tracking, and reporting activities. Analyses and reports project economics including costs, operational budgets, staffing requirements, resources, and risk
• Prepare the project-wide master program reflecting the project phasing and packaging strategy and including engineering procurement construction handing over the project
• Track the delivery of long-lead materials into stage-wise requirements at the site, highlighting the priority of materials to the Project Manager, as per the agreed schedule
• Establish the delay analysis by capturing the delay analysis, notification and EOT claim accurately in line with the project requirements
• Prepare the Look-ahead schedules, KPI tracker, and the progress updates based on the QC approval
• Setup presentation of the Progress updates, including Schematic layout illustration
• Collate and analyse reports from the site team to ensure that delays, stoppages, constraints, and deviations are being recorded in line with the project requirements
• Monitor and analyse Earned Value and associated Key Performance Indicator

Production Planning Engineer at BCIM Engineering Pvt. Ltd.
  • India - Tumkur
  • January 2018 to December 2019

• Track and monitor major equipment
• Participate in project meetings and discussions with the clients as required
• Assists in preparing work program, cash flow, manpower histogram, S- Curve
• Manpower and equipment deployment chart
• Develop variance analysis and responsibility float consumption
• Reflect change order scope on schedule and perform variance analysis
• Link and modify linkages of proper sequence in planning software
• Track and monitor project manpower levels to include direct, indirect, support, and idle
• Assign cost components and cost types to create graphs to illustrate actual performance and project status
• Package the project into the scope of work
• Develop levels1 to 7 of the schedules
• Prepare weekly/monthly look-ahead plan, progress schedule, recovery plan, and accelerate plans

Production Planning Engineer at Al Khalili Construction LLC
  • Oman - Muscat
  • May 2017 to December 2017

• Preparing the master program reflecting the project phasing and packaging strategy and including procurement, construction, commissioning, and handing over
• Update the program (baseline vs. updates), including cost and resource loading
• Demonstrable track record in the delivery of large multidisciplinary projects.
• Monitor construction progress and analyze earned value
• Prepare weekly and monthly reports and report to the project control manager any deficiency or non-compliance
• Attend weekly progress meetings and monthly meetings and participate in preparing the agenda
• Review and assess time aspects for extension of time claims
• Report weekly/monthly progress along with delays/slippages and provide resolution
• Monitor the status of all purchases and invoicing and delivery up to the closure of the project

Planning Engineer at Yashaswi Engineering Consultant Pvt. Ltd.
  • India - Tumkur
  • May 2014 to May 2017

• Prepared a detailed program of works in accordance with contract key dates
• Developed work breakdown structure and defined work packages and coding of the scheduled activity
• Identified and managed all interface, milestones, and major activities, the relationship between activities, and created budget estimates
• Coordinated in preparation of drawing submission schedule and followed up the delivery material as per the schedule

Site Engineer at M/s Karnataka Test House Pvt. Ltd.
  • India - Chitradurga
  • January 2013 to May 2014

• Collected the soil samples from the project intended site using bores and test pits
• Conducted laboratory testing performed as per the relevant part of IS 2720
• Performed geotechnical analysis and study to assess construction sites based on substructure conditions revealed from field investigation

Site Planning at M/s Larsen and Turbo Ltd.
  • India - Tumkur
  • February 2012 to December 2012

• Worked as a Site Engineer for a service provider of water and sewage projects- UGD construction works, municipal
• Managed supervision of civil works which involve excavation of trenches for laying water pipes, construction of break pressure tanks

Education

Bachelor's degree, Civil Engineering
  • at Belgam
  • July 2012

B.E. (Civil Engineering) Sir MVIT College (Bangalore), VTU (Belgaum University), Karnataka

High school or equivalent, kannada, hindi
  • at University Of Florence
  • January 2010

A grade

Diploma, PCMB
  • at SCHRADRI PURAM
  • January 2004

80 %

Specialties & Skills

AutoCAD 2D
microsoft project
Primavera P6
Schedule Planning
Planning Engineer
Microsoft Project (MSP)
AutoCAD
E Survey Softest
Oracle Primavera P6- PPM & EPPM
MS Office

Languages

English
Expert
Hindi
Expert
Kannada
Expert
Arabic
Beginner

Memberships

ETS WLL
  • PLANNING ENGINEER
  • November 2019

Training and Certifications

5.E SURVEYING Certification of Appreciation (Certificate)
4.E SURVEYING Certificate (Certificate)
3.National Employable Skill Certificate (Certificate)
2.Auto Cad Certificate (Certificate)
1.Master Diploma in Project Planning and Management certificate (Certificate)

Hobbies

  • Singing
    OK
  • REEDING
    SOMETIME
  • Dancing
    GOOD