Ahmed Osman, Package Manager

Ahmed Osman

Package Manager

SNC LAVALIN

البلد
الإمارات العربية المتحدة - دبي
التعليم
بكالوريوس, Civil Engineering
الخبرات
21 years, 2 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :21 years, 2 أشهر

Package Manager في SNC LAVALIN
  • الإمارات العربية المتحدة - أبو ظبي
  • أشغل هذه الوظيفة منذ أكتوبر 2015

Project: WEST QURNA I PROJECT - INITIAL OIL TRAIN (100 barrels of oil per day) Client: ExxonMobil Iraq Limited (EMIL)

Equipment/Packages:
- Dehydrator & Desalter Packages (Dehydrator/Desalter Vessels, Internal grids/Headers, Power units, mixing valves, LCPs).
- Inlet Separators, 2nd stage separators, LP Separator, Drums & Filters.
- 10 Heat Exchangers (S&T and Harbin).
- Hot Oil Heater Package, Air Coolers, Flare, IA Package.
- 17 Process skids
- Centrifugal pumps
- MCC/Control Room, LER, PCS…etc.

Working as a Package Manager with the following basic responsibilities:
1. Assumes leadership role on project execution team in supportive manner
2. Attains full knowledge of project scope, contractual obligations, budget and schedule
3. Prepares Project Execution Plan in coordination with the project execution team
4. Serve as one of the primary customer contact for the duration of project through commissioning and startup
5. Coordinates technical and contractual interpretations as required, provides alternate solutions and assists in debottlenecking
6. Coordinate project designs for IOT project utilizing engineering staff and subcontractors.
7. Resolve specification issues, handle correspondence, provide periodic updates, ensure customer satisfaction, and negotiate / coordinate with staff as appropriate
8. Translate customer needs / requirements into detailed project plans while driving internal execution to meet project targets
9. Support and coordinate with interfacing organizations such as the global engineering team, product line management, process engineering, procurement, operations management, and manufacturing.
10. Identify resources and requirements, assigned responsibilities and coordinated with project staff directly and indirectly to ensure successful completion of project.
11. Provides regular feedback to the management team on project status and improvement opportunities
12. Conducts internal and customer kick off meetings. Participates in departmental meetings - Engineering, Procurement, Manufacturing and Project Controls and client meetings.
13. Monitors project progress and budget during detailed engineering, procurement, manufacturing, construction and commissioning.

14. Directly supervise & manage fabrication of all process equipment, skids and packages to ensure on time/budget/quality completion
15. Supervise and coordinate procurement, expediting & logistic of all equipment, packages and loose materials from bidding stage, purchase order till successful delivery of all items.
16. Develop progress reports (weekly/monthly/yearly).
17. Ensures that the project execution team and the client adhere to project schedule.
18. Trace and resolved critical issues to minimize project risk factors
19. Monitors and controls project scope changes closely by documenting and communicating the cost and schedule impact to the client in timely fashion
20. Stay updated on project financials - milestone invoicing and cash flow situation
21. Perform risk assessment and suggests mitigations plans
22. perform critical path analyses
23. Monitoring physical process of Engineering/Procurement/Manufacturing/Construction/Installation/CCMS/Commissioning.
24. Control of construction reports, construction cost and resources
25. Maintains safe and clean working environment by enforcing procedures, rules, and regulations.
26. Maintains product and company reputation by complying with federal and state regulations.
27. Monitoring “Punch List” creation and close out.
28. Control and supervision of HSE specific actions
29. Contributes to team effort by accomplishing related results as needed.
30. Conducts project close out and lessons learn meeting

Senior Project Engineer في Exterran Energy
  • الإمارات العربية المتحدة - دبي
  • يوليو 2007 إلى أغسطس 2015

Working as a Senior Project Engineer with the following basic responsibilities:
1. Assumes leadership role on project execution team in supportive manner
2. Develops project objectives by reviewing project proposals and plans; conferring with management.
3. Determines project responsibilities by identifying project phases and elements; assigning personnel to phases and elements; reviewing bids from contractors.
4. Determines project specifications by studying product design, customer requirements, and performance standards; completing technical studies; preparing cost estimates.
5. Prepare Project Execution Plan in coordination with the project execution team
6. Conducts internal and customer kick off meetings. Participates in departmental meetings - Engineering, Procurement, Manufacturing and Project Controls and client meetings.
7. Determines project schedule by studying project plan and specifications; calculating time requirements; sequencing project elements.
8. Maintains project schedule by monitoring project progress; coordinating activities; resolving problems.
9. Controls project plan by reviewing design, specifications, and plan and schedule changes; recommending actions.
10. Coordinates technical and contractual interpretations as required, provides alternate solutions and assists in debottlenecking
11. Controls project costs by approving expenditures; administering contractor contracts.
12. Ensures that the project execution team and the client adhere to project schedule.
13. Provides regular feedback to the management team on project status and improvement opportunities
14. Stays updated on project financials - milestone invoicing and cash flow situation
15. Leads the monthly project review with senior management
16. Performs risk assessment and suggests mitigations plans
17. performs critical path analyses
18. Establishment and implementation of site setup and site organization in line with contractual stipulations
19. Monitoring physical process of construction/installation and commissioning
20. Control of construction reports, construction cost and resources
21. Maintains safe and clean working environment by enforcing procedures, rules, and regulations.
22. Maintains product and company reputation by complying with federal and state regulations.
23. Monitoring “Punch List” creation and close out.


24. Control and supervision of HSE specific actions
25. Contributes to team effort by accomplishing related results as needed.
26. Conducts project close out and lessons learnt meeting

Major Project Handled:
Gas Conditioning Units (Garadagh&Galmaz Underground Gas Storage facilities) - Azerbaijan (2014/2015)
Client: Compra Energy/Nobel Oil.
Details: Design, Procurement, Manufacturing & Testing of:
- Garadagh: 20MM m3/day Low Temperature Condensation (LTC) System.
- Galmaz: 12MM m3/day Low Temperature Condensation (LTC) System.

Seplat Amukpe Compression Station - Nigeria (2014)
Client: Seplat Petroleum Development Company PLC.
Details: design, Procurement, fabrication, construction, commissioning, startup and operation of Amukpe Compression Station to compress and discharge 16.2MMscfd of associated gas at 1190 Psig overall peak capacity.

PDIL Makori Project - Pakistan (2012/2013)
Client: Presson Descon International (Pvt) Limited
Details: 158.4 MMSCFD Gas Processing Facility - Makori GPF

SHELL Majnoon -Iraq (2010/2011)
Client: Petrofac/Shell
Details: Design, Procurement, Manufacturing, Testing & Pre-commissioning of:
- Early Production system comprising two trains each with capacity for 50, 000 barrels of oil per day
Equipment/Packages:
- Dehydrator & Desalter Packages (Dehydrator/Desalter Vessels, Internal grids/Headers, Power units, mixing valves, LCPs).
- Inlet Separators, 2nd stage separators, Heat Exchangers
- Hot Oil Heater Package, Air Coolers
- 29 Process skids

Project Engineer في The National Company for Mechanical & Electrical Works–KHARAFI NATIONAL (KN)
  • الكويت - الكويت
  • ديسمبر 2006 إلى يونيو 2007

Job Description: Working as a Project Engineer in ETHYLENE GLYCOl-2 Project, Kharafi National (KN) - with the following basic responsibilities:

1. Determines project specifications by studying product design, customer requirements, and performance standards; completing technical studies; preparing cost estimates.
2. Prepare Project Execution Plan in coordination with the project execution team
3. Conducts internal and customer kick off meetings. Participates in departmental meetings - Engineering, Procurement, Manufacturing and Project Controls and client meetings.
4. Determines project schedule by studying project plan and specifications; calculating time requirements; sequencing project elements.
5. Maintains project schedule by monitoring project progress; coordinating activities; resolving problems.
6. Controls project plan by reviewing design, specifications, and plan and schedule changes; recommending actions.
7. Coordinates technical and contractual interpretations as required, provides alternate solutions and assists in debottlenecking
8. Controls project costs by approving expenditures; administering contractor contracts.
9. Ensures that the project execution team and the client adhere to project schedule.
10. Provides regular feedback to the management team on project status and improvement opportunities
11. Stays updated on project financials - milestone invoicing and cash flow situation
12. Leads the monthly project review with senior management
13. Identifies variance and initiate change orders as required
14. Performs risk assessment and suggests mitigations plans
15. performs critical path analyses
16. Establishment and implementation of site setup and site organization in line with contractual stipulations

Project Engineer في The Petroleum Projects and Technical Consultations Co. (PETROJET)
  • مصر - القاهرة
  • مارس 2003 إلى ديسمبر 2006

Major Clients: Uhde, Petrobel, Gupco, Khalda, BP, QPC, BG, Hanover, Enppi

Job Description: Working as a Project Engineer in Central workshop at kattamia- Cairo where the mechanical static equipment is fabricated (Vessels, Towers, Heat Exchanger, Air Coolers, Steel Structure, Piping Works & Skids…etc.)With the following basic responsibilities:

17. Develops project objectives by reviewing project proposals and plans; conferring with management.
18. Determines project responsibilities by identifying project phases and elements; assigning personnel to phases and elements; reviewing bids from contractors.
19. Determines project specifications by studying product design, customer requirements, and performance standards; completing technical studies; preparing cost estimates.
20. Confirms product performance by designing and conducting tests.
21. Acquires full knowledge of contractual schedule obligations
22. Establishes baseline integrated project schedule detailing the Engineering, Procurement, Manufacturing and Logistics activities
23. Coordinates with Engineering, Procurement, Manufacturing and Logistics for schedule updates identifying slippages, performs critical path analyses, effectively communicates the issues and concerns with the PMT, assists PMT for developing mitigation plans
24. Tracks and measures project progress
25. Reports periodic status on earned value, resource allocation, S-curves, critical path
26. Issues 30 day look ahead for priority follow up
27. Compiles and issues monthly project progress report

الخلفية التعليمية

بكالوريوس, Civil Engineering
  • في Faculty of Engineering, Cairo University
  • يوليو 2002

Last Year Grade: Good, Gradation Project: Coastal and Harbour Engineering, Project Grade: Very Good

Specialties & Skills

Managerial Experience
Reporting Skills
Microsoft Office
Management Control
Planning
CUSTOMER RELATIONS
CONSULTING
ENGINEERING
LOGISTICS
MECHANICAL
MICROSOFT WORKS
PROCUREMENT
Management

اللغات

العربية
متمرّس
الانجليزية
متمرّس

التدريب و الشهادات

CPM (Certified Project Manager) (تدريب)
معهد التدريب:
Certificate from PMLG USA (Project Management Leadership Group)
تاريخ الدورة:
May 2008
المدة:
48 ساعة
• Completed People Leadership Development Program (PLDP) Training from LHH-Knightsbridge in May 2017 (تدريب)
معهد التدريب:
• Completed People Leadership Development Program (PLDP) Training from LHH-Knightsbridge in May 2017
تاريخ الدورة:
May 2017
المدة:
24 ساعة
Ongoing PMP certification exam process (تدريب)
معهد التدريب:
PMLG Dubai.
تاريخ الدورة:
April 2017

الهوايات

  • Football, reading, swimming