الخبرة العملية

مجموع سنوات الخبرة :26 years, 7 أشهر

Independent Consultant / freelance في Own
  • المكسيك - Monterrey
  • أشغل هذه الوظيفة منذ سبتمبر 2022

Client: Grupo GP SA de CV - (Sept 2022 - March 2023)
Construction consulting, specification development, project management and PCA inspections. For the following clients:
Fibra Uno -(October 2022 - December 2022)
- Portfolio Assessment for PCAs
SER Construction Consulting - (Noviembre 2022 - Enero 2023)
- Portfolio Assessment for PCAs
E-ECOTEC (Sept 2022- March 2023)
- Technical Advice on Construction Processes
- Elaboration of PCAs
MSRG - (Sept 2022-Nov 2022)
- Property Investigation for Development
- Evaluation of Construction Companies
- Basic Evaluation of Industrial Warehouses
Brick Walling - (Sept 2022 - Nov 2022)
- Evaluation of Construction Companies
Grupo GP SA de CV - (Jun 2020 to date)
- Consulting in International Arbitration (in process)
- Negotiations with Michelin Mexico
MORGAR SA de CV - (Sept 2019 - June 2020)
- Johnson Controls, building analysis. Studies
- Prologis Mantenimientos logistic study and plan
GIN Partners SA de CV - (Sept 2019 - July 2020)
- Development of administration system for small to
medium construction companies.
- Market promotion method
- Consulting for international distribution of roofing and
coating systems.
- Process to become a distributor of TPO coating systems
(Carlisle).
Project Type: General Construction Consulting.

Construction Project Director في Grupo GP
  • المكسيك - Monterrey
  • سبتمبر 2017 إلى سبتمبر 2022

Client: Grupo GP SA de CV - (Sept 2017 - Sept 2022)
Position: Project Director / Freelance Consultant
Projects:
- Consulting in International Arbitration (in process)
- Closure of the first phase of the Terminal 2 project at Los Cabos International Airport
- Project closure negotiations with Michelin Mexico
- Advice on the pre-construction phase of the SILICA II project. Grove, San Pedro Garza Garcia, NL
- Detection of project deviations and recovery plans for the Michelin plant project, León Gto.
- Detection of project deviations and recovery plans for the BMW plant project, San Luis Potosí, SLP

National Construction Manager في VERTEX Consulting Engineers S de RL de CV
  • المكسيك - Monterrey
  • فبراير 2016 إلى سبتمبر 2017

National Construction Manager (Mexico, CA and the Caribbean) for VERTEX Ingenieros Consultores S de RL de CV, a subsidiary of VERTEX Engineering of Boston MA, USA
Activities:
-Review and preparation of inspection proposals
-PCA inspections according to ASTM E2018 throughout the Mexican territory
-Phase I inspections throughout the Mexican territory
-Analysis of proposals for tentative projects
-Periodic inspections of various projects (hotel, industrial, commercial, etc.)
-Value opinions on industrial properties mainly
-Feasibility analysis for projects
-Among many other activities

Senior Site Manager في Thyssenkrupp Industrial Solutions
  • المكسيك - Garcia
  • نوفمبر 2014 إلى مايو 2015

Senior Site Manager in the construction of a chlorine production plant in García
analysis and review of the project, detection of deviations, creation of recovery plans, recovery of the construction schedule, the scope of the consultant contract was to the point of putting the project on schedule and establishing actual project completion dates

PDS Director في Jones Lang LaSalle
  • المكسيك - San Pedro Garza Garcia
  • فبراير 2004 إلى نوفمبر 2014

PDS Director with
Participates in the design and construction of industrial and commercial projects for: Whirlpool, Motorola, IR, Schlage, Solectron, KBR, Ban Bajío, among many others:
-Advice to the client from the conceptual phase of the project
-Development of the project both in design and in its executive part
-Development of specifications
-Management of the bidding process
-Management of the construction phase until its closure and delivery
-Inspection and evaluation of buildings PCA method ASTM E2018
-Development of industrial parks
-investigation of feasibility and feasibility of projects
-Opinions of property value
-Among many other activities

Site Project Manager في COPERION / PYCOSA
  • المكسيك - Altamira
  • نوفمبر 2002 إلى فبراير 2004

Project Manager of several projects in the Port of Altamira, including the construction of a concrete “Pit” for the railway of the PTA loading and unloading system for M&G PECTEN; installation of 16 aluminum silos for BASF's New Styrolux Plant as well as the manufacture and installation of stainless steel pipe pneumatic systems (for its raw material conduction system).

Senior Project Manager في ECM International
  • المكسيك - San Pedro Garza Garcia
  • مايو 1996 إلى ديسمبر 2001

Management of the construction project of industrial facilities that include Vitromex, CAPCON, Johnson Controls, Thompson Consumer Electronics, Steel Works, Caterpillar, CITATION, GE, LG Electronics, Kohler, located in Saltillo, Cd. Juárez, Mexicali, Monterrey and Reynosa

الخلفية التعليمية

دبلوم, Basic And Human Sciences
  • في Centro Vida y Salud Integral
  • ديسمبر 2013

Nonverbal Language The human body transmits 95% of the information when we do not communicate, that information goes unnoticed by the rest of the people, this information is essential for the settlement of conflicts, negotiations and in the investigation of the facts Emotional Intelligence Identification, control and management of emotions, useful for personnel management and conflict resolution. Very important for decision making, especially in negotiations

ماجستير, PM and construction
  • في Instituto Superior de Arquitectura Fundación Antonio Camuñas
  • نوفمبر 1994

The master's degree could not be completed due to the economic collapse in Mexico in 1994 and the scholarship program was cancelled.

بكالوريوس, Architecture And Building
  • في Universidad Autónoma de Tamaulipas
  • يناير 1989

Professional registered architect in México No. 1522258 SEP since

Specialties & Skills

General Construction
Pre construction
Industrials
MICROSOFT OFFICE
NEGOTIATION
QUALITY CONTROL
SPECIFICATION
SUPERVISORY SKILLS
ACTIVITY BASED COSTING
AUTOMOTIVE
BUDGETING
MS Project
Project Planning
Project Managemet
Detection of Project Deviations
Building inspection
Project Logistics
PCA Inspections (ASTM E2018-15)
Construction Management
Arbitration Consulting
Generation of Recovery Plans
Bid Process Managing
Project development
Specification Development