Senior Surveyor
ACE Arab Consulting Engineers "Moharram.Bakhoum"
Total years of experience :26 years, 4 Months
• INFRASTRUCTURE : Roads, IRRIGATION Network, SEWERAGE Network, STORM Network, TLECOM Network, WATER Network, LIGHTING &Medium Voltage& Low Voltage Network.
• Desalination Plant.
• Sewage Treatment Plant
• Lift Stations.
• PUMP Stations.
• Landscapes.
• Superstructure
1-Chief Surveyor ARCHIRODON for Construction (Overseas) Co Tripoli Harbour breakwater reconstruction - Tripoli - Libya
2-Chief Surveyor ASEC for Engineering and Management
3- Quantity surveyor at Besix-Orascom JV, Egypt
El-Ain El sokhna Supercritical power plant
4- Surveyor ARCHIRODON for Construction (Overseas) Co. S.A
Damietta cycle power plant 500mw
5- Surveyor ARCHIRODON for Construction (Overseas) Co. S.A
El-Ain El sokhna Supercritical power plant (Piling works)
6-El- Nasr Building & Construction Company " EGYCO
Ibney Betak project
7- Surveyor Archirodon for Construction (Overseas) Co. S.A & Arab Contractor- JV
New container terminal and Quay wall Damietta port Egypt
8- Surveyor Industrial and Engineering Projects Company
Constructing of village at (Sahl-Eltena)
9- Surveyor El salam-Misr for trading and contracting
Livestock terminal handing facility & infra structure
10- Surveyor ARCHIRODON Construction (Overseas) Co. S.A
Port Said East Container Terminal
11- Surveyor EL Mansoura Petroleum Company
Preparing the sites and its roads of drilling for natural gas
12- Surveyor General Co. For Land Reclamation, Dev. & Recon.
Intakes 3&5&7 in El-Salam Canal
12- Surveyor Heliopolis Co. for Housing and Dev.
Group of resident building
we use the latest technology to perform the kiln hot alignment while the kiln is in normal operation such as
• Precise rollers and tyres diameters measuring device.
• Latest and most accurate total station -Trimble 5601 DR
• Accurate mini prisms and 360 prisms
Roller and tyres grinding restores their original cylindrical shapes and hence improve the area contact between them rollers and tyres grinding when carried out with the kiln hot alignment gives the best results and maximize their lifetimes ASEC uses specially designed machines for grinding:
• Rollers surfaces
• Tyres surfaces
• Tyres thrust face
•Prepare site layout & surveying work.
•The scope of civil works includes the construction of 3 pipelines totaling a length of approximately 5.1 km
•Prepare shop drawing.
•Controlling execution of work:
(Formwork, excavations, and backfilling)
•Make a surveying in each area.
•Issue inspection and test plan.
•Helping the site team and in preparing work procedure and method statement.