Project Management of the New & ongoing facilities.
Tendering, Negotiations, Award.
Scheduling and supervision of the project.
Project review Meetings and Reports.
Approval of sub agencies, Material, QC.
Site Progress, Monitoring. Billing NT works, Variation, BOQ disputes and resolution.

Head Projects at ART Fertility Clinics, India
  • India - Gurgaon
  • September 2020 to May 2021

Projects Head from Clients side. Heading team of 3 three Project Managers, one Biomedical Engineer and One MEP engineer Reporting to CEO.
Selection of Project site. Studying Existing Infrastructure and comparing it with the requirement. accordingly design DBR for Services and Infra.
Develop concept, Space Plan, Prepare budgetary cost, Obtain approval from Chairman and Submit to Architects for further development.
Invite tenders and awards.
Approval of sub agencies, Material, QC. Site Progress, Monitoring. Billing NT works, Variation, BOQ disputes and resolution.
Monitoring Performance of Project Managers. resolving technical site difficulties, recommendation to office for approval of funds. Reviewing budgetary allocation, progress, cash flow and report and submit recommendation to Head office and finance.
Approving Non- Tendered Items and suppliers.Obtain approval from management and Implementation.
Coordinating with Signage contractors approving Internal and external signages, locations and installations.
Preparing MIS, Submitting weekly progress report to CEO and Chairman.

Senior Projects Manager at NMC Healthcare, Abu Dhabi
  • United Arab Emirates - Abu Dhabi
  • March 2020 to July 2020

Joined as a Senior Projects Manager

Monitoring Project Progress in DIP Dubai,
Sharjah.

All the Ongoing projects were in the completion stage and I was involved in Handing over and Billing.

I had to return early because of COVID in 2021

Chief Engineer at Dorsch Consult India Pvt Ltd
  • India
  • November 2019 to March 2020

Project Management and monitoring its progress of Various ongoing Projects in India. Such as
Airport Project at Dehradun.

Communicating with Project Engineers regarding drawings related Water Supply and drainage. STP works, and Rain water conservation system.

Resurvey and tracing of High Tension cable from 33KWA power source outside airport premises to the internal substation.

Relocation of trees to the selected spot as per LEAD (Green building) recommendation.

Coordinating with Projects manager and submitting drawings and details as required.

General Manager at Modular Concepts LLc, Dubai
  • United Arab Emirates - Dubai
  • February 2019 to June 2019

Joined as a General Manager Projects

Initiate Construction of Modular concept facility in DIP Dubai.

Initiating New Hospital Project at Al Safeer Mall Sharjah for M/s NMC Health Care.

Monitoring NMC Health Care Project at DIP-1 Dubai. The project was initiated in the 10year old building and as per Dubai Municipality recommendation structural strengthening was taken up with high tension carbon fibre jackets.

Involved in execution of NMC Hospital project in Dhabi & Muscat.

Involved in HR activities in final interviews of Project managers, Engineers and site-in charge.

Project Director at Dehradun India
  • India - Dehra Dun
  • July 2018 to February 2019

Joined as Projects Director for Erection of New Airport Terminal and extension to the old terminal (Passenger side) at Jolly Grant Airport Dehra Dun
Initiating the Project

Complete Survey of the land area including Air side.

Complete Survervey of Existing underground and Overground Services.

Monitoring and establishing Plant and machinery for contractors, including site test labs, contractor facilities labor accommodation and cement plants.

Joint Testing of all materials from Kharagpur IIT and submitting reports.

Soil testing and erection of large RCC pile retaining walls to protect foundations of existing airport terminal without affecting terminal operations.

Initiating survey and application for NOCs from government authority such as fire safety department and Environmental Department. as very large quantity of soil cutting and filling proposed.

Survey of Airport extent and Compound Wall heights and watch towers.

Routing of incoming outgoing and VIP and General traffic.

Relocation of Flag Posts.

Quantity Survey check for large underground tunnels for Services and luggage

Billing and approval of quantities in AAI format
Laying alternative roads and tributaries for separating Airport Traffic and construction traffic

Creating alternative parking lot.

Relocating Existing ancillary structures to new permanent location.

Resetting progress chart as per the ongoing site progress. (MS Project)

Vive President (Projects) at RishiRaj Associates
  • India - Bengaluru
  • June 2017 to July 2018

Providing Engineering support services such as preparation of drawings, GFC drawings, shop drawings etc.

Vice President (Projects) at IVI Middle East Fertility Clinics LLc Abu Dhabi
  • United Arab Emirates - Abu Dhabi
  • March 2014 to March 2017

I was deputed in capacity of Vice-President Projects

I erected this facility from start to finish and handed it over in time.

Collecting Data, equipment planning, Space/Room areas after discussing with Medical Directors and embryologists. and finalize the process flow.

Space Planning and Designing of IVF Facility In Plot 22/23, Marina Village Abu Dhabi.

Develop concept, Space Plan, Prepare budgetary cost, Obtain approval from Chairman and Submit to Architects for further development.

Invite tenders and awards.

Appointment of Consultant /Architect for preparation of GFC drawings and tenders so as to make budgetary calculations and obtain ok from financiers.

One licensed Architect for preparation of drawings and submitting to Abu Dhabi Municipality and HAAD

Finalize the DBR, BOQ Specifications and float the tender.

Negotiate and award the contract.

Demolish the interiors and services up to the source.

Apply for Enhanced Power supply/water, Preliminary approval from HAAD (Health Authority of Abu Dhabi, Fire Fighting and Civil Defense.

Complete Fit Out of the facility including Civil, Interior, HVAC, MEP, Fire fighting, Nurse call System, RI-Witness, Xiltrix, fitted furniture, loose furniture, Filters, Networking, UPS, Battery Server, Electric room, Telecom Room, Placement of OT and Lab Furniture.

Installation testing and commissioning of equipment.

Verifying and reviewing submitting, bills and variations. Checking and approving the bills to release funds.

Preparation signage names obtaining approvals from Head office and MOH and Install.

Dealing with contractors, consultants and authority personnel.

Preparing and submitting MIS and reports and issuing project schedules to contractors.

All authority final approvals, and handing over.

Vive President (Projects) at NOVA MEDICAL CENTERS MIDDLE EASTLLC
  • Oman - Muscat
  • March 2011 to March 2014

I was deputed in capacity of Vice-President Projects.

I erected this facility from start to finish and handed it over in time.

Collecting Data, equipment planning, Space/Room areas after discussing with Medical Directors and embryologists. and finalizing the process flow.

Space Planning and Designing of Poly Clinic Facility In Al Salam Building, Behind Al Salam Mosque, Al Khuwair, Muscat Oman..

Develop concept, Space Plan, Prepare budgetary cost, Obtain approval from Chairman and Submit to Architects for further development.

Invite tenders and awards.

Appointment of Consultant /Architect for preparation of GFC drawings and tenders so as to make budgetary calculations and obtain OK from financiers.

Issue to Architect for preparation of drawings and submitting to Muscat Municipality and Ministry of Health Oman

Finalize the DBR, BOQ Specifications and float the tender.

Negotiate and award the contract.

Demolish the interiors and services up to the source.

Apply for Enhanced Power supply/water,

Preliminary approval from MOH (Ministry of Health), Fire Fighting and Civil Defence.

Complete Fit Out of the facility including Civil, Interior, HVAC, MEP, Fire fighting, Nurse call System, fitted furniture, loose furniture, Filters, Networking, UPS, Battery Saver, Electric room, Telecom Room.

Complete Microbiology Lab setup (with Architect 2000 setup) Furniture, Installation testing and commissioning of equipment.

Preparation signage names obtaining approvals from Head office and MOH and Install.

Verifying and reviewing submitting, bills and variations.

Checking and approving the bills to release funds.

Dealing with contractors, consultants and authority personnel.

Preparing and submitting MIS and reports and issuing project schedules to contractors.

All authority final approvals, and handing over.

Assistant General Manager (Commercial) at Shamel Interrnational Industries LLC Oman
  • Oman - Muscat
  • November 2009 to May 2011

This was a Hard Core Interior fit out Contractors and one of the top fit out contractors in Oman with 650 pax Manpower large carpentry factory and a timber depot. with following departments
Carpentry factory, Upholstery factory, Gold leafing, Hand Carving, Gypsum Molding and Ceiling works.
Joined as an Assistant General Manager Commercial and Projects.

In-charge of Commercial Department

Following Projects were executed under me for projects

Recreation Facility for Hisn Al Shumookh Palace Nizwa Oman

Fit Out works at Sports city of Winter Asian Games in Muscat.

Complete Manufacture and Fitout including fitted and Loose furniture, including International shipment (Oman to India) for 52 rooms for JW Marriott Juhu Mumbai.

Fit Out works of Museum at Royal Office Muscat.
Numerous tendering works. Prominent among them is Oman National Museum, Nilona Tower, Royal Office Musium (Project 600), Refurbishment of Bedroom for His Majesty at Casr Al Alam Muscat. Various Mosque Interiors and fit-out and dome installations

Asst. Senior Manager at Saud Bahwan Group Oman
  • Oman - Muscat
  • September 2005 to October 2009

Joined as manager projects for Saud Bahwan Group at Wattayah Oman

Completion of the Corporate Center for the SBG Group

Making ready Corporate lobby for Inauguration. The inauguration was graced by His Excellency Mr. Toyoda, then owner of Toyota Corp.

Completion and Handing over of Corporate center Department wise.

Fit out of Chairman's office

Installation of Gifts and Articles and displays.

Supervision of Bachelor and Family accommodation facilities in Muscat and Sohar
Supervision of Gated Community 150 Villas and 250 Apartments at Saud Bahwan Palm Gardens Sohar.

Space Planning, Budgetary Calculation Obtaining Chairman's Approval for all proposed facilities at Muscat, Sohar Liwa, Sumail, Suwaiq, Rawda, Dibba Etc, award contract and superwise project approving the bills.

Resident Manager at Semac Consultants, Dubai
  • United Arab Emirates - Dubai
  • August 2004 to September 2005

Joined as Resident Manager for Semac Consultants
Reporting to Managing Director and CEO

Appeared and Passed Dubai Municipality Test.
Semac Consultants Trade License in My Name.

All Administration works

All Dubai Municipality Works

All Trade License works

All Manpower works ( Manpower for site and office)

HR works, Appointment of Architects and staff.
Disbursement of Salaries

Attending Chartered accountant and submitting report to Management

Business Development as Architectural Consulting Firm for design and construction of Villas
BPO for BBS and ShopDrawings for following projects.
29 Clover leaf bridges Dubai Pearl - Contractor Besix
New Garhoud Bridge, Contractor Besix.
Dubai Tower zone 24/25 Contractor Samsung.
New Building for Ministry of Foreign affair Dhabi- Contractor- Sixco & Concord Tie Up.

Coordination Space Planning and design of 75 storey Tower for Mr. J.P. Kalwani at Sharjah Lagoon Sharjah.

Construction of G+7 Building at Deira Dubai for Mohsin Haidar Darwish.

Sr. Structural Engineer at Al Farren & Partners Dubai
  • United Arab Emirates - Dubai
  • February 1994 to August 2004

Joined as a Structural Engineer

Structural Design of RCC and Steel

Structural design in Staad Pro, & Prokon

Software developed by Myself in QuickBasic Basic language, Excel

Complete Autocad Drafting and Detailing
3D Modelling of villas and rendering in Bryce-5
Photoshop-6

Submission to Dubai Municipality and Obtaining Approval.

Land Survey of Plot

Soil Investigation and testing.

Site setting out and related works

Supervision and execution of the project

Steel Checking, Approving steel

Inviting and attending Dubai Municipality site checking

All Site QA QC

Material Checking and Approval

Bills checking, Variation and recommendation

Engineering Manager at Vaijayanthi Structurals and Contractors
  • India - Belgaum
  • January 1985 to February 1994

Obtained License of Structural Engineer from Belgaum Municipality.

Promoting apartment Buildings for self and for client.

Preparing building development proposal to Belgaum Urban Development authority

Belgaum Municipal corporation obtaining permits from relevant authority

Set out and commence construction and handover to the client.

Structural Design of RCC and Steel

Structural design in StaadIII, & Prokon

Software developed by Myself in Quick Basic Basic language, Excel

Complete Auto Cad Drafting and Detailing

Asst. Structural Engineer at K.L.N. GUPTA (STRUCTURAL ENGINEERS)
  • India - Hyderabad
  • July 1984 to December 1984

Manual Design of structural components of buildings such as Slabs, Beams, Footings, Columns etc.

Prepare sketches for drafting, & Site visits

Education

Bachelor's degree, Civil
  • at Gogte Institute of Technology
  • September 2022

(

High school or equivalent, Civil
  • at University Karnataka University
  • January 1984

Bachelor of Civil Engineering (Structural). Project was Analysis and Design of Multi storied building using IS code SP16. Analysis by Kani's Method and Moment distribution. Use of IS Codes for design of slabs. Bearing capacity of soil was20T/Sq m

Specialties & Skills

Hospitals
Fertility
Healthcare Design
Project Management
Project Planning
Project Scheduling
Workforce Management
MS Excel
MS Project
Technical Writing
Auto Cad Drafting and Detailing
Hospital Fit Out
Daycare Center Design and Build
Structural Bar Bending Schedule
Autocad 3D
Fertility Clinic Design and Build
Structural Drafting and Detailing
Hospital Design and Build
Structural Design
Medical Engineering
Revit Structure

Languages

English
Expert
Hindi
Expert

Hobbies

  • Table Tennis, football, Cricket, Reading, Travelling, Meeting People
    I have raised as a Site Engineer to Head Projects Appreciation letter received from Sheikh Saud Bahwan of Oman