chemical engeneering
nesma
مجموع سنوات الخبرة :7 years, 10 أشهر
operation of potable, waste, irrigation, and sea water in the KAUST.
.supervisor of working in operation
coordinator field and technical facilities .
operation and isolation of valves, pipe and fire hydrate.
prepare the service and hydro test
tendering and proposal of water treatment plant (RO and surface water) and sewage treatment plant one year
site engineering of sewage treatment plant 6 months
sells engineering 7 months
English program of writing an essay , reading, proncetion , and presentation
Professional Experiences and Training • 2012-2013, Graduation Project: Renewable Energy (Solar Powered Hydrogen Production System for Home Use): • The system is powered by photovoltaic solar panels. • An efficient, safe and cheap electrolyzer system was designed and constructed. • The system produces the hydrogen and stores it in tank at a rate of 100 NL/day with 80 W supply. • The purity reaches 99%