Quantity surveyor
M/s Consolidated Contractors Company ( CCIC)
Total years of experience :26 years, 7 Months
Client:- ASHGHAL (Public Works Authority - Express Highway Division, Qatar)
PROGRAMME MANAGEMENT CONSULTANT- KBR - Kellogg Brown & Root International Inc.
SUPERVISION CONSULTANT- WSA - WS Atkins & Partners Overseas
Name of Project:- Dukhan Highway Project (Central contract)
CONTRACT VALUE - QR. 1, 046, 400, 000/- (Remeasurable)
Consist of Bridges (Inter Changes- 3 Nos.), Roads (15 KM 4 lane dual carriage way & 40 KM service roads, Cycle track-15 KM), Under Pass and Services like Road Lighting, Sewerage, Water & Drainage works.
Job Profile:-
Preparing STANDARD QUANTITY.
Preparing Cross Sections using AUTO CAD.
Preparing Monthly Bill for the Client, checking and passing it.
Coordinating with the site Engineers.
Preparing Sub-Contractor Bill.
Monthly Reconciliation.
Preparation of Final Measurement.
From 12-05-2007 to 15-6-2012
QUANTITY SURVEYOR.
M/s SALINI COSTRUTTORI SPA, DUBAI.
Consultant:- PARSONS Overseas Ltd
Client:- Roads & Transport Authority (RTA), Roads Department, DUBAI, UAE.
Name of Project:- IMPROVEMENT OF INTERCHANGE No.1 ON SHEIKH ZAYED ROAD. DUBAI, UAE.
Consist of Bridges, Roads, Under Pass and Services like Road Lighting, Sewerage, Water & Drainage works.
Quantity takeoff from contract drawings and shop drawing.
Preparation of Running Account bills
Preparation of Interim valuation
Familiar in using CCS CANDY software
Familiar with CESMM3
Preparation of Estimation
Preparation of New Rates (Variation)
Preparation of Detailed Rate Analysis for major items of work
Preparation of Subcontractor’s Certificates
Monitoring, supervision and preparation of Monthly reconciliation
From 24-04-2005 to 10-02-2007.
QUANTITY SURVEYOR.
M/s AL NABOODAH CONTRACTING (L.L.) CO., DUBAI.
DUBAI INTERNATIONAL AIRPORT EXPANSION PHASE- II.
Name of Project:- i)Dedicated Lane for EK BUS (AX 308). Consists of EK Road, CUC 6 TUNNEL (Centre utility corridor ), CATERING RAMP.
ii) GSE TUNNEL EAST OF CONCOURSE-2 (AX-087), Consists of BHS TUNNEL (Baggage Handling System), APM TUNNEL (Automatic Passenger Movement ), and VEHICULAR TUNNEL.
iii) APRONS NORTH OF CARGO VILLAGE (WEST APRON - AX 091), Consists of TAXI WAY, AIR FIELD LIGHTING, STORM WATER DRAINAGE etc
iv) DISPLACEMENT/RECONSTRUCTION OF RUNWAY 12R/30L, TAXI WAYS (AX-095)
Responsibility:- Quantity take off, Preparing Monthly Bill for the Client, checking and passing it, Preparing Sub-Contractor Bill.
IN INDIA
From 03-05-1996 to 31-05-2004.( 8 YEARS )
QUANTITY SURVEYOR - 5 YEARS & LAND SURVEYOR - 3 YEARS
M/s HINDUSTAN CONSTRUCTION COMPANY LTD. MUMBAI.
Name of Project:- i)ENNORE ROCK QUARRYING & TRANSPORTATION PROJECT at MELAPAKKAM near ARAKKONAM.
ii) CONSTRUCTION of 940 M. long BARRAGE-CUM-BRIDGE across river KATHJODI @ NARAJ, CUTTACK (Dist), ORISSA
iii) CONSTRUCTION of 5 Nos. PUMPING STATIONS @ SURENDRANAGAR, GUJARAT.
iv) TIRUPUR BULK WATER SUPPLY PROJECT, TIRUPUR. of 250 MLD capacity, on EPC Contract.(55 KM long Pipe line, (1400 mm Dia.) W.T.P., Intake well, Master Balancing Reservoir of 185 MLD capacity etc.
Responsibility :- Quantity take off, Preparing Monthly Bill for the Client, checking and passing it, Preparing Sub-Contractor Bill. Doing detail Surveying along the Pipe line route, Fixing Turning points, Taking Initial & Final Levels of all the Structures, Pipe lines, Taking all the details for preparing AS BUILT DRAWING of Pipe line, Marking Line & Levels, Preparing and Submitting Monthly bills of Sub-Contractors, Preparing the Pipe line profile (Longitudinal section) for doing the Hydraulic test. Taking Initial & Final Levels of all the Structures, Preparation of Cross section & Longitudinal section, Marking Line & Levels, Preparing and Submitting of FINAL BILL along with AS BUILT DRAWING.