محمد رامي تمر  تمر, Primavera P6 Planner

محمد رامي تمر تمر

Primavera P6 Planner

Jacobs engineering

البلد
تونس
التعليم
ماجستير, هندسة الحاسب الآلي
الخبرات
14 years, 6 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :14 years, 6 أشهر

Primavera P6 Planner في Jacobs engineering
  • المغرب - الدار البيضاء
  • أشغل هذه الوظيفة منذ يوليو 2018

• Establish progress and monitoring dashboards, and KPIs
• Support the project control group at Project’s in all aspects of planning;
• Coordinate with current and future subcontractors in order to update the schedule;
• Ensure the quality of subcontractor schedules on Primavera P6 and check that they are aligned with the master planning;
• Support the Project Controls group in calculating resource requirements;
• Coordinate with the commissioning group, setting up the commissioning schedule to meet the needs of the systems commissioning sequence;
• Assist subcontractors to plan pre-commissioning verifications as well as MC (Mechanical Completion) work per system;
• Support the project control group in the establishment and monitoring of physical advancement by discipline and by phase (quantities installed in relation to total quantities);
• Provide adequate support to maintain the Project’s schedule in the CLOUD (Load Spring Platform);
• Support the Project Controls group in creating the planning database for the entire project;
• Support the project control group in identifying and feeding the schedule with potential delays;
• Maintain the project baseline schedule;

Senior Scheduler Team Lead في Jacobs Engineering SA
  • المغرب
  • أشغل هذه الوظيفة منذ فبراير 2019
Planning Leader في PIRECO - Petroleum and Industrial Realization Contractors
  • تونس - تونس
  • يناير 2016 إلى يونيو 2018

 Progress and Manpower Monitoring
 Maintain and Update Project Baseline Schedule,
 Prepare different type of reports to Project Management (Weekly, Monthly, ..),
 Baseline Program Analysis and Critical Path Analysis,
 Prepare forecasts and scenarios studies,
 Provide Project Management with required consultancy on Project Completion Dates,
 Conduct weekly Progress Meeting,
 Prepare an Action/ Recovery Plans and Preparation of Time Impact Analysis
 Using software : PRIMAVERA project planner P6 R15.2
 Productivity measurement, evaluation and analysis.
 Monitoring the progress of the project at different stages of its development
 Making sure the achieved progress on the project fits the progress anticipated in the schedule
Keeping in contact with the project manager

Planning & Cost control engineer في MEDCO S.A
  • تونس - تونس
  • يونيو 2012 إلى ديسمبر 2015

I worked in different project and bids.
** Project 1 : Installation Work : Central Mechanical-BOP combined cycle
Client : SNC-Lavlin / STEG
Location: Sousse, Tunisia
** Project 2 : Construction of treatment unit of drain water
Client : TANKMED
Location: Skhira, Tunisia.
** Project 3 : BARAKA Drain Pumps Project
Client : ENI
Location : offshore platform, Maamoura, Tunisia.
** Project 4 : Sidi Litayem revamping project : Pump station construction
Client : CFTP
Location :SIDI Litayem, Tunisia.

During these project, I was responsible of:

· Preparing the weekly and monthly reports to the project team and the client.
· Progress and Manpower Monitoring
· Construction Schedule updating.
· Productivity measurement, evaluation and analysis.
· Follow-up and coordinate all the sub-contractor construction activities
· Presenting the target schedule of work to the project team
· Developing KPI to understand schedules and graphs
· Monitoring the progress of the project at different stages of its development
· Making sure the achieved progress on the project fits the progress anticipated in the schedule

IT Help-desk في Orange Tunisia
  • تونس - تونس
  • يناير 2012 إلى يونيو 2012

 Manage the links with users: support, configuration and training
 Performance Measurement Team
 Deployment and updated applications
 Test applications: security, reliability and performance. Maintain and develop the service:
 Manage corrective maintenance (recovery errors and tracking corrections) with the service providers concerned
 Ensure the evolutive maintenance of the system participate in the general activities of the IT department
 R & D implementation of technical solutions evolving (infrastructure, software architecture, ...)
 Deployment and administration systems (Windows 2000, XP, 7)
 Computer equipments and softwares procurment
 Install and test equipment (Installation and Commissioning): safety, reliability, performance
 Assistance with remote support : Microsoft SCCM software.
 Preventive maintenance: cleaning, adjustment, control.
 Knowledge networks. : Wiring DHCP and TCP / IP configuration
 Monitoring of incidents and requests via the management tool HP Service Manager incidents.
 Installation and configuration of VPN client.

IT-Helpdesk في Laser Contact
  • تونس - تونس
  • سبتمبر 2011 إلى ديسمبر 2011

 Installation, managing and handling networks
 Computer repair, configuration networks
 Interconnection networks: TCP-IP, routers and switches.
 Hardware maintenance

IT Technician في TMR informatique
  • تونس - تونس
  • أكتوبر 2009 إلى أغسطس 2011

 Management
 Budget estimation Cost for all Technical, Operation & Maintenance Contracts included in the Work Plans.
 Issuing the Annual estimated revenue.
 Communication between providers sales of computer hardware and go in retailers.
 Performance Measurement
 Monitoring of incidents and requests via the management tool

الخلفية التعليمية

ماجستير, هندسة الحاسب الآلي
  • في كلية العلوم بتونس
  • يناير 2012

The program aims to improve scientific knowledge in the fields of electronics, telecommunications and their applications. In addition, this training course promotes the development of applied science component and the applicant's training in the fields of telecommunication, telecoms and new information technologies and communications. It allows, among other things, a better integration

دبلوم عالي, انظمة الكترونية : صيانة الكمبيوتر
  • في المعهد العالي للتكنولوجيات الطبية بتونس
  • ديسمبر 2010

Creation and development of a dynamic web application backup information assets PHP / MySQL of " Tun

بكالوريوس, علوم تجريبية
  • في المعهد الثانوي ابن خلدون
  • يوليو 2007

BAC

Specialties & Skills

اللغات

الانجليزية
متمرّس
الفرنسية
متمرّس
العربية
متمرّس

العضويات

الهلال الأحمر التونسي
  • السلامة المهنية
  • June 2011

التدريب و الشهادات

PRIMAVERA P6 EPPM R15.2 (تدريب)
معهد التدريب:
ORACLE
تاريخ الدورة:
June 2016
Strategy to incorporate BIM curriculum in Planning and Scheduling classes, BIM process « Building In (تدريب)
معهد التدريب:
Wadal Co Holding , Riyadh , KSA
تاريخ الدورة:
June 2014
المدة:
50 ساعة
Prepare for the PMP® PMI® certification exam (تدريب)
معهد التدريب:
FORMAPRIME
تاريخ الدورة:
September 2015
المدة:
35 ساعة
Primavera P3 (تدريب)
معهد التدريب:
MEDCO
تاريخ الدورة:
June 2013
المدة:
48 ساعة

الهوايات

  • Sport