Total Years of Experience: 31 Years, 2 Months
October 2014
To Present
Electrical Sit Inspector
at NKY Architects & Engineers
Location :
Saudi Arabia - Jizan
Presently : Electrical Site Inspector
: NKY Architects & Engineers, Riyadh- Saudi Arabia
: NKY Architects & Engineers, Riyadh- Saudi Arabia
July 2007
To September 2014
Job Profile
• Preparation of material submittals for client/consultant approval
• Preparing the quantity with shop drawing
• Preparing the take-off materials for procurement
• Daily work progress report monthly planning as per client requirement
• Co-ordination with client & consultant and various agencies
• Co-ordination with foreman & lead man and technicians for swift and quality execution of works
• Embedment conduit specially in rib slab & Block walls With civil coordination
• Control &Monitoring the man power groups or individuals for the lagging of man power
• Submit the as built drawing as per site work.
• Cable tray & trunk work With MEP co-ordination
• Checking the quality & quantity of work to avoid lagging of materials.
• shelter Generator installation work. Healwell lighting system & dimmer control & power systems.
• Fire alarm system
• Telephone, Data intercom System
• Ups, Public address, smatv, Access card system
• BMS system
• Earthing & Lightning protection work
• 2 x 1600 KVA Transformer erection.
• Installation of 2500A Medium Voltage panel
• 1000 KVA generator installation & Testing.
• Planning & Supervision of MV, LV cable Glanding & Termination works, MV Cable Hi-pot testing,
• Meggering, Loop checking activities, impedence testing of all control system
• Voltage drop calculation & load calculations.
Achievements
• Seven schools around Doha and villages
• 2B+G+M+7 Multi store building
• Qatar University Library(B+G+4), New research complex
• Tivoli Furniture Showroom
• Al Madaen five star hotel project (B+G+7+roof)
• Preparation of material submittals for client/consultant approval
• Preparing the quantity with shop drawing
• Preparing the take-off materials for procurement
• Daily work progress report monthly planning as per client requirement
• Co-ordination with client & consultant and various agencies
• Co-ordination with foreman & lead man and technicians for swift and quality execution of works
• Embedment conduit specially in rib slab & Block walls With civil coordination
• Control &Monitoring the man power groups or individuals for the lagging of man power
• Submit the as built drawing as per site work.
• Cable tray & trunk work With MEP co-ordination
• Checking the quality & quantity of work to avoid lagging of materials.
• shelter Generator installation work. Healwell lighting system & dimmer control & power systems.
• Fire alarm system
• Telephone, Data intercom System
• Ups, Public address, smatv, Access card system
• BMS system
• Earthing & Lightning protection work
• 2 x 1600 KVA Transformer erection.
• Installation of 2500A Medium Voltage panel
• 1000 KVA generator installation & Testing.
• Planning & Supervision of MV, LV cable Glanding & Termination works, MV Cable Hi-pot testing,
• Meggering, Loop checking activities, impedence testing of all control system
• Voltage drop calculation & load calculations.
Achievements
• Seven schools around Doha and villages
• 2B+G+M+7 Multi store building
• Qatar University Library(B+G+4), New research complex
• Tivoli Furniture Showroom
• Al Madaen five star hotel project (B+G+7+roof)
October 2003
To July 2007
at Baraka Construction Middle East co
Job Profile
• Preparation of quantity take-off to all electrical materials like cables, wires, conduits, GI Trunk, Cable Tray and GI conduit & Electrical accessories.
• Preparing Man power Timesheet & allocation of works.
• Coordination with electricians & Charge Hands for quality of works.
• Lighting, power works.
• MICC cabling in High raise structure in Building.
• Plumbing, drainage work also.
• Fire alarm, Smoke Detector, Heat Detector installation.
• Telephone, Data & Intercom systems.
• Installation &Cable Laying of Submecilble Pump, Motors and equipments.
• Earthing & Lightining Protection Arrestor works.
• LV, HV Panel Erection & cable laying, Termination works
Achievements
• Abudhabi Military Aircraft Maintenance work
• Abudhabi Military Aircraft shelter Generator maintenance work
• Preparation of quantity take-off to all electrical materials like cables, wires, conduits, GI Trunk, Cable Tray and GI conduit & Electrical accessories.
• Preparing Man power Timesheet & allocation of works.
• Coordination with electricians & Charge Hands for quality of works.
• Lighting, power works.
• MICC cabling in High raise structure in Building.
• Plumbing, drainage work also.
• Fire alarm, Smoke Detector, Heat Detector installation.
• Telephone, Data & Intercom systems.
• Installation &Cable Laying of Submecilble Pump, Motors and equipments.
• Earthing & Lightining Protection Arrestor works.
• LV, HV Panel Erection & cable laying, Termination works
Achievements
• Abudhabi Military Aircraft Maintenance work
• Abudhabi Military Aircraft shelter Generator maintenance work
January 1998
To September 2003
Electrical supervisor
at LG Foundation
Job Profile
• House wiring and conduit DB, panel installation.
• Lighting, Power Installation and maintenance
• House wiring and conduit DB, panel installation.
• Lighting, Power Installation and maintenance
January 1993
To December 1997
Electrical Controller
at Cornation Arts Crafts
Location :
India
Job Profile
• Preparation of quantity take-off to all electrical materials like cables, wires, conduits, GI Cable Tray and GI conduit & Electrical accessories.
• Preparation of sub-contract scope, negotiate and award of sub-contract activities. Overall coordination and execution of Sub-contract activities.
• Preparing the Materials list and follow up the suppliers.
• Installation Of cable tray in Junction Towers.
• Installation of Conveyors & Motors .
• Machinery, Control panel repairing testing Co ordination with technicians.
• Installation of equipments such as Power Transformers, Switchgears, MV & LV Switchgear/MCC’s, Battery Charger systems, lighting systems, fire alarm systems
• 110KVA Generator operating and maintenance work
6. Working as : Electrical Foreman
Firm
• Textiles -Olympic spinning mills, Madurai, Tamilnadu.
• Machinery, control panel repairing testing
• Co ordination with technicians
• 125KVA Generator operation and maintenance
• Preparation of quantity take-off to all electrical materials like cables, wires, conduits, GI Cable Tray and GI conduit & Electrical accessories.
• Preparation of sub-contract scope, negotiate and award of sub-contract activities. Overall coordination and execution of Sub-contract activities.
• Preparing the Materials list and follow up the suppliers.
• Installation Of cable tray in Junction Towers.
• Installation of Conveyors & Motors .
• Machinery, Control panel repairing testing Co ordination with technicians.
• Installation of equipments such as Power Transformers, Switchgears, MV & LV Switchgear/MCC’s, Battery Charger systems, lighting systems, fire alarm systems
• 110KVA Generator operating and maintenance work
6. Working as : Electrical Foreman
Firm
• Textiles -Olympic spinning mills, Madurai, Tamilnadu.
• Machinery, control panel repairing testing
• Co ordination with technicians
• 125KVA Generator operation and maintenance