رامي السيد, SR.QC Engineer

رامي السيد

SR.QC Engineer

Eetilaf JV (Hassan Allam, Orascom, Rowad and NRD)

البلد
مصر - الإسكندرية
التعليم
بكالوريوس, Civil Engineer
الخبرات
13 years, 1 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :13 years, 1 أشهر

SR.QC Engineer في Eetilaf JV (Hassan Allam, Orascom, Rowad and NRD)
  • ليبيا - طرابلس
  • أشغل هذه الوظيفة منذ أكتوبر 2023

• Project: Construction of Tripoli Third Ring Road (Bridges Section)

o Overseeing construction of Interchange 13 (IC 13), the largest bridge section of the project, from excavation to completion of columns and cross beams.
o Managed quality control procedures for precast pre-stressed beams and post-tension box section bridges used in IC 13.
o Provided technical support and ensured adherence to project specifications and international quality standards.

SR.QC Engineer في Orascom Construction Limited
  • مصر - العلمين الجديدة
  • مايو 2021 إلى سبتمبر 2023

o Led quality control activities during the finishing stage of the four NUCA towers and their podium.
o Ensured high-quality workmanship in various finishing works, including masonry, plastering, flooring, wall painting, aluminum cladding, and ceilings.

QA/QC Civil Engineer في Orascom Construction Limited
  • مصر - القاهرة
  • مارس 2018 إلى أبريل 2021

Construction of Maspero station which considered one of the underground stations of the line 3 phase 3 of the Greater Cairo metro whith all its construction phases as a QA/QC Engineer since Mar.2018 till April 2021.
Maspero station consist of 5 Levels (Raft, Platform, Intermediate, Ticket and roof slab.
The station was constructed on 3600 m2 and was constructed by Egyptain French joint venture (VINCI, BOUYGUES, Orascom construction and Arab contractors) for the National Authority for tunnels (NAT) under supervision of SYSTRA Consultant.
This project enhaced my experience in the following fields:
1- Diaphragm wall construction.
2- Secant piles.
3- construction of the station slabs using up to down method (Roof, Ticket, intermediate
Raft and platform slabs).
4- Raft slab water tightness system.
5- Metro stations finishing works including Floors, walls and ceilings.

Construction of New Al-Alamien beach towers (NUCA Towers) within th
finishing works stage as a Senior QA/QC Engineer since May.2021 till now.
NUCA Towers consist of 4 towers and its podium
This project enhanced my experience in the following fields:
1- Masorny and plastering works.
2- Floor finishing: Ceramic tiles, Porcelain, marble, epoxy painting …etc.
3- Wall finishing: Aclyric painting, Epoxy painting …etc.
4- Aluminum cladding: Curtain walls, wall cladding, fiber cement board ..etc.
5- Ceiling finishing: Aclyric painting, False ceiling …etc.

Civil Site Engineer في Al-Karma for real state development
  • مصر - الإسكندرية
  • فبراير 2017 إلى فبراير 2018

construction of 37 building (2basement, ground and eleven repeated floors)
(FEB-2017 -till Now)
Ongoing activities till now:
1. Excavation
2. Piles
3. Foundations
4. Concrete works of flat slabs in basment, ground and first floor.
5. Concrete works of solid slabs in repeated residential floors.

Senior Consultant Engineer في National Center for housing and building
  • مصر - القاهرة
  • أغسطس 2016 إلى ديسمبر 2016

I joined this company as senior consultant Engineer for a project of building 420 building of social housing in badr city.

i started this project from beginning till now.
we are now n foundations stage.

QA/QC Civil Engineer في Saudi BinLaden Group , ABCD branch
  • المملكة العربية السعودية - مكة المكرمة
  • مايو 2014 إلى أبريل 2016

Working in Overpass "K" which connect EL Maliya Tunnels and Kudai Bus station, and goes over Ajyad Sreet, there was a ramp connecting Ajyad street and Overpass K.
This Bridge consist of two separate traffic directions 100m length each and the ramp length around 70m.



Overpass "K" is one of post tension Box section bridges which enhance my experience in the following:
1- Working under stress of rapid projects.
2- Excavation works and utilities relocation.
3- Heavy reinforced concrete works.
4- Coordinate with other trades (MEP, Survey, Transportation, … etc).
5- Installation of Post tension strands and its accessories.
6- Stressing of the post tension strands.
7- Installation of pre-cast parapet.
8- Temporary steel structure which goes over Ajyad street as alternative solution to prevent closing Ajyad street by scafolding.
9- Finishing Works (Asphalt, interlock, curb stones)

Site Civil Engineer في Saudi bin Laden Group (ABCD Branch)
  • المملكة العربية السعودية - مكة المكرمة
  • سبتمبر 2013 إلى مايو 2014

Working in Overpass "K" which connect EL Maliya Tunnels and Kudai Bus station, and goes over Ajyad Sreet, there was a ramp connecting Ajyad street and Overpass K.
This Bridge consist of two separate traffic directions 100m length each and the ramp length around 70m.



Overpass "K" is one of post tension Box section bridges which enhance my experience in the following:
1- Working under stress of rapid projects.
2- Excavation works and utilities relocation.
3- Heavy reinforced concrete works.
4- Coordinate with other trades (MEP, Survey, Transportation, … etc).
5- Installation of Post tension strands and its accessories.
6- Stressing of the post tension strands.
7- Installation of pre-cast parapet.
8- Temporary steel structure which goes over Ajyad street as alternative solution to prevent closing Ajyad street by scafolding.
9- Finishing Works (Asphalt, interlock, curb stones)

QA/QC Engineer في al futtaim carrilion
  • مصر - القاهرة
  • يناير 2011 إلى أغسطس 2013

1. QA/QC Engineer aims to achieve the quality required for each activity on site.
2. Factories visits are located in the responsibility of quality engineer to insure the quality of materials before supplying to site.
3. Quality engineer must follow up the activities and inspect prior to consultant inspection.
4. Lab tests must done by him. This tests are:
4.1 Soil test :
4.1.1 Modified Proctor test
4.1.2 CBR test
4.1.3 Los Anglos abrasion ratio
4.1.4 Soil classification according to AASHTO
4.1.5 Sand cone test
4.1.6 Load bearing test
4.2 Concrete tests:
4.2.1 Slump test
4.2.2 Temperature test before casting
4.2.3 Water absorption test on concrete cubes for water retain structures
4.2.4 Compressive strength
4.3 Asphalt Concrete tests
4.3.1 Temperature test
4.3.2 Flow test
4.3.3 Layer thickness (Core test)
4.3.4 Aggregate gradation
5. Sending IRF (Inspection requests) to the consultant.
6. Sending test result to consultant.
7. Submit material data sheets to consultant for approval.
8. Material inspection sent to consultant to inspect it on site.

الخلفية التعليمية

بكالوريوس, Civil Engineer
  • في faculty of engineering/alexandria univeristy
  • يونيو 2010

Specialties & Skills

Readings
Politics
computer programs
Internet &Computer
handball
reading
Football

اللغات

الانجليزية
متوسط
العربية
متمرّس

التدريب و الشهادات

EC-0502046 www.ecitb.org.uk (الشهادة)
تاريخ الدورة:
July 2011
صالحة لغاية:
August 2011

الهوايات

  • reading